Loading...
HomeMy WebLinkAboutM-201 MECHANICAL PLANPSI OFFICE FIRST FLOOR MECH. DEMOLITION PLAN o a' a' 167 i J * NORTH SCALE: 1/8" = 1'—O" PSI OFFICE FIRST FLOOR MECH. NEW WORK PLAT �D NORTH SCALE: 1/8° = 1'-0° REFER TO f FOR CONTIN RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel ',"1 GENERAL NOTES 1. SHEET METAL SUBCONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND RE —INSTALLING CEILING IN GENERAL VICINITY OF VAV OR FPVAV TERMINALS. ANY CEILING WORK BEYOND THE IMMEDIATE VICINITY OF THE VAV/FPVAV TERMINAL SHALL BE COMPLETED BY THE CONTRACTOR REQUIRING CEILING REMOVAL IN THOSE AREAS. 2. ALL MATERIAL/EQUIPMENT REMOVED BY SUBCONTRACTORS SHALL BE DISPOSED OF OFF SITE. OWNER HAS FIRST RIGHT OF REFUSAL FOR ANY EQUIPMENT/MATERIAL/PARTS REMOVED FROM PROJECT. 3. EXISTING DUCTWORK AND PIPING SIZES INDICATED ARE AS SHOWN ON ORIGINAL BUILDING PLANS. SUBCONTRACTORS ARE RESPONSIBLE FOR FIELD VERIFYING EXACT SIZES AND LOCATIONS AS REQUIRED TO COMPLETE THEIR WORK. DEMOLITION PLAN NOTES 1. SHEET METAL SUBC. SHALL REMOVE THIS SECTION OF EXISTING DUCTWORK. 2. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER. TEMPORARILY SUPPORT FLEX DUCTWORK. 3. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER, TEMPORARILY SUPPORT FLEX DUCTWORK. DIFFUSER TO BE REUSED AT NEW LOCATION. 4. TEMPERATURE CONTROLS SUBC. SHALL REMOVE EXISTING T—STAT AND REVISIONS DISCONNECT FROM FAN COIL UNIT. NO, Description &Date NO. Description & Dace NO. Description & Dace JOB NO.: IDB-119-2607 DATE: 1-18-19 DRAWN BY: TPT CHECKEDBY: KLB \Oa\PWIIIIIIII gOpii 10100828 STA E OF M'DIA`NP: ' On Him SIGNATURE This arawma ma w amlata w 1L a PmTo.,o.wa. ew.w.. URNS aee a r.prmua.a m wha. m In d.lwo�oi. m.oh.woa pemlr®. V Z MECH. NEW WORK PLAN NOTES (1)w 1. SHEET METAL SUBC. SHALL INSTALL NEW VAV BOX WITH ELECTRIC U Q REHEAT IN THIS LOCATION. PSI TO FURNISH VAV. REFER TO M-401 FOR Z DETAILS. % Q 2. SHEET METAL SUBC. SHALL INSTALL MOTORIZED DAMPER IN SUPPLY z DUCTWORK. DAMPER TO BE FURNISHED AND ELECTRICALLY INSTALLED BY LJJ Z TCC. o un vi 3. SHEET METAL SUBC. SHALL PROVIDE NEW SUPPLY DUCTWORK ABOVE EXISTING CEILING. COORDINATE WITH GC. FOR TEMPORARY CEILING o w 0 CL REMOVAL WHERE REQUIRED. c U Q 4. SHEET MEATL SUBC. SHALL PROVIDE NEW CEILING DIFFUSER. z Z 5. BALANCING SUBC. SHALL RE —BALANCE EXISTING DIFFUSER TO SPECIFIED Q VALUE. Q 0 6. TEMPERATURE CONTROLS SUBC. SHALL RELOCATE EXISTING 37 Z TEMPERATURE STAT. FM 7. INSULATION SUBC. SHALL INSULATE FAN COIL DUCTWORK COMPLETE. 0 8. INSULATION SUBC. SHALL INSULATE ALL SUPPLY DUCTWORK DOWNSTREAM OF THIS POINT. ILL. 9. SHEET METAL SUBC. SHALL RELOCATE EXISTING DIFFUSER / GRILLE TO al THIS LOCATION. LU 10. TEMPERATURE CONTROLS SUBC. SHALL CONTROL ADDITIONAL FAN COIL ;FM UNIT OFF OF EXISTING THERMOSTAT. 11. TEMPERATURE CONTROLS SUBC. SHALL PROVIDE NEW THERMOSTAT FOR THIS ROOM. PROPRIETARY AND CONFIDENTIAL SHEET Mmw201 MECHANICAL PLAN DATE: U4/ 12/ 19