Loading...
HomeMy WebLinkAboutAD-101 FIRST FLOOR DEMOLITION PLANZNZ p3 ZZW Q E- Z �Q NOZO U LI ZU00 U 2Yj s a3�w pm Z UryQ yU �Za2� p6 0 Q J OLIO p� 11 ¢ $$$$ w D p VVmO too NV3 REVISIONS NO. Description & Date NO. Description & Date NO. Description & Date JOB NO.: IDB-119-2607 DATE: 1-I8-19 DRAWN BY: RS CHECKED BY: RS/SV I •1 Na ARt070pp51 STAMM GENERAL SIGNATURE loxhi DEMOLITION NOTESdravinaand No �U .And e. Ithe q .�,R� mwA o d or ( ALL NOTES MAY NOT PERTAIN TO THIS SHEET) VN �..sthout oxin^- want. A UNLESS NOTED OTHERWISE, DEMOLITION TO BE PART OF THE WORK BY GENERAL CONTRACTOR. COORDINATE WITH OTHER PRIME CONTRACTORS TO SEE IF THERE ARE ITEMS TO BE REUSED. B DEMOLITION CONTRACTOR IS TO VERIFY HIS WORK IN THE FIELD WITH THE DEMOLITION DRAWINGS, NEW CONSTRUCTION DRAWINGS, AND THE EXISTING IN -FIELD CONDITIONS. REPORT DISCREPANCIES —TYP. ALL - — - - — — - — - - - - - —----------------- - - - - - - - - - - - - - r0 THE ARCHITECT. TYP. ALL NG EES AND SHRUBS HOWN TO 3 „--� WI _-_-Ai O% 19 FOO WINDOWS C REXE•MOIVED SHALL BE PROTECTEDOBYSCONTRACTORE .n ii 24 ,iN 22 2 ii w- 5 6 �'ii 24 F� 5 fi nO -< O n q O DURING DEMOLITION. THESE ITEMS SHOULD BE __ O O Oi�i ____= O 5 6 3 \ BROUGHT TO THE ARCHITECTS ATTENTION. ii00 If-Oy 21 21 ,�N D "FLOORING" DENOTES FLOOR COVERING MATERALS � � ' ' � � INCLUDING BACKINGS, ADHESIVES, BASES, DOWN 2 R= _ 2 5 6 _ _2______ J' TO BUT EXCLUSIVE OF FLOOR SLABS AND 'c --- --... i 6 'iO 22 22 1 111 OO -- STRUCTURAL MATERIALS. UNLESS NOTED z _ 5 6 FO OTHERWISE. O E CEILING' DENOTES CEILING MATERIALS INCLUDING 3 „ SUSPENSION SYSTEMS ADHESIVE RESIDUES, 11 - - _____ 0 17 III 17 ��iO O i� ii ii iii ��ii��� iii ii -ii iiO 5 6 5 6TYPALL MOLDINGS, UP TO BI1T EXCLUSIVE OF v% It 11 �DQ TIP. A11 _ ____________�r �O I 14 , 2 „ (5 6 'i y STRUCTURAL MATERIALS. WINDOWS �`-' O-- O 2 4 iii a ii iU " 11 WIN2DOW5 F AFTER THE DEMOLITION OF MATERIALS, THE w 2< , iL_ i_ 2 L ni ,, i -�---- O , i i RESULTING EXPOSED SURFACE SHALL BE SMOOTH t.! Q O �i ii� Oi 7 2 ii AND FLUSH WITH EXISTING CONDITIONS. z G "ITEMS TO BE REMOVED BY CONTRACTOR" SHALL Q 2 p 5 5 fi-----_O___-_-_-_-_- INCLUDE WORK BY OTHER TRADES, INCLUDING 5 6 5 fi R' �Ii ---- _i yi ,i SITE STRUCTURAL, PLUMBING, MECHANICAL AND W -- __—__—_ �-- u_/ I�`TJIFi 222 2 ` r Ii ��_______ 2Oii 5 6 ry N ELECTRICAL. us AND ELECTRICAL ITEMS THAT ARE sn Z n 0 —"Qi "i n C EXISTING BULKHEAD �u �-• _ n 21 iii _ _ �__ _ _ BE LOCATED _ — — ni , 3 ,iv_. _ HEAD �� L 'I ,it — — — — _ II EXISTING BULK CAPPED AND ABANDONED SHALL O �1 TO REMAIN __ _ ,i TO REMAIN BEHIND FINAL FIN ♦a /� — — — _ — IN — — — — 4 J COORDINATE THIS WORK WITHS DEMOLITION WORK W /L/ ��, "- 10 10 ------ ----�y-------- ON SITE STRUCTURAL, PLUMBING, MECHANICAL, 0 r f------ 2 AND ELECTRICAL _ -------------------------------- ------------- o Ua 5 fi IE- K � 22 22 22 22 5 6 TO REMAIN OWNER. 22 OF OFF- ITEFUNLES OTHERWISE DIRECTEDBY Q 17 17 2 O �O 17 17 17 OWNER. O - - L OWNER TO REMOVE EXISTING Q - ,/�� ---- ----- - - - --- - - - --_-- - __=_�=_�=_�= -- --- - - FURNITURE/CASEWORK/MISCELLANEOUS ITEMS NOT z O 1 I1 13 �� ,U/ SHOWN AND NOT TO BE DEMOLISHED, IN �,�y�,p �u-�� ACCORDANCE WITH SALVAGE SCHEDULE. iii Y 2 ❑ CONTRACTOR TO NOTIFY OWNER IN ADVANCE WHEN ITEMS NEED TO BE REMOVED. CONTRACTOR O 13 iii L�: 5 6 IS RESPONSIBLE FOR OTHER ITEMS TO BEREMOVED. Wi5 82i li iiO M REMOVPL OF ALL SIDEWPII(S, LANDSCAPING, ETC.