HomeMy WebLinkAboutE 1ELECTRICAL GENERAL N07E5
I. All electrical work, Installation, equipment shall comply with the current
N.E.G. (NFPA 10), State and Local Code Requlrement5, to assure a
complete, Safe and workable System.
2. All disconnects shall be labeled For identification. Disconnects shall be
Installed as per the motor and/ar equipment morufocturer'5
recommendations. Verify mounting location, at Jab Site.
3. Provide a NEMA 3 outdoor rated disconnect switch and weather -
protected, ground -fault protected convenience outlet at each
Packaged RooF-Top Unit, Heat Pump or Air Conditioning Compressor
location.
4. The electrical system shall be grounded throughout and shall be bonded
to the metal pipe cold -water entrance line, building steel and (5) 10
foot copper rod grounding field, at the service entrance.
5. The emergency lighting system shall be a battery pack type, solid stole,
permanently wired Into a all with a lock -on breaker.
b. The final location of convenience outlets and power requirements shall
be verified "Ch the Owner, other trades and mechanical units prior to
rough -in. Mount 15" A.F.F., typical unless otherwise noted. Location and
mounting heights shall comply with current AN51 Standard for
Accessibility for People with Deabllltles.
1. The Electrical Contractor shall coordinate his work with all other
trades to assure a complete and workable system.
8. The Electrical Contractor 51holl conFirm all aspects of now Service
entry, prior to Bid, include all costs connected with some. Coordinate
new service to comply with local utility company standards. The E.G.
shall provide Installation and hook-up of new service.
9. All dimensions must be verified In the Field.
10. The Electrical Contractor shall provide empty P.V.G. conduit with
pull -wires for the sound system where shown on the plans. Verify
location, quantity and sizes with the Owner and/or AudloNlsual
Gonsultant.
11. P.V.G. conduit under 51ob may be used if permitted by the State and
Local Codes.
12. Sanctuary light Fixtures to be verified with Owner. The Electrical
Contractor shall submit fixture types for approval, prior to ordering.
The E.G. to furnish and install.
15. Mount all 5w Rches at 48" A.F.F., typical unless otherwise noted.
Location and mounting heights shall comply with current ANSI Standard
for Accessibility for People with Disabilities.
14. Final location aF Floor outlets for mike jacks and power shall be
coordinated with the Owner and/or AudloNisvol Consultant, prior to
installation.
15. The Electrical Contractor shall verify the voltage available for the
project, either single or three phase. The E.G. shall be responsible for
equipment compatibility with voltage available for the project. The E.G.
shall coordinate with all other Trades and Contractors.
16. All wiring shall be in metallic conduit or MG cable type, as per NEC,
Slate and LoCol requirements.
17. All wire shall be minimum #12 AW6; copper. All 120 V; 20 Amp circuits
over 100', in length, shall be #10 AW6, copper.
Aluminum or or Coffer -Clad Aluminum Wire Will Not Be Accepted.
Aluminum Wire Will Not Be Accept d.
18. The Electrical Contractor to wire all inater heaters, provided by
others.
lq. The Electrical Contractor to wire all exhayst fans, provided by others.
Provide Z Pile switches, where E.F. 15 controlled by light 5witch.
20. The Electrical Contractor shall ground the Spire Air Terminal as per
NEC and the Lightning Protection Institute 6uidellna5.
21. The TimeUock to be coordinated and confirmed with the Owner and/or
General Contractor. Timeolack shall be 208/240 V; I Phase; 20 Amp.;
1-Day; 24-Hour; Day Excluslon capability; Reserve Power. Timeclock
shall be NEMA I enclosure, control by Photocell.
22. Telephone locations to be coordinated and confirmed with the Owner.
The Local Telephone Company to Install.
25. The Electrical Contractor shall base bid on 120/240 V; 10 power supply
to project. If 1201208) V; 30 power supply 15 available, and and may
be brought to project at no additional cost to the Owner; the E.G. shall
present option to the owner and/or General Contractor for approval
and direction. Upon selection of service type (10/30), the E.G. shall
confer with all other Trades and Contractors for coordination of
equipment ordering and requirements.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
nacre. ! All 0
LIGHT PIXTURE SCHEDULE
MARK
SYMBOL
MANUFACTURER AND NUMBER
MOUNT
LAMP
REMARKS
F-t
®
CREE 6KR 4K 4000 LUMEN
RECESSED
LED 28K 4KL
120V LED UNIT WITH DRIVER
F-2
BRDAN HD80L LED
SURFACE
1) 16W LED1600 LUMEN
COMBINATION FAN/LIGHT UNIT
F-3
CREE LS SERIES 4KR 4K 3000 LUMEN
SUSPENDED
LED 4K 3KL
66W
120V LED UNIT WITH DRIVER
®
F-4
DECORATIVE PENDANT -SELECTION BY TENANT
SUSPENDED
(3)LED 04/K 4KL
120V LED UNIT WITH DRIVER
X-t
I®I
DUAL LITE IF LX U R W E
UNIVERSAL
LED
120/277 VAC, UNIVERSAL, DOUBLE FACE, NICKEL -CADMIUM BATT.
X-2
LH
DUAL LITE IF LZ25N-12V
WALL
+90° A.F.F.
HAL MR-16
120/277 VAC, 12 V., 2 HEAD WALL -PACK, NICKEL -CADMIUM
X-3
DUAL LITE N LT U R W 3-0
UNIVERSAL
LED
120/277 VAC, UNIVERSAL, HEADLESS, REMOTE CAPABLE, NICKEL -CADMIUM BATT.
