Loading...
HomeMy WebLinkAboutM-202 MECHANICAL PLANPSI OFFICE SECOND FLOOR MECHANICAL DEMOLITION PLAN 0 4' 8' 16' NORTH SCALE: 1/8 11 = 110" PSI OFFICE SECOND FLOOR MECHANICAL NEW WORK PLAN o a' a' t s' NORTH SCALE: 1/8' = 1 -0' RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel ,,"1 A CFM O"0 EXHAUST C 150 --�-t I I I I I I I I I I ELEV_LOBBY Azo L—A20 OF _—A206 — IF FI IF % IF FI iF it IF it F it I'L J CNUJ EJrLJ E 3 k7-�- �— U I C R SE A207 � m ' ©aid■'■-'- --- -�.;. ■'■L_ --- --- ` ■'7MFEREMCEor RH _—T--T-- It:J U:J EJ U:JE 10"o (TYP. �5 217 344 CFM aj T (TYP. OF 3) CFM= (TYP. OF 2) CFM C M■ 105 SERVER ROOM 11 5 0 GENERAL NOTES 1. SHEET METAL SUBCONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND RE -INSTALLING CEILING IN GENERAL VICINITY OF VAV OR FPVAV TERMINALS. ANY CEILING WORK BEYOND THE IMMEDIATE VICINITY OF THE VAV/FPVAV TERMINAL SHALL BE COMPLETED BY THE CONTRACTOR REQUIRING CEILING REMOVAL IN THOSE AREAS. 2. ALL MATERIAL/EQUIPMENT REMOVED BY SUBCONTRACTORS SHALL BE DISPOSED OF OFF SITE. OWNER HAS FIRST RIGHT OF REFUSAL FOR ANY EQUIPMENT/MATERIAL/PARTS REMOVED FROM PROJECT. 3. EXISTING DUCTWORK INDICATED ARE AS SHOWN ON ORIGINAL BUILDING PLANS. SUBCONTRACTORS ARE RESPONSIBLE FOR FIELD VERIFYING EXACT SIZES AND LOCATIONS AS REQUIRED TO COMPLETE THEIR WORK. DEMOLITION PLAN NOTES 1. SHEET METAL SUBC. SHALL REMOVE THIS SECTION OF EXISTING DUCTWORK. 2. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER. TEMPORARILY SUPPORT FLEX DUCTWORK. 3. SHEET METAL SUBC. SHALL REMOVE EXISTING DIFFUSER. TEMPORARILY SUPPORT FLEX DUCTWORK. DIFFUSER TO BE REUSED AT NEW LOCATION. 4. TEMPERATURE CONTROLS SUBC. SHALL REMOVE EXISTING T-STAT AND DISCONNECT FROM FAN COIL UNIT. 5. SHEET METAL SUBC. SHALL REMOVE EXISTING ROOF MOUNTED EXHAUST FAN AND CONNECTED DUCTWORK. MECH. NEW WORK PLAN NOTES MECHANICAL SUBC. SHALL INSTALL NEW VAV BOX WITH ELECTRIC REHEAT IN THIS LOCATION. PSI TO FURNISH VAV. REFER TO M-401 FOR DETAILS. 2. MECHANICAL SUBC. SHALL INSTALL MOTORIZED DAMPER IN SUPPLY DUCTWORK. DAMPER TO BE FURNISHED AND ELECTRICALLY INSTALLED BY TCC. 3. MECHANICAL SUBC. SHALL PROVIDE NEW SUPPLY DUCTWORK ABOVE EXISTING CEILING. COORDINATE WITH GC. FOR TEMPORARY CEILING REMOVAL WHERE REQUIRED. 4. MECHANICAL SUBC. SHALL PROVIDE NEW CEILING DIFFUSER. 5. BALANCING SUBC. SHALL RE —BALANCE EXISTING DIFFUSER TO SPECIFIED VALUE. 6. TEMPERATURE CONTROLS SUBC. SHALL RELOCATE EXISTING TEMPERATURE STAT. 7. INSULATION SUBC. SHALL INSULATE FAN COIL DUCTWORK COMPLETE. 8. INSULATION SUBC. SHALL INSULATE ALL SUPPLY DUCTWORK DOWNSTREAM OF THIS POINT. _ 9. MECHNICAL SUBC. SHALL RELOCATE EXISTING DIFFUSER TO THIS - LOCATION. ......,. 10. TEMPERATURE CONTROLS SUBC. SHALL PROVIDE NEW THERMOSTAT FOR THIS ROOM. D 11. TEMPERATURE CONTROLS SUBC. SHALL CONTROL ADDITIONAL VAV UNIT OFF OF EXISTING THERMOSTAT. ❑ 12. MECHANICAL SUBC. SHALL TRANSITION FROM 8"0 DUCTWORK BELOW TO 10"0 DUCTWORK UP TO ERU ON ROOF. 13. TEMPERATURE CONTROLS SUBC. SHALL PROVIDE NEW CO2 SENSOR FOR THIS ROOM. 14. SHEET METAL SUBC. SHALL ROUTE EXHAUST DUCTWORK THROUGH JOIST WEBBING TO TRANSITION OVER EXISTING DUCTWORK. ) CFM OF 2) ) CFM OF 2) REVISIONS NO. Description & Date NO. Description & Date NO. Description & Date JOB NO.: ID&IM2607 DATE: I-I8-I9 DRAWN BY: TFT CHECKED BY: KLB 10100828 STATE OF SIGNATURE Ilium Mwly W Via CYY1iY M iM of Pffi0Y0m 0•M� �w not M mmpmaCsm! Y wWm f an pROWUMMK mlmwluhwt wP� wllla4 W. U Z vi LU UZ ja o �Z LU — O N vS wO UQ N ZQ Q� � Z 0 LL LU IZ SHEET M-202 DATE: U4/ 12/ 19 PROPRIETARY AND CONFIDENTIAL MECHANICAL PLAN