Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P-202 SECOND FLOOR PLUMBING PLAN
RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel ',"UI GENERAL NOTES 1. ALL MATERIAL/EQUIPMENT REMOVED BY SUBCONTRACTORS SHALL BE DISPOSED OF OFF SITE. OWNER HAS FIRST RIGHT OF REFUSAL FOR ANY EQUIPMENT/MATERIAL/PARTS REMOVED FROM PROJECT. PLUMBING PLAN NOTES Q NEW DOMESTIC HOT WATER EXPANSION TANK" AMTROL NO. ST-5, 2 GALLON TANK VOLUME AND 0.9 MAX ACCEPTED VOLUME (GALLONS), FLOOR MOUNT TANK. 02 DOMESTIC HOT WATER RETURN PUMP BY OTHERS INSTALLED BY THE PLUMBING CONTRACTOR. COORDINATE WITH OWNER TO OBTAIN PUMP. COORDINATE WITH E.C. PRIOR TO START OF WORK. Q AQUA STAT: TACO MO. NO. 563-2: SET ON 0100 F. / OFF 0 115 F. CONNECT TO HOT WATER RETURN PUMP. ® BALL VALVE (TYP.) Q CHECK VALVE (TYP.) © STRAINER (TYP) OO UNION (TYP.) ® TO NEW FIRST FLOOR FIXTURES AND THE INTERCONNECTION TO THE EXISTING BUILDING DOMESTIC HOT WATER SYSTEM SECOND FLOOR PLUMBING PLAN SCALE: 1/8"=V-0" FIRE PROTECTION PLAN NOTES®-' Oi EXISTING FIRE PROTECTION SPRINKLER HEADS WITHIN THIS BOUNDARY SHALL BE REPLACED WITH AND HAVE NEW SPRINKLER HEADS AND MAIN/ BRANCH PIPING REWORKED TO ACCOMMODATE THE NEW ARCHITECTURAL FLOOR PLAN ARRANGEMENT. ALL WORK SHALL BE IN ACCORDANCE WITH THE CURRENTLY ENFORCE EDITION OF NFPA 13, ALL APPLICABLE STATE AND LOCAL CODES AND THE AUTHORITY HAVING JURISDICTION. :a,.at,D.,,t,. NO. Description & Dace NO. Description & Dace NO. Description & Date JOB NO.: IDB-119-2607 DATE: 1-18-19 DRAWN BY: My CHECKED BY: RRW 10100828 STATE OF -t" e go iry SIGNATURE om arawma . na mnt u m9 m e.e arr " and vet to npaavrrd an wLWw rr M pet M w m•w, mwu.ve� m .I.clrawc. wllhauL rxpa wr1Um ..rmlmm. U Z vi LL UQ -z �Q 0 Q LU - 0 0 v) N � i L U _ JO O (V 0 U D Q zz Qo 37 z O LL LU SHEET Pmw202 SECOND FLOOR PLUMBING PLAN DATE: 04/12/19 noRre PROPRIETARY AND CONFIDENTIAL