�/iARE TO BE REMOVED PER SITE DRAWINGS. to12 'BUILDING DEMOLITION TO BE COORDINATED WITHWSITE DEMOLITION. LU ------- i� L- 8 5 6 DAMAGED MATERIAL. REFINISH TO LIKE NEW 7 -O___ -- _ CONDITION, OR IF CONDITION WARRANTS REPLACE i-� IN ENTIRETY. (�J 0 THE OWNER SHALL RESERVE RIGHT TO CLAIM ANY `--' `--' 7 IiO MATERIALS THAT ARE BEING DEMOLISHED PRIOR TO THE CONTRACTOR DISPOSING OF THEM OFF 5 fi Q9 _ - DEMOLITION NOTES O -- — — — — — — ---- — py 9 --- 2 __------ 17--------- 17----- 17-----�__ 22 O2 17 17 17 "' ALL DEMOLITION AND NEW WORK TO BE IN O O O� EXISTING BULKHEAD ACCORDANCE WITH GENERAL DEMOLITION NOTES. EXISTING BULKHEAD F TO REMAIN 5 8 3 ` 3 2p i 5 6 TO REMAIN — n. N UNLESS NOTED —�i _------_— �y_____���`7=L ALL COLUMNS, STRUCTURE ETC. TO REMAIN — — 22 ; , _ ---- },- r-r--,^ iL 5 6 , 7 OTHERWISE ON STRUCTURAL DRAWINGS. �I� ® -- __------- rF/ _ O O — — 2O ���I 1. REMOVE EXISTING WALL AS REQUIRED FOR NEW —_ __---__—'.-.—_ice— u_—__ � - __ ____ _____ TO I WINDOW !L_ 5----_--�i -- H 3 AATCH EXISSTIN , ANDAND EAL NE FACES OF NEW AREA AS UMATTEERIAL WITH 24 q u_ a nt ii 2 ° = u T i, �1 i EXISTING 00 5 B 2O" `-- 7- -rr 2. REMOVE EXISTING WALL COMPLETE i1 5 6 a i�---- ------- 3. REMOVE EXISTING DOOR, FRAME AND HARDWARE.Cz 'i Q ,I a 4. REMOVE EXISTING HARD CEILING COMPLETE I� 'H' O 'I� y O y 5 20 'i�� 4 5. REMOVE EXISTING LAY -IN CEILING COMPLETE / O--------------- n - IYP. ALL 6. REMOVE EXISTING FLOORING AND BASE COMPLETE 2 � ` ______________ �� I�� n WINDOWS 7. REMOVE EXISTING CASEWORK COMPLETEIL S 6 II ____��_________it ---0 = -__� --� 2 `--T tl /Jln 2 W F - - - O; O F'i�i0 44 8. REMOVE EXISTING PLUMBING FIXTURE, REFER TO PLUMBINGDEMOLITION O 11 ii 5 6 ii 2 _______ _______ NGS 9. REMOVE EXISTING I DISPLAY BOARDS O 5 6N SHELF U n u 11, REMOVE EXISTING WOODS E 5 fi 2 " i OO n Ou 22 22 OO Op 12. REMOVE EXISTING CUBICLES COMPLETE \ O '� _ L 13, REMOVE EXISTING COUNTER SHELFCOMPLETE CO �-----------Ii ,O L� _______________ Q fl 13. REMOVE EXISTING ROD AND SHELF COMPLETE ice_____________ —II / 3 - 14. REMOVE EXISTING SEATING BOOTHS COMPLETE O �--� 2 =_� 15. REMOVE EXISTING RECEPTION DESK COMPLETE W ID O 16. REMOVE EXISTING CUBICLES COMPLETE, REFER TO a On 5 8 9 `� 5 6 �''/ 17. REMOVE EXISTING EQUIPMENT WOOD TRIM FOR NEW FROM RECESS AREA YOUT TIP. ALL "H OO 'IliO WIND WS WIND ALL TIP. ALL..: :.. WINDOW iiO uO 11 WINDOWS © WINDOWS WINDOWS 18, REMOVE EXISTING WNri WALL COVERING 24 O3 24 24 24 19. REMOVE EXISTING COUNTER AND SUPPORTS -- -,� - - - - - - 20. REMOVE EXISTING CERAMIC TILE COMPLETE THIS AREA AND , PREP FLOOR TO RECEIVE NEW FLOOR FINISH 21. REMOVE EXISTING WALL NICHE DISPLAY COMPLETE 23 22. REMOVE EXISTING ANY. WALL COVERING COMPLETE 23. REMOVE EXISTING FILM FROM EXISTING GLASS COMPLETE SHEET 24. REMOVE EXISTING WINDOW BUNDS COMPLETE 25. REMOVE EXISTING WALL CABINETS AND RELOCATE TO SECOND FLOOR MAIL ROOM RELEASED FOR CONSTRUCTION 26. EarnNG EXISTING BASS CABINETS NICE RELOCATE TIGHT TO /A Dow 10 I 27. REMOVE EXISTING LOCKERS AND RELOCATE TO FIRST /`''� n FIRST FLOOR DEMOLITION FLOOR PLAN NEW PLANS TING AR LOCKER ROOM Subject to compliance with all regulations 28. REMOVE EXISTING ARTWORK AND RELOCATE AS SHOWN ON at te and S�City of Cannlelu�s 1 DEMOLITION OPLAN SCALE: 1/8" = 1'-0" FIRST ��G1OJI NORTH PROPRIE ARY AND CONFIDENTIAL DATE:: U4/ 11/ 19