HomeMy WebLinkAboutGNO10.0(: PNERALwi I. THE DRAWINGS AND SPECIFICATIONS WILL BE CONSIDERED AS MUTUALLY EXPLANATORY AND ANY WORK REQUIRED BY ONE BUT NOT THE OTHER WILL BE PERFORMED AS THOUGH REQUIRED BY BOTH IN CASE OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE ARCHITECT WILL DETERMINE. LARGE SCALE DRAWINGS WILL TAKE PRECEDENCE OVER SMALLER PLANS OF MINOR DETAIL. 2. DO NOT SCALE DRAWINGS VERIFY AND FOLLOW INDICATED DIMENSIONS. IN CASE OF 0I5- GREPANCY, NOTIFY THE ARCHITECT FOR HI5 DEG1510K BEFORE PROGEEDIN6 WITH THE WORK. THE DECISION OF THE ARCHITECT IN THE CASE OF A DISCREPANCY WILL BE FINAL. 3. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO PROVIDE FOR A COMPLETE AND FINISHED PIECE OF WORK, AND THE CONTRACTOR WILL NOT AVAIL TO OBVIOUS OR UNIN- TENTIONAL ERROR OR OMISSION AND WILL INCLUDE IN THEIR BID, PROVISIONS FOR ALL, LABOR, MATERIAL, AND SERVICES INCIDENTAL FOR A COMPLETE AND FINISHED BUILDING IN EVERY RESPECT. THI5 DOES NOT IMPLY THAT THE CONTRACTOR WILL BE REQUIRED TO FURNISH LABOR OR MATERIAL NOT OBVIOUSLY INTENDED, SHOWN OR CALLED FOR; HOWEVER, SHOULD HE BE61N MICRO WHERE A DISCREPANCY EXISTS BETWEEN THE DRAWINGS SPECIFICATIONS AND FIELD CONDITIONS, CORREGTION5 WILL BE MADE WHICH IN THE OPINION OF THE ARCHITECT BEST ALLEVIATES THE CONDITIONS WITH NO ADDITIONAL PAYMENT. 4. NO INTOXICATING BEVERAGES OR ILLE6AL SUBSTANCE WILL BE ALLOWED ON THE SITE OF THE WORK, AND NO PERSON WILL BE ALLOWED ON THE SITE INTOXICATED OR UNDER THE INFLUENCE OF INTOXICATING BEVERAGES OR ILLEGAL SUBSTANCE. FURTHERMORE, FROM THE TIME THAT THE DRIED -IN BUILDING SHELL 15 COMPLETED, OR ENGL05ED FROM THE ELEMENTS, NO SMOKING OR USE OF TOBACCO IN ANY FORM WILL BE ALLOWED INSIDE THE BUIL)IN6. 5. ALL MATERIALS STORED ON THE 51TE WILL BE ARRANGED AND MAINTAINED IN AN ORDERLY MANNER 50 THAT THE USE OF WALKS, DRIVES, ROADS AND ENTRANCES REMAIN UNENCUMBERED. 6, CONTRACTOR WILL BE RESPONSIBLE FOR THE DE516N AND INSTALLATION, INCLUDING ALL EQUIPMENT, MATERIAL, ACCESSORIES, TOOLS AND LABOR REQUIRED FOR THE COMPLETE OPERATION OF THE WORK, IN ACCORDANCE WITH ALL APPLICABLE CODE REQUIREMENTS AND MANUFACTURERS RECOMMENDATIONS. 1. IF THE CONTRACTOR A5GERTAIN5 AT ANY TIME THE REQUIREMENTS OF THE PRMIN65 OR SPECIFICATION CONFLICT WITH OR ARE IN VIOLATION OF APPLICABLE LAW5, CODES, REGULA- TIONS OR ORDINANCES THEY WILL NOT PROCEED WITH THE WORK IN QUESTION UNTIL THE ARCHITECT HAS BEEN NOTIFIED IN WRITING AND A WRITTEN DETERMINATION 15 MADE BY THE ARCHITECT. NO EXTRAS WILL BE ALLOWED TO MEET CODE REQUIREMENTS. 