HomeMy WebLinkAboutL400 PLANTING PLAN13
W
-i
iLL
w
w w
(11) Cal-x-
(5) Tax-x
.�
P
W W
LLLL
�
.W WLLT
Grasses at building edge to
ASPHALT PART
(65)
(41)1
�0
TYp \
Typ.
Match front of
(2) Hem-s_�..
F
(66)
(42) E
w X w 55 w `.%K w �. w `9, w
(2) Hem-s_�v
PLANT SCHEDULE
SHRUBS
QTY
BOTANICAL NAME
COMMON NAME
SIZE
HEIGHT
REMARKS
Cal-x
22
Calamagrostis x acutiflora'Karl Foerster'
Karl Foerster Feather Reed Grass
#1 pot
space @ 3'-0" O.C.
Tax-x
11
Taxus x media'Densiformis'
Dense Yew
container
24"
space @ 3'-0" o.c., allow to mass
GROUND COVERS
QTY
BOTANICAL NAME
COMMON NAME
CONT
FIELD2
REMARKS
Ach-m
7
Achilles millefolium'Oertel's Rose'
Oertel's Rose Yarrow
#1 pot
space @ 18" o.c., triangular spacing
Ech-x
83
Echinacea x'Pixie Meadowbril
Pixie Meadowbrile Purple Coneflower
#1 pot
space @ 15" o.c., triangular spacing
Hem-s
4
Hemerocallis x'Strawberry Candy'
Strawberry Candy Daylily
#1 pot
space @ 12" o.c., triangular spacing
Lir-d
131
Liriope spicata'Silver Dragon'
Silver Dragon Creeping Lily Turf
#1 pot
space @ 12" o.c., triangular spacing
Nep-x
4
Nepeta x faassend' Walker's Low'
Walker's Low Catmint
#1 pot
space @ 24" ci triangular spacing
Sal-n
6
Salvia nemorosa Way Nigh'
May Night Sage
#1 pot
space @ 15" o.c., triangular spacing
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Carmel ((��
�vml�iltr*wkaalD+L
N
DATE: 04/12/19
(6) Sal-r
(2)
711111 [70
Grasses at building edge to
U NOTE: Remove burlap from top 113 of
° root ball or carefully remove container.
T * i 3" hardwood mulch
w °
r'r 3" high topsoil saucer for
individual plants.
0
w " _ /7/-- Finish grade.
SHRUB PLANTING
Not to Scale
Slope & scarify sides of pit.
Width of pit to be two
times ball diameter.
Excavated soil or topsoil backfill.
Set root ball on undisturbed
soil cone at bottom of pit.
DESIGN/BUILD LANDSCAPE AND
PLANTING NOTES
1.
Plant material to be installed and maintained by a qualified and experienced
landscape installer.
2.
All materials are subject to the approval of the Landscape Architect and Owner at
---—
anytime. Landscape Architect to inspect all plant locations and plant bed conditions
priorto installation. Stake all plant locations for review and approval by the
Landscape Architect before planting. Onj adjustments may be required. Plants
are to be freshly dug. Transporting of plants shall be done in a manner as to not
destroy the natural shape, compromise the health, or alter the characteristics of
plant materials.
3.
Rootballs shall meet or exceed size standards as set forth in 'American Standards
for Nursery Stock. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
Remove from the site any plant material that turns brown or defoliates within five (5)
-----
days after planting. Replace immediately with approved, specified material.
4.
Plant counts indicated on drawings are for Landscape Architect's use only.
Contractor shall make own plant quantity takeoffs using drawings, specifications,
_
and plant schedule requirements (i.e., spacing), unless otherwise directed by
Landscape Architect. Contractor to verify bed measurements and install appropriate
quantities as governed by plant spacing per schedule.
1) Cal-x 5.
All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch
Tax-x
(unless otherwise noted). Apply pre -emergent herbicide as directed by the
I Ach-m
manufacturer priorto installing mulch. Seed all areas disturbed by construction
activities that are not otherwise noted to receive pavement, planting bed, or other
Nep-x
treatment,
6.
The Contractor shall install and/or amend topsoil in all proposed bed areas to meet
ASTM D5268 standards. Landscaper shall verify depth and quality of topsoil prior to
plant installation. A minimum of 4" of topsoil is required for lawn areas; 12" for plant
beds. Topsoil sources shall include the reuse of surface soil stockpiled on site,
clean of mots, plants, and, stones, clay lumps, and other extraneous or foreign
'-
materials Iargerthan V. Supplement with imported topsoil from off -site sources
- -
when quantities are insufficient. Do not obtain supplemental topsoil from agricultural
land, bogs, ormarshes. Inorganic amendments, organic amendments, and fertilizers
shall be used to amend topsoil as needed for long-term plant health.
7.
Verify all utility locations in the field prior to beginning work. Repair all damaged
utilities to satisfaction of the Owner and Operating Authority at no additional cost.
8.
Install all plant material in accordance with all local codes and ordinances.
Coordinate with the Owner to obtain any required permits necessary to complete
work. All workmanship and materials shall be guaranteed by the Contractor fora
_ _ _ _ _ _
period of one (1) calendar year after Final Acceptance.
_ -- 9.
Maintain all plant material for a three (3) month period from date of Substantial
Completion. Maintenance shall include pruning, cultivating, watering, weeding,
fertilizing, restoring plant saucers, spraying for disease and insects, and replacing
tree wrappings. Recommended long-term maintenance procedures shall be provided
to the Owner before expiration of this period.
10.
Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close
stand of glass has been established, free of weeds and surface irregularities, with
coverage exceeding 90 percent over any 10 sq. ft. (0.92 sq. m) and bare spots not
exceeding 3 by 3 inches. Reestablish lawns that do not comply with requirements
(A0 2' 4' 8t and continue maintenance until lawns are fully satisfactory to the Owner.
North Scale I" = 4'-0"
PERENNIAL PLANTING
Not to Scale
Note: All perennial beds shall be planted
using triangular planting scheme. Refer to
Planting Schedule for On -Center planting
dimension.
3" Hardwood Mulch
Existing Grade
Remove Container
12" Prepared Soil; Refer to Specifications
Compacted Subgrade
c�fim n
oQ�E J. i. A
��45 �y(Sf•�,��.
No.
= 20200052
_ STAT OF
V
L
v
L
W
00
�
A
T
?
calQ
tV
y
O
CL d
ci
v
E
`�`
^
d
n
v
a+ r
a
o
c
c�
d
a
-
a
0°a
0
�U
^�
CL
11111111
Date: 2.03.2018
obN
20
Dwnby:
BK1P
Checked by:
FJP
,taR oa.��m.a sa=a.m�,.a ei wc•.
wrtl+au<u�aa�Mnpn �ami
au,aammui.eAkn�aH
iaamv=�o��e�
Sheet No:
L400