X-4
=
DUAL LITE It LXTOS
WALL @ +90° A.F.F.
HAL MR16
1201277 VAC, 12 V., SINGLE REMOTE HEAD, WET LOCATION
NOTES: ALL FIXTURES, LISTED ABOVE, MAY BID WITH A PRE -APPROVED EQUAL.
LOCATION: REAR HALL WALL
PANEL MARK: "A"
REMARKS: COPPER BUS
VOLTAGE: 120/208
PHASE: 3
WIRE: 4
MOUNTING: FLUSH
MANUP: GTLR-HMR
TYPE: GH
U
DESCRIPTION:
H.P.
SIZE
LOAD
BRK'R.
PHASE
SR1i
LOAD
SIZE
H.P.
DESCRIPTION:
tt
p
C
W
kW
AMP
A
B
C
AMP
kW
C
W
1
L16HT5
s/a"
#12
.82
2
��
1.20
CO
514
514"
#12
#12
OUTLETS
OUTLETS
2
4
3
LIGHTS
s/4
#12
1.10
_
20�
20
20�
0
20�
0
20�
��
0
0
0
5
EM LIGHTS
5/4'
#12
.30
_20�
20
1.20
514"
#12
OUTLETS
6
1
SPARE
s/4"
#12
--
CO
s/4"
#12
OUTLETS
8
9
OUTLETS
s/4"
#12
1.20
_20�
0
1.20
5/4'
#12
OUTLETS
10
II
OUTLETS
s/a"
#12
1.38
_
1.20
5/4"
#12
OUTLETS
12
13
OUTLETS
s/4"
#12
1.55
_��
0
- -
5/4"
#12
SPARE
14
15
516NA6E
5/a"
#10
1.50
_
30
- -
5/4"
#12
SPARE
16
I7
1.50
- -
s/4"
#12
SPARE
18
19
SPARE
s/4'
#12
1.20
_ 0
0
- -
5/4"
#12
SPARE
20
21
SPARE
s/4"
#12
AO
- -
5/4"
#12
SPARE
22
23
WATER HEATER
y/a
#10
L50
_
30
- -
5/4"
#12
SPARE
24
25
1.50
20
0
20
20
30
- -
5/4"
#12
SPARE
26
21
SPARE
-
-
- -
20
- -
s/a"
#12
SPARE
28
2qJ
SPARE
-
-
- -
20
--
--
--
SPARE
30
31
SPARE
-
-
- -
_
20
--
-
-
SPARE
32
33
35
SPARE
SPARE
-
-
-
-
_ _
- -
_
30
40
SPARE
34
36
31
RTU
5/a
I"
#8
1.96
1.96
Ab
-A
1E-42SERVICELOAD:
60
L
--
--
SPARE
38
39
4041
14.53 AMPS
CONNECTED LOAD:
896
8.16
90426.16
kW.
DEMAND LOAD: 21.40 kW.
MAIN SIZE: 200 AMP
MAIN TYPE: MLO
FEED LOCATION: BOTTOM
BUS SIZE: 200 AMP
CONDUIT & WIRE: 2 1/2" R161D PVC w/ THHW:
TYPE & SIZE: (4) #510 AW6 d (I) #3 AW6 SEND,
NOTE: LOADS MAY VARY DEPENDING ON BRAND OF EQUIPMENT INSTALLED, E.C. TO COORDINATE WITH OTHER TRADES
,Dru:
e Jawrv®iMme me tent mpe or me pre" m n, ,,rimmeavY
. the (fiffl Oft he gliding.t he maim arcut elelement
ne�perr.,..a:,ala rneae,,.mei
®elrwtOr mtmlm allwme mwo-m mr mu wrtemmme am
i[Cenn 0f FOr ulmmw er Jv o:n:e::e, , N,:gemend in, M tm 4end ni
ined Or a m the me m tmmmttnni mnmau sent .ifot ele
a^end tvi Orth,evi
PH:
ISSUE:
II
1
\ CIR 5
\ X-4
U CI R X`
\
I
I
I
I
F-3 F-3
CIR 3 CIR
I / \
F-3NIL
`
v R 5
F-3 I
CIR 3 V
F-3
CIR33 CIR 3 V
\ 1 \
\ I \
F-3 F-3
SIR 3 J-T
/ I
/
1 /
I I
I I
I I
F-3
AR 3
F-3
IR 3
-3
R 3
CIR 31f7^���y���l��jxJJJ
F-2T
\ I I
\ I `
\ 1
F-3
\ a ` CIR 3
3
CIR 1-- / F-1----T�/ CIR 1
/ CIR L
I I I I
I I I I
-4
CIR 11
F-1
QCIR 1
F 1 F-1
I / / CIR 1 / / CIR 1
ECIR 1 I /
F-1NIL
\
QCIR 1 V CIR 5 F-1
V CIR 1
I 1 I \ I
1 I.
]R41 h-CIR 1 \bCIR 1 `b
1 CIR F 1 / F--
X-3 /
EXIT /
x-4
CIR 5 \
LI&HfiIN&
SCALE: 114" = P-O"
LmI &1-17`N& FA N $ NOTES
E
o
t^
M
O
Q
H
4
W
a
w
a
Q
a
F¢y
o
O
oz^
0.
ccdc��
G
N
I--i
51111
a
0
M
W
al
c.w
.
o
�
a
rd
la
d
M
E
-tNATUREIV
CBD -