8. CONTRACTOR WILL PROVIDE ALL PERMITS AND ARRAN6E FOR IN5PECTIONS AS REQUIRED BY THE CITY, COUNTY AND/OR STATE AUTHORITIES. FURNI5H CERTIFICATE OF FINAL INSPECTION FROM THE LOCAL BUILDING INSPECTOR, INDICATING THAT THE INSTALLATION COMPLIES WITH ALL 6OVERNIN6 REGULATIONS. 9. CONTRACTOR WILL BE PROPERLY LICENSED TO PERFORM WORK AT THE LOCATION OF THE PROJECT AND WILL MAINTAIN ADEQUATE 5ERV16E FACILITIES LOCALLY. HE WILL PROVIDE REFERENCES OF AT LEAST THREE 5AT15FAC.TORILY 60MPLEE) PROJEGT5 OF SIMILAR TYPE AND SIZE TO THE OWNER. 10. CONTRACTOR WILL COORDINATE WORK 50 A5 TO CONFORM TO THE PROORE55 OF THE WORK OF THE TRADES, FOR THE COMPLETION OF THE ENTIRE INSTALLATION AS 500N A5 THE CONDITIONS OF THE BUILDING ALLOWS. 11. SHOP DRANIIN65 WILL BE SUBMITTED FOR ALL EQUIPMENT AND MATERIALS WHICH MUST INTERFACE AND COORDINATE WITH OTHERS. CONTRACTOR WILL SUBMIT 51X (6) GOPIE5 TO THE ARCHITEGT FOR REVIEW, 12. UPON COMPLETION OF THE WORK, THE CONTRACTOR WILL LEAVE PROJECT IN A GLEAN AND OPERATIONAL CONDITION. 13, CONTRACTOR WILL VERIFY AND COORDINATE ALL NEW AND OR EX15TINC CONDITIONS TO INCLUDE DIMENSIONS AT THE JOB 51TE FOR COMPARISON WITH THE DRAWIN65 PRIOR TO BIDDING THE PROJECT. SHOULD ANY DISCREPANCIES, INCONSISTENCIES OR OMISSIONS BE FOUND THE ARCHITECT WILL BE NOTIFIED IN WRITING IMMEDIATELY FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK. I4. ABBREVIATIONS THR006HOUT THE PLANS ARE TH055E STANDARD TO THE INDUSTRY AND IN COMMON USE NOTIFY THE ARCHITECT OF ANY ABBREVIATIONS IN QUESTION. 15, CONTRACTOR WILL COORDINATE THE INSTALLATION OF VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE ALL CEILIN65, (INCLUDING BUT NOT LIMITED TO STRUCTURAL MEMBERS, MECH- ANICAL DUCTS, INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEM, LIGHT FIXTURES, GEILIN6 SYSTEMS AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND WILL BE RE5PON- 51BLE FOR MAINTAINING THE FIN15H GEILIN6 HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS AND THE FINISH SCHEDULE. GEILIN6 HEIGHT DIMENSIONS ARE TO THE FINISH SURFACE OF THE 6EILIN6. 16. ACCE55 PANELS WILL BE PROVIDED AND INSTALLED WHEREVER REQUIRED BY THE BUILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL EQUIPMENT WHETHER OR NOT INDICATED ON THE DRAKN65. CONTRACTOR WILL GOORDINATE SIZE, LOCATION AND TYPE OF ACCESS PANEL WITH OTHER CONTRAGTOR5 WORK AND RECEIVE THE APPROVAL OF THE ARCHITECT. ALL ACCESS PANELS SHALL MAINTAIN THE FIRE RATING OF THE ASSEMBLY WHERE INSTALLED. IT, DIMENSIONS SHOWN ON THE FLOOR PLANS, SECTIONS, ELEVATIONS AND DETAIL5 ARE TO FACE OF STUD, MASONRY, CONCRETE OR STRUCTURAL GRID GENTERLINE5 UNLESS OTHERWISE NOTED. 