GENERAL NOTES
1. SHEET METAL SUBCONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING
AND RE —INSTALLING CEILING IN GENERAL VICINITY OF VAV OR FPVAV
TERMINALS. ANY CEILING WORK BEYOND THE IMMEDIATE VICINITY OF THE
VAV/FPVAV TERMINAL SHALL BE COMPLETED BY THE CONTRACTOR
REQUIRING CEILING REMOVAL IN THOSE AREAS.
2. ALL MATERIAL/EQUIPMENT REMOVED BY SUBCONTRACTORS SHALL BE
DISPOSED OF OFF SITE. OWNER HAS FIRST RIGHT OF REFUSAL FOR ANY
EQUIPMENT/MATERIAL/PARTS REMOVED FROM PROJECT.
3. EXISTING DUCTWORK AND PIPING SIZES INDICATED ARE AS SHOWN ON
ORIGINAL BUILDING PLANS. SUBCONTRACTORS ARE RESPONSIBLE FOR FIELD
VERIFYING EXACT SIZES AND LOCATIONS AS REQUIRED TO COMPLETE THEIR
WORK.
DEMOLITION PLAN NOTES
1. SHEET METAL SUBC. SHALL REMOVE THIS SECTION OF EXISTING
DUCTWORK.
2. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER. TEMPORARILY
SUPPORT FLEX DUCTWORK.
3. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER, TEMPORARILY
SUPPORT FLEX DUCTWORK. DIFFUSER TO BE REUSED AT NEW LOCATION.
4. TEMPERATURE CONTROLS SUBC. SHALL REMOVE EXISTING T—STAT AND REVISIONS
DISCONNECT FROM FAN COIL UNIT. NO, Description &Date
NO. Description & Dace
NO. Description & Dace
JOB NO.: IDB-119-2607
DATE: 1-18-19
DRAWN BY: TPT
CHECKEDBY: KLB
\Oa\PWIIIIIIII gOpii
10100828
STA E OF
M'DIA`NP: '
On Him
SIGNATURE
This arawma ma w amlata w 1L
a PmTo.,o.wa. ew.w.. URNS
aee a r.prmua.a m wha. m In
d.lwo�oi. m.oh.woa
pemlr®.
V
Z
MECH. NEW WORK PLAN NOTES (1)w
1. SHEET METAL SUBC. SHALL INSTALL NEW VAV BOX WITH ELECTRIC U Q
REHEAT IN THIS LOCATION. PSI TO FURNISH VAV. REFER TO M-401 FOR Z
DETAILS. % Q
2. SHEET METAL SUBC. SHALL INSTALL MOTORIZED DAMPER IN SUPPLY z
DUCTWORK. DAMPER TO BE FURNISHED AND ELECTRICALLY INSTALLED BY LJJ Z
TCC. o un vi
3. SHEET METAL SUBC. SHALL PROVIDE NEW SUPPLY DUCTWORK ABOVE
EXISTING CEILING. COORDINATE WITH GC. FOR TEMPORARY CEILING o w 0 CL
REMOVAL WHERE REQUIRED. c U Q
4. SHEET MEATL SUBC. SHALL PROVIDE NEW CEILING DIFFUSER. z Z
5. BALANCING SUBC. SHALL RE —BALANCE EXISTING DIFFUSER TO SPECIFIED Q
VALUE. Q 0
6. TEMPERATURE CONTROLS SUBC. SHALL RELOCATE EXISTING 37 Z
TEMPERATURE STAT.
FM 7. INSULATION SUBC. SHALL INSULATE FAN COIL DUCTWORK COMPLETE. 0
8. INSULATION SUBC. SHALL INSULATE ALL SUPPLY DUCTWORK
DOWNSTREAM OF THIS POINT. ILL.
9. SHEET METAL SUBC. SHALL RELOCATE EXISTING DIFFUSER / GRILLE TO al
THIS LOCATION. LU
10. TEMPERATURE CONTROLS SUBC. SHALL CONTROL ADDITIONAL FAN COIL
;FM UNIT OFF OF EXISTING THERMOSTAT.
11. TEMPERATURE CONTROLS SUBC. SHALL PROVIDE NEW THERMOSTAT FOR
THIS ROOM.