Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P101
LIM M RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City M Carl (� a e 3 c i? i4 I` I i I I I I j I i ,i t:J AREA OF PI MEZZANINE KEY PLAN 1 SCALE: 1/32" = 1'-D" • Anil p m i _ iN ae � IWI iu • � I :_� 4 J -- II HO L A INSULATE ALL EA205:D WASTE AND 5UPPLY PIPING UNDER SUK NTH LAV WI 2E-Z 5LRIT5 PIPE COVERS BY TFUEBRO OR EUTAL. B. REFER TO ARCHITECTURAL REANN65 FOR ADA CLEARANCES. KITCHEN SINK TEMPERING VALVE DETAIL SCALE: NONE ___ I II B LT% ---------- o > xVTR 'x 1v o GTX 6 INn' V SANS I 3 II xCO- T III , TYP. ."o... MOt HUDDLPARFAVI _________ _ _ _ _ _ _ _ _ ____Ia'-1D• rr Iaa—.e 9 III I I I I �II I I I oo,. RAN AREA I I II. C� III III 2 ICI �IIL tool CE) I O2 PARTIAL PLUMBING FLOOR PLAN s PARTIAL PLUMBING MEZWINE PLAN �� SCALE: 3/32u . 1'-0" O SCALE 3/32' . p-0• �'a141 3/4' � Y 2• 'JUT -OFF VALVE J -TYPICAL. J ROUTE 1/2' HI AND ,I COLD WATER PIPING IN WALL WATER HAMMER ARRE5TOR, PPP. SC-5OO SERIES, ULI INDICATED OTFE RN15F NOTED - TYPICAL. H&CW PIPING DIAGRAM 56AL6 NOW SANITARY STACK DIAGRAM SCALE NOW CODED NOTES:O OI WASTE DRAIN PIPING FROM MEZZANINE. REFER TO PARTIAL PLIUMBINS MEZZANINE PLAN FOR CONTINUATION. O EXISTIN5 VENT PIPING UP TO MEZZANINE. REFER TO PARTIAL PLUMBING FLOOR PLAN FOR CONTINUATION. 0 EXISTING VENT PIPING FROM FIRST FLOOR ® COHNELT TO EXISTING SANITARY DRAIN PIPING IN J015T SPACE. VERIFY THE EXALT LOCATION, 51ZE, HEI6HPI DRAIN 15 ALTIVE AND DIRECTION OF FLOW PRIOR TO STARTING HORK. 55 EXISTING SANITARY PIPING DOM FROM MEZZANINE SERVING FIXTURES IN MEZZANINE. REFER TO PARTIAL RUMBIN6 MEZZANINE PLAN FOR CONTINUATION. © CONNECT TO EA5TIN5 VENT PIPING. VERIFY THE EXALT LOCATION AND 51ZE IN THE FIELD PRIOR TO STARTING WORK. O7 2' SANITARY GRAIN PIPING DOM TO FIRST FLOOR. SLEEVE AND SEAT_ FLOOR PENETRATION WATER 116HT AM 51LICOIE 5EALE. O ODH ECT TO EXISTIN5 HOT, RTxIROU.ATIN6 HOT AND COD WATER PIPING. VERIFY THE EXALT LOGATION5 AND SIZES IN THE FIELD PRIOR TO 5TARTING WORT I PROVIDE A56E 1010 APPROVED TB45RIN6 VALVE BELOW SIN, 10 2' SANITARY PIPING IN CEILING SPACE OF FIRST FLOOR. PATCH EASTINS CEILING TO MATCH. COORDINATE TIME TO WORK IN FIRST FLOOR WITH 6L. PRIOR TO 5TARTIN6 HWK. II DROP DOMESTIC WATER PIPING AND RGUTE PIP116 IN WALL TO SIN: IN. VERIFY THE EXACT LOCATION IN THE FIELD PRIOR TO STARTING WORK. PLUMBING GENERAL NOTES: A. COORDINATE WORK WITH THE YDRK OF ALL OTHER TRADES, B. PLA•BIN6 CONTRACTOR SHALL FIELD VEEI THE EXALT LOCATIONS AND SIZES OF EXISTING DRAIN PIPING, INCLUDING, TEE DEPTHS OF SANITARY DRAIN PIPIN5 PRIOR TO START OF HORK. C. CONTRACTOR SHALL V151T 51TE PRIOR TO EVEMITTING BID AND FIELD VERFY EXISTING CONDITIONS TO ENSULE THAT THE WORK REPRESENTED ON THE MAN I AND IN THESE SPECIFICATIONS CAN BE INSTALLED AS INDICATED. CONTRACTOR SHALL TAKE ALL INTERFERENCES INTO CONSIDERATION. PROVIDE ALL NECESSARY OFFSEI5 TO SUIT FIELD CONDITIONS AS REQUIRED. D. CONTRACTOR 5HAEL BE FAMILIAR WITH 61ANT EAGLE'S STANDARDS, RILES AND RCGU.ATIONS. ALL 01 CRTERIA SHALL BE COMPLIED NTH AND INCLUDED IN THIS BID. E. CONTRACTOR SHALL VERIFY AND COORDINATE ALL UTILITY CONNECTION POINTS, INCLUDING SIZES AND INVERTS PRIOR TO THE START OF WORK F. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICEEES, DOCUMENTS AND SERVICES RELATED TO THE INSTALLATION OF TIE WORK. 6. ALL WORK SHALL COMPLY NTH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODE': LAYS, ACTS AND ALL AUTHORTIE5 NAAN6 JARISDIcnoH. H. COORDINATE ALL PIPE ROUTING NTH ALL OTHER TRADES, INCLUDING MECHANICAL DUCTHORK, REFRIGERATION PIPIN5, ELECTRICAL, AND FIRE PROTECTION COORDINATE ALL BELOW GRADE PIPING NTH ALL COLUMN FOOTINSS, REFR6ERATION PITS AND TRENCHES. I. PLUMBING CONTRACTOR :MAID_ FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO START OF YDRK. PLUMBING CONTRACTOR SHALL PERFORM INVE5TI6ATIVE NOW INCLDINS 5COPIN6 NTH CAMERA TO CONFIRM EXACT ROUTINE, DEPTH, SIZE, CONDITION AND FLOW DIRECTION OF EXISTING BELOW GRADE SANITARY Al PIPING. PLUMBING LEGEND EXISTING UTILITY AS INDICATED _�. SANITARY PIPING ABOVE GROUND — —V— — — VENT PIPING ---GW--- COLD WATER PIPING ----HIH---- HOT WATER PIPING SHUT—OFF VALVE VTR VENT THROUGH ROOF FLO. CLEANOUT 'X' EXISTING TO REMAIN CTX CONNECT TO EXISTING O INDICATES CODED NOTE O EQUIPMENT TAG SI E: A. F LMBIN6 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO START OF WORM PLUMBINS CONTRACTOR `JAL_ PERFORM INVESTISATNE KDRI INCLLDINS 5COPINS WITH CAMERA TO CONFIRM EXACT ROVTNG, DEPTH, SIZE, CONDITION AND FLOW DIRECTION OF EXISTING BELOW GRADE NA5TE PIPING. B. ALL FIXNRE5 AND EQUIPMENT THAT ARE NOT TAISSI ARE EXISTING TO REMAIN, FIELD VERIFY. C. MODIFY THE EA5TING FIR' PROTECTION SYSTEM AS REGIUIRED FOR NEW CEIUN65 AND WAIL PARTITIONS. PLUMBING FIXTURE SCHEDULE LOCATION LABEL QUANTITY DESCRIPTION 1 T WASTE CW HW TW RO' 6A5 REMARKS MTS. HT. V05M TO RIM KITGNEN 51W PE-305-,B 1 KITCHEN 51W 2' U2' V2' EKAY GELFORTY SERIES CRIT21 51N6LE BOYL 5TAINLE555 STD C MHTERTOP SII 54• IT' X 12-1/4e X 5-T/B' DEEP DON. WITH GRLME CUP AND ELKAY 6005EWLK FAUCET NTH WRIST BLADE HANDLES. PROVIDED AND INSTALLED BY PL. / ttA •B'•. DATE '—" " "' REVISIONS BY O �pp��� .:...:4.Y�'., . I�o.,lt N0. N0. IEns Alo.t 'C' O%BTEA • �4 DWG. TITLE LAY N = No. PEIUBae]w0:in PLUMBING PARTIAL PLANS 03-2T-19f'UMinC' ISSUED FOR CONSTRUCTION ISSUED FOR BID ISSUED FOR REDLINE REVIEW ISSUED FOR PERMIT ISSUED FOR 50 % CONTRACTOR MUST VERIFY KICK OFF MEETING ALL CLEARANCES AND DIMENSIONS IN ITEM FINAL APPROVED PLAN PROJECT GIANT EAGLE MARKET DISTRICT #6550 LOCATION OWNER THE BRIDGES DEVELOPMENT 11505ILLINOIS STREET CARMEL, IN 46032 GIANT EAGLE, INC. - 03-27-19 _ M0RMry6NOttlgN llgppMlOU Mc &A Dooamona Enamor. oat Mawo TR001EnAeryR®h.,n,teT� WarrMNIIe HEgM1p.OH 4912E Phone I216.292.M%- Fax l vh3925874 Emailm ilIS-whenryasor0tnmm WR 03-27-19 MW PROJECIm. REAMER 9112 P 03-27-19 �E AS NOTED P101 DRAM BY MGS _ UA1 E: U'i/L'i/ IJ