HomeMy WebLinkAbout19112_2019-04-17_Bulletin 1MCG Architecture Giant Eagle Store: #6550 Carmel, IN
7100 E. Pleasant Valley Rd. #320
Cleveland, Ohio 44131 Dale: April 17, 2019
** BULLETIN 1 **
Aetos Construction Company
261 Kappa Drive
Pittsburgh, PA 15238
Aetos Project Manager: Mike McGuire
Phone: 412 906-5386
This Construction Bulletin Includes revisions for the following SPCRs:
• SPCR #6550-XX-XX — Design Coordination
• Drawing List— CS, LS101, Al 01
Specification Revisions: 000015-Standard Drawing List
Instructions to Contractors and Vendors:
A. This is not an order for performed work. This is a request for cost proposals for the
described revisions.
B. Enter amounts for each SPCR and totals on the appropriate lines.
C. Itemize quantity and rates for labor, material, overhead and profit separately.
D. The Contractor must sign for each SPCR.
E. Contractor must attach detailed supporting documentation consistent with
Specification Section 01035 - 1.02 for each SPCR.
F. Work not revised hereby shall remain as originally shown and specified.
SPCR #6550-XX-XX PLAN REVISIONS PER CITY COMMENTS
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 04/24/19
CS
• REVISED DRAWING SCHEDULE AND ISSUANCE DATES
• UPDATED OCCUPANT LOAD NOTE TO REFERENCE SHEET
LS101
• REVISED SPRINKLER SYSTEM NOTES
L3101
ADDED SHEET TO SET
A101
REVISED DOOR SWING 103IN TEAM MEMBER OFFICE AREA
• REVISED DOOR SWING 104 IN TEAM MEMBER OFFICE AREA
Total Additions: $
Total Deductions: $
Total SPCR #X: $
END OF REVISIONS FOR BULLETIN 1
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 04/24/19