18. ALL DUCT PENETRATIONS THROUGH PARTITIONS AND CEILIN65 WILL BE PROVIDED WITH Ni ESSARY FRAME5 AND BRACING AROUND THE OPENING AND WILL MAINTAIN THE FIRE ASSEMBLY RATING OF THE WALL OR CEILING TO INCLUDE FIRE DAMPERS WHERE REQUIRED. IT THE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND SHOP DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWIN65 AND WILL BE COORDINATED BY THE CON- TRACTOR. THE CONTRACTOR WILL COORDINATE ALL DRAWINGS AND 5PECIFICATION5 PRIOR TO PROCEEDING WITH THE INSTALLATION OF ANY WORK, AND BRING ANY D156REPANGIE5 TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. 20. IMPROPERLY INSTALLED WORK WILL BE CORRECTED BY THE CONTRACTOR AT HI5 EXPENSE AND AT NO EXPENSE TO THE ARCHITECT, THE ARCHITECT5 CONSULTANT'S, THE CONSTRUCTION MANAGER OR THE OWNER. 21, CONSULT THE ARCHITECT AND PROJECT STRUCTURAL ENGINEER IN ALL GASES WHEN CUI'TIN6 INTO AN EXISTIN6 OR NEW STRUCTURAL SYSTEM. RELEASED FOR CONSTRUCTION Subject to romp Dew ith all regulations of State and Local Codes City of Camel DATE: 04/22/19 NOTES: 22. ALL EXIT DOORS WILL BE OPERABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT AND WILL BE ACCESSIBLE TO THE HANDICAPPED. 23. THE MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED THE FOLLOWING REQUIREM- ENTS: INTERIOR DOORS 5 POUNDS, EXTERIOR DOORS 8.5 POUNDS AND FIRE RATED DOORS 15 POUNDS. 24. EMERGENCY EXIT5 WILL NOT BE BLOCKED AT ANY TIME. 25. WHEN IT MAY BE NECESSARY TO INTERRUPT ANY UTILITY SERVICE TO MAKE CORRECTIONS AND OR CONNECTION A MINIMUM OF 48 HOURS ADVANCE NOTICE WILL BE 61VEN TO ALL AFFECTED PARTIES. INTERRUPTIONS IN UTILITY SERVILE WILL BE OF THE SHORTEST POSSIBLE DURATION. 26. IN THE EVENT THE UTILITY SERVICE 15 INTERRUPTED WITHOUT THE REQUIRED 48 HOUR NOTICE THE CONTRACTOR WILL BE FINANCIALLY LIABLE FOR ALL DAMAGES SUFFERED BY THE OMNER DUE TO UNAUTHORIZED INTERRUPTION. REONNECTION WILL BE MADE AS SOON AS POSSIBLE. 21. WORK INSTALLED IN CONFLICT WITH THE DRAWINGS, SPECIFICATIONS OR SHOP DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND NO ADDITIONAL EXPENSE TO THE OI^NER OR THE ARCHITECT. 28, CONTRACTOR WILL PROTECT ALL FINISHED WORK AND SURFACES OF FINISHED WORK FROM DAMAGE DURING THE COURSE OF CONSTRICTION AND WILL REPLACE AND OR REPAIR ALL DAMAGED CAUSED BY THE CONTRACTOR TO THE 5AT15FAGTION OF THE OWNER AND ARCHITECT. 29. 51ZE OF MECHANICAL AND ELECTRICAL EQUIPMENT PADS OR BASES SHALL BE VERIFIED WITH EQUIPMENT MANUFACTURER. 30. ALL BUILDING CONSTRUCTION WORK, MECHANICAL, AND ELECTRICAL INSTALLATIONS, AND EQUIPMENT CONNECTIONS REQUIRED AS PART OF THIS PROJECT SHALL COMPLY WITH THE STATE BUILDING RUMBA AND REC-0LATIONS, LOCAL ORDINANCES, AND ANY OTHER STATUTORY PROVISIONS PERTAINING TO THIS 6LA55 TYPE OF WORK, ANY 5J6H RULES AND REGULATIONS SHALL BE CONSIDERED AS PART OF THE SPECIFICATIONS AND DRAWI1,65. 