HomeMy WebLinkAboutM103 - Mechanical DemoN.I.C.DNUPDNUPDNUPA.1A.2B.2C.2D.2D.3F.2G.2G.3H.2J.2K.2K.3L.2M.2N.2B.1C.1D.1E.1F.1G.1G.7H.1J.1K.1K.5L.1M.1N.1123456789101112131415161718192021222324TTTTTHP(E)3-32HP(E)3-20THP(E)3-3TTTTHP(E)3-21HP(E)3-4HP(E)3-5HP(E)3-6HP(E)3-23HP(E)3-71111122222222222233HP(E)3-283411111111T32" EX.CWS &CWR1-1/4"EX. CD#MECHANICAL DEMOLITION KEY NOTES:1.REMOVE EXISTING DIFFUSER AND RELOCATE ACCORDING TO NEW WORK PLAN.2.REMOVE EXISTING DIFFUSER, DUCTWORK, AND ASSOCIATED APPURTENANCES BACKTO POINT SHOWN. PATCH AND REPAIR EXISTING DUCT AS REQUIRED.3.REMOVE EXISTING THERMOSTAT AND CONTROL WIRING. PATCH AND REPAIR WALL.SEE NEW WORK PLAN FOR NEW LOCATION.4.MECHANICAL SYSTEM IN THIS AREA TO REMAIN AS-IS.1. DEMOLITION DRAWINGS ARE BASED ON EXISTING PLANS AND FIELDINVESTIGATION PRIOR TO DEMOLITION. VISIT THE SITE PRIOR TO BID IN ORDER TOBECOME FAMILIAR WITH THE EXISTING CONDITIONS AND IN ORDER TO AVOIDCONFLICTS.2. ALL ITEMS SHOWN DASHED ON DEMOLITION PLANS ARE EXISTING TO BE REMOVEDINCLUDING PIPING, DUCTWORK, HANGERS, FASTENERS, CONTROLS, ANDASSOCIATED APPURTENANCES UNLESS OTHERWISE NOTED.3. ALL ITEMS SHOWN SOLID ON DEMOLITION PLANS ARE EXISTING TO REMAINUNLESS OTHERWISE NOTED.4. EXERCISE CARE IN REMOVAL OF DEMOLITION ITEMS. REPAIR, AT NO ADDITIONALCOST TO OWNER, ANY DAMAGE CAUSED TO EXISTING CONSTRUCTION AND/OREQUIPMENT TO REMAIN.5. EXISTING SA/RA MAIN DUCTWORK SHOWN ON THIS DRAWING IS TO REMAIN ANDBE REUSED. WHERE BRANCH DUCTWORK IS SHOW TO BE DEMOLISHED, MAINDUCTWORK SHALL BE PATCHED AND SEALED AT LOCATIONS WHERE BRANCHES AREREMOVED.GENERAL MECHANICAL DEMOLITION NOTES:123456781011121314151617BA91234567810111213141516179DrawnProject ManagerCheckedContract Drawing DateProject NumberQPNMLKJHGFEDCBA18191819QPNMLKJHGFEDCB202120212222TSRTSRRevit Template Versionv16: 2017.10.05This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information itcontains may be copied or used for other than the specific project for which it was prepared without the written consent of BaxterHodell Donnelly Preston, Inc.
CINCINNATI
COLUMBUS
RALEIGH
PITTSBURGH
ATLANTA
LAWRENCE DIGENNARO, ARCHITECT
302 WEST THIRD STREET
SUITE 500
CINCINNATI, OHIO 45202
PHONE 513.271.1634HIG02.21THE HARTFORD GROUP - 3RD FLOOR RENOVATION
501 PENNSYLVANIA PKWY #400
INDIANAPOLIS, IN 46280
No.Issue/Revision/Submission Date
1 ISSUED FOR BID AND PERMIT 12/14/20182016.05.27M103THIRD FLOOR
MECHANICAL DEMOLITION PLAN 1M103THIRD FLOOR MECHANICAL DEMOLITION PLAN1/8" = 1'-0"AABJRHDCP