n SECOND FLOOR DEMOLITION FLOOR PLAN
SCALE: 1/8" = 1'-0"
NORrx
GENERAL
DEMOLITION NOTES
( ALL NOTES MAY NOT PERTAIN TO THIS SHEET)
A UNLESS NOTED OTHERWISE, DEMOLITION TO BE
PART OF THE WORK BY GENERAL CONTRACTOR.
COORDINATE WITH OTHER PRIME CONTRACTORS TO
SEE IF THERE ARE ITEMS TO BE REUSED.
B DEMOUTION CONTRACTOR IS TO VERIFY HIS WORK
IN THE FIELD WITH THE DEMOLITION DRAWINGS,
NEW CONSTRUCTION DRAWINGS, AND THE EXISTING
IN —FIELD CONDITIONS. REPORT DISCREPANCIES
TO THE ARCHITECT.
C EXISTING TREES AND SHRUBS NOT SHOWN TO BE
REMOVED SHALL BE PROTECTED BY CONTRACTOR
DURING DEMOLITION. THESE ITEMS SHOULD BE
BROUGHT TO THE ARCHITECT'S ATTENTION.
D "FLOORING" DENOTES FLOOR COVERING MATERIALS
INCLUDING BACKINGS, ADHESIVES, BASES, DOWN
TO BUT EXCLUSIVE OF FLOOR SLABS AND
STRUCTURAL MATERIALS, UNLESS NOTED
OTHERWISE.
E "CEILING" DENOTES CEILING MATERIALS INCLUDING
SUSPENSION SYSTEMS ADHESIVE RESIDUES,
MOLDINGS, UP TO BUT EXCLUSIVE OF
STRUCTURAL MATERIALS,
F AFTER THE DEMOUTION OF MATERIALS, THE
RESULTING EXPOSED SURFACE SHALL BE SMOOTH
AND FLUSH WITH EXISTING CONDITIONS.
G "ITEMS TO BE REMOVED BY CONTRACTOR" SHALL
INCLUDE WORK BY OTHER TRADES, INCLUDING
SITE, STRUCTURAL, PLUMBING, MECHANICAL AND
ELECTRICAL
H MECHANICAL AND ELECTRICAL ITEMS THAT ARE
CAPPED AND ABANDONED SHALL BE LOCATED
BEHIND FINAL FINISH SYSTEMS.
J COORDINATE THIS WORK WITH DEMOLITION WORK
ON SITE, STRUCTURAL, PLUMBING, MECHANICAL,
AND ELECTRICAL
K MATERIALS OF DEMOLITION SHALL BE DISPOSED
OF OFF —SITE UNLESS OTHERWISE DIRECTED BY
OWNER.
L OWNER TO REMOVE EXISTING
M
N
Ef
DEMOLITION NOTES O
All DEMOLITION AND NEW WORK TO BE IN
ACCORDANCE WITH GENERAL DEMOLITION NOTES.
*"* ALL COLUMNS, STRUCTURE ETC. TO REMAIN UNLESS NOTED
OTHERWISE ON STRUCTURAL DRAWINGS.
1. REMOVE EXISTING WALL AS REQUIRED FOR NEW
DOOR/WINDOW AND REPLACE AREA AS REQUIRED TO
MATCH EXISTING, AND ALGN FACE OF NEW MATERIAL WITH
EXISTING
2. REMOVE EXISTING WALL COMPLETE
3. REMOVE EXISTING DOOR, FRAME AND HARDWARE.
4. REMOVE EXISTING HARD CEILING COMPLETE
5. REMOVE EXISTING LAY —IN CEILING COMPLETE
6. REMOVE EXISTING FLOORING AND BASE COMPLETE
7. REMOVE EXISTING CASEWORK COMPLETE
8. REMOVE EXISTING PLUMBING FIXTURE, REFER TO PLUMBING
DEMOLITION DRAWINGS
9. REMOVE EXISTING DISPLAY BOARDS
10. REMOVE EXISTING WOOD SHELF
11. REMOVE EXISTING CUBICLES COMPLETE
12. REMOVE EXISTING COUNTER COMPLETE
13. REMOVE EXISTING ROD AND SHELF COMPLETE
14. REMOVE EXISTING SEATING BOOTHS COMPLETE
15. REMOVE EXISTING RECEPTION DESK COMPLETE
16. REMOVE EXISTING CUBICLES COMPLETE, REFER TO
EQUIPMENT PLAN FOR NEW LAYOUT
17. REMOVE EXISTING WOOD TRIM WRAP FROM RECESS AREA
18. REMOVE EXISTING VINYL WALL COVERING
19. REMOVE EXISTING COUNTER AND SUPPORTS
20. REMOVE EXISTING CERAMIC TILE COMPLETE THIS AREA AND
PREP FLOOR TO RECEIVE NEW FLOOR FINISH
21. REMOVE EXISTING WALL NICHE DISPLAY COMPLETE
22. REMOVE EXISTING VINYL WALL COVERING COMPLETE
23. REMOVE EXISTING FILM FROM EXISTING GLASS COMPLETE
24. REMOVE EXISTING WINDOW BLINDS COMPLETE
25. REMOVE EXISTING WALL CABINETS AND RELOCATE TO
SECOND FLOOR MAIL ROOM
26. REMOVE EXISTING BASE CABINETS AND RELOCATE TIGHT TO
EXISTING WALL AT RESTROOM ENTRANCE
27. REMOVE EXISTING LOCKERS AND RELOCATE TO FIRST
FLOOR NEW WOMENS LOCKER ROOM
28. REMOVE EXISTING ARTWORK AND RELOCATE AS SHOWN ON
NEW PLAINS
PROPRIE
ENEENEENE
ARY AND CONFIDENTIAL
VZZI
Q O W p
O
Z
N
U
LI
Z U 0 0
U
2 Yj
s
w
a3�w
pm
VIP
Zy
U
U
Q
ry
o
w
D
p
V V m O
i 0
N V 3
REVISIONS
NO.
Description & Date
NO.
Description & Date
NO.
Description & Date
JOB NO.:
IDB-119-2607
DATE:
1-18-19
DRAWN BY:
RS
CHECKED BY: RS/SV I
.4
vtI as
O•
No.AR10>Wp61 •
w'• 8TATE6 �
�A'OIPNp
=e�' yR'CFlITE
SIGNATURE
*as* e..wra m w ender ese law
7 m peno.neee we..r.e ea
va ae *ep oomen in waste W on,
:me t
pwt m.
U
Z
L/
LU
UQ
Z
N
L.L�
Z
C
O
N
N �
oU0
0
ZQ
Q
Z
✓�
I..L
0
L✓L
I.L
LU
CL
SHEET
ADww 102
SECOND FLOOR
DEMOLITION PLAN
DATE: U4/ 11/ 19