31, CONTRACTOR PERFORMING WORK ON THE PREMISES WILL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND 9UPERVI51146 A REASONABLE AND PRUDENT SAFETY PRO6RAM UNDER APPLICABLE LAWS INCLUDING BUT NOT LIMITED TO THE ISOLATION OF WORK AREAS AND THE PROMPT REMOVAL OF DEBRIS OR TOOLS WHICH MIGHT ENDANGER HEALTH, SAFETY OR PELL- FARE OF PERSONS. 32. CONTRACTOR WILL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACKUP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL GA5EHORK, TOILET ACCESSORIES AND ALL FLOOR MOUNTED OR SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT. 33, CONTRACTOR WILL VERIFY THE LOCATION OF ALL EXISTING UTILITIES SELDOM OR ABOVE GRADE AND COORDINATE RELATED 5ERVIGE CONNECTIONS WITH THE RESPECTIVE UTILITY COMPANY, 34. CONTRACTOR WILL COORDINATE THE REMOVAL, ABANDONMENT, AND OR RELOCATION OF EXISTING UTILITIES ABOVE OR BELOW GRADE WITH THE RESPECTIVE UTILITY COMPANY. 35. CONTRACTOR WILL PERFORM ALL THE WORK WITHIN RELIC RI6HT-OF-HAYS AGGORDIN6 TO THE CITY JURISDICTION FOR STANDARD PLANS AND SPECIFICATIONS CONTRACTOR WILL OBTAIN PERMITS FROM APPROPRIATE AGENCIES. 36. CONTRACTOR WILL PROVIDE TEMPORARY BRACES, SHORES AND 6URD5 REQUIRED TO SUPPORT ALL LOADS TO WHICH THE BUILDING STRUCTURES, UTILITIES AND RI6HT-01 MAY BE SUBJECTED DURING CONSTRUCTION. 31. CONTRACTOR WILL PROVIDE ONE COMPLETE SET OF A5-BUILT DRAWINGS INDICATING ALL DISCREPANCIES OR CHANGES FROM ORIGINAL DESIGN DOCUMENTS INDICATING ACTUAL LOCATIONS OF CONGEALED WORK TO THE ARCHITECT AT THE COMPLETION OF WORK AND PRIOR TO FINAL PAYMENT. 38. DRAWINGS OF EXISTING 51TE OR BUILDING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA SUPPLIED BY OTHERS TO THE ARCHITECT. THE ARCHITECT MAKES NO WARRANTY EITHER EXPRESSED OR IMPLIED FOR THE ACCURACY OR COMPLETENESS OF THE EXISTING INFORMATION RECORDED. CONTRACTOR WILL FIELD VERIFY ALL EXISTING CONDITIONS. 31 INSTALLATION OF FIRE ALARM SYSTEM, AUTOMATIC FIRE SPRINKLER SYSTEM AND STANDPIPE SYSTEM WILL NOT BE STARTED UNTIL DETAIL PLANS, SPECIFICATIONS AND ENGINEERING CALCULATIONS HAVE BEEN REVIEWED BY THE ARCHITECT AND AN APPROVAL HAS BEEN ISSUED BY THE DEPARTMENT OF JURISDICTION. 40. FIRE ALARM 5Y5TEM5 WILL BE APPROVED / REVIEPED BY THE LOCAL 5EVIGIN5 FIRE DEPARTMENT HAVING JURISDICTION PRIOR TO INSTALLATION. 41, ALL CONCRETE FLOORS MUST BE 5000 P51 COMME551VE 5TREN6RI AT A 28 DAY TEST. 42. ALL DRYWALL SHALL BE 5/8" TYPE 'X" ONE -HOUR FIRE RATED: TAPED, SPACKLE) 5ANDED, AND READY FOR PAINTING. 