Loading...
HomeMy WebLinkAboutL400 PLANTING PLAN13 W -i iLL w w w (11) Cal-x- (5) Tax-x .� P W W LLLL � .W WLLT Grasses at building edge to ASPHALT PART (65) (41)1 �0 TYp \ Typ. Match front of (2) Hem-s_�.. F (66) (42) E w X w 55 w `.%K w �. w `9, w (2) Hem-s_�v PLANT SCHEDULE SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS Cal-x 22 Calamagrostis x acutiflora'Karl Foerster' Karl Foerster Feather Reed Grass #1 pot space @ 3'-0" O.C. Tax-x 11 Taxus x media'Densiformis' Dense Yew container 24" space @ 3'-0" o.c., allow to mass GROUND COVERS QTY BOTANICAL NAME COMMON NAME CONT FIELD2 REMARKS Ach-m 7 Achilles millefolium'Oertel's Rose' Oertel's Rose Yarrow #1 pot space @ 18" o.c., triangular spacing Ech-x 83 Echinacea x'Pixie Meadowbril Pixie Meadowbrile Purple Coneflower #1 pot space @ 15" o.c., triangular spacing Hem-s 4 Hemerocallis x'Strawberry Candy' Strawberry Candy Daylily #1 pot space @ 12" o.c., triangular spacing Lir-d 131 Liriope spicata'Silver Dragon' Silver Dragon Creeping Lily Turf #1 pot space @ 12" o.c., triangular spacing Nep-x 4 Nepeta x faassend' Walker's Low' Walker's Low Catmint #1 pot space @ 24" ci triangular spacing Sal-n 6 Salvia nemorosa Way Nigh' May Night Sage #1 pot space @ 15" o.c., triangular spacing RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Carmel ((�� �vml�iltr*wkaalD+L N DATE: 04/12/19 (6) Sal-r (2) 711111 [70 Grasses at building edge to U NOTE: Remove burlap from top 113 of ° root ball or carefully remove container. T * i 3" hardwood mulch w ° r'r 3" high topsoil saucer for individual plants. 0 w " _ /7/-- Finish grade. SHRUB PLANTING Not to Scale Slope & scarify sides of pit. Width of pit to be two times ball diameter. Excavated soil or topsoil backfill. Set root ball on undisturbed soil cone at bottom of pit. DESIGN/BUILD LANDSCAPE AND PLANTING NOTES 1. Plant material to be installed and maintained by a qualified and experienced landscape installer. 2. All materials are subject to the approval of the Landscape Architect and Owner at ---— anytime. Landscape Architect to inspect all plant locations and plant bed conditions priorto installation. Stake all plant locations for review and approval by the Landscape Architect before planting. Onj adjustments may be required. Plants are to be freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the health, or alter the characteristics of plant materials. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown or defoliates within five (5) ----- days after planting. Replace immediately with approved, specified material. 4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, _ and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. 1) Cal-x 5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch Tax-x (unless otherwise noted). Apply pre -emergent herbicide as directed by the I Ach-m manufacturer priorto installing mulch. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or other Nep-x treatment, 6. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required for lawn areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean of mots, plants, and, stones, clay lumps, and other extraneous or foreign '- materials Iargerthan V. Supplement with imported topsoil from off -site sources - - when quantities are insufficient. Do not obtain supplemental topsoil from agricultural land, bogs, ormarshes. Inorganic amendments, organic amendments, and fertilizers shall be used to amend topsoil as needed for long-term plant health. 7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the Owner and Operating Authority at no additional cost. 8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the Contractor fora _ _ _ _ _ _ period of one (1) calendar year after Final Acceptance. _ -- 9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintenance shall include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and insects, and replacing tree wrappings. Recommended long-term maintenance procedures shall be provided to the Owner before expiration of this period. 10. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of glass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. (0.92 sq. m) and bare spots not exceeding 3 by 3 inches. Reestablish lawns that do not comply with requirements (A0 2' 4' 8t and continue maintenance until lawns are fully satisfactory to the Owner. North Scale I" = 4'-0" PERENNIAL PLANTING Not to Scale Note: All perennial beds shall be planted using triangular planting scheme. Refer to Planting Schedule for On -Center planting dimension. 3" Hardwood Mulch Existing Grade Remove Container 12" Prepared Soil; Refer to Specifications Compacted Subgrade c�fim n oQ�E J. i. A ��45 �y(Sf•�,��. No. = 20200052 _ STAT OF V L v L W 00 � A T ? calQ tV y O CL d ci v E `�` ^ d n v a+ r a o c c� d a - a 0°a 0 �U ^� CL 11111111 Date: 2.03.2018 obN 20 Dwnby: BK1P Checked by: FJP ,taR oa.��m.a sa=a.m�,.a ei wc•. wrtl+au<u�aa�Mnpn �ami au,aammui.eAkn�aH iaamv=�o��e� Sheet No: L400