43. BAG H SUBCONTRACTOR SHALL DO H15 OWN GUTTING AND PATCHING A5 REQUIRED FOR HI5 PORTION OF THE WORK. 44. HANDICAPPED TOILET ROOMS TO BE PROVIDED. PROVIDE SPAR BARS A5 PER A D.A. REQUIREMENTS AND 5'-0" DIAMETER CLEARANCE IN EACH SPECIFIED TOILET ROOM. 45. SO. SHALL BID TO SUPPLY AND INSTALL 4' BATT INSULATION IN RE5TROOM WALLS. IF PROJECT HAS YOUTH AREA, WALLS SHALL BE SOUND INSULATED FROM REMAINING BUIL0I146. SO. SHALL CONFIRM WITH OWNER FOR ANY ADDITIONAL ROOMS WHICH HE MAY REQUIRE TO BE SOUND INSULATE[) 46. PAINTING: ALL 5URFACES SHALL BE PREPARED FOR NEW PAINT OR FOR REPAINTING - DRYWALL FIRST COAT PRIMER AND TWO (2) TOP COATS OF LATEX E66 SHELL ENAMEL WOOD: FIRST COAT PRIMER TOP COATED WITH LATEX TRIM METAL. FIRST COAT ZING CHROMATE PRIMER, TOP COATED WITH METALA5116 ENAMEL, OR ENAMEL KITCHEN AREA AND ALL REST ROOMS SHALL BE PAINTED WITH FIRST A PRIMER AND TOP COATED WITH ALKYD -SEMI, OL055 ENAMEL. Lau ACCEPTED BY OWNER ACCEPTED BY DESIGNER DATE: ACCEPTED BY CONTRACTOR CA ESFO5I 5I LI"� 7I R I XDES OWN:O HO I �ER NOTE: REFER TO ALL SHEETS FOR ADDITIONAL RE5PON51 EUTIE5 6C: PRIMARY CONTRACTOR 505-CONT: 5UB-GONTRAGTOR AFFECTED SERVICE DESCRIPTION PROVIDE INSTALL ELEC. SAS, WATER SEWER REMARKS GENERAL PERMITS C/SUB-CON C/S-Ii EACH TRADE TO SUBMIT PAPERWORK - FEES PAID BY OWNER BARRICADE / FENCING, 66/OWN 6C/0WN DUMPSTERS 6C/OWN 66/OWN SUPERVISION 66/OWN 6G/0WN SELECTIVE DEMOLITION 6C/SUB 66/5UB OPEN WALLS FOR ELECTRICAL AND PLUMBING METALS THREADED RODS 6C/SUB 6G/5U13 GOUNTER BRACKET 6C/SUB 66/5UB LT CAUSE FRAMING, 6G/5113 6C/SUB WOOD AND PLASTIC WOOD BLOCKING IN WALL - FT MATERIAL 6G/5013 66/5UB GOUNTERTOPS 5C/SUB 6C/5UB MILLWORK AND TRIM 6C/SUB 66/51)B PLYWOOD - FT MATERIAL 6G/SUB 6G/51)B FRP WALL PANELS 5G/SUB 6C/SUB 4" WALL BASE 5C/SUB 66/5UB FINISHES GONGRETE SEALER 6G/50B 6C/5UB FRP WALL PANELS 6C/SUB 66/5113 GYPSUM WALLBOARD GG/5UB 6G/5UB INTERIOR WALL PAINT 6G/5113 6C/51,13 4" WALL BASE 6C/5013 66/SUB GERAMIG TILE 6G/5U13 6G/5UB DRYWALL 6EILIN6 5G/SUB 66/51AB Hi RTU LL LL X Y DUCTWORK SG/SUB 6G/SUB IV THERMOSTAT 6G/5UB 6G/5UB X TERMINALS 6G/SUB 6G/5UB X EXHAUST FANS 6G/5UB 66/5UB X PLATFORM PIPING 5G/5113 6G/51[B PEDICURE EXHAUST UNIT OWN/6G OWN/6G PLUMBING PLUMBING FIXTURES 6G/SUB 6G/SUB X X WATER PIPING 6G/SU3 6G/SUB X SEWER PIPING AND EXCAVATION 6G/5UB 6G/5UB X FITTINGS AND FAUCETS GG/SUB 6G/5UB X BRACING AND HANGERS 6G/5UB 6G/51,13 X ELECTRICAL LIGHTING FIXTURES AND BOX (AS NECESSARY) 6G/5U13 6G/510 X POWER OUTLETS AND BAGKBOX GG/5UB 6G/51B X BRACING GIRCUITIN6 CONDUIT AND WIRE GG/5UB 6G/5UB X BRACING AND HANGERS GG/SUB 6G/51B X TRIM AND FAGEPLATES 6G/5UB 6G/51,13 X DISGONNECTS 6G/5U5 6G/510 X RESP®N5I 5I I.7 �PIAi I X AND &ENERAL N07E5 0 .y W aiE��e U Q �Vxz" M 0 w a O Q `law fn . o � as E Q. z " -CNATURE[y CBD