HomeMy WebLinkAboutP103 - Plumbing Demo PlanN.I.C.DNUPDNUPDNUPA.1A.2B.2C.2D.2D.3F.2G.2G.3H.2J.2K.2K.3L.2M.2N.2B.1C.1D.1E.1F.1G.1G.7H.1J.1K.1K.5L.1M.1N.112345678910111213141516171819202122232412341#PLUMBING DEMOLITION KEY NOTES:1.REMOVE EXISTING SINK, FAUCET AND ACCESSORIES. REMOVE AND CAP EXISTING HOTWATER, COLD WATER, SANITARY AND VENT BACK TO MAIN. PROVIDE CUTTING,PATCHING AND, FINISHES.2. REMOVE EXISTING ICE MAKER FILTER, SAFE WASTE, WATER CONNECTION ANDACCESSORIES. REMOVE AND CAP EXISTING COLD WATER, SANITARY AND VENT BACKTO MAIN. PROVIDE CUTTING, PATCHING AND, FINISHES.3.REMOVE EXISTING WATER SUPPLY BOX, SHUT-OFF VALVE AND ACCESSORIES.REMOVE AND CAP EXISTING COLD WATER BACK TO MAIN. PROVIDE CUTTING,PATCHING AND, FINISHES.4.REMOVE EXISTING WATER HEATER AND ACCESSORIES. REMOVE AND CAP EXISTINGHOT WATER, COLD WATER, SANITARY AND VENT BACK TO MAIN. PROVIDE CUTTING,PATCHING AND, FINISHES.PLUMBING DEMOLITION GENERAL NOTES:1.COORDINATE DRAINING AND FILLING OF SYSTEM WITH OWNER MAINTENANCEPERSONAL.123456781011121314151617BA91234567810111213141516179DrawnProject ManagerCheckedContract Drawing DateProject NumberQPNMLKJHGFEDCBA18191819QPNMLKJHGFEDCB202120212222TSRTSRRevit Template Versionv16: 2017.10.05This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information itcontains may be copied or used for other than the specific project for which it was prepared without the written consent of BaxterHodell Donnelly Preston, Inc.
CINCINNATI
COLUMBUS
RALEIGH
PITTSBURGH
ATLANTA
LAWRENCE DIGENNARO, ARCHITECT
302 WEST THIRD STREET
SUITE 500
CINCINNATI, OHIO 45202
PHONE 513.271.1634HIG02.21THE HARTFORD GROUP - 3RD FLOOR RENOVATION
501 PENNSYLVANIA PKWY #400
INDIANAPOLIS, IN 46280
No.Issue/Revision/Submission Date
1 ISSUED FOR BID AND PERMIT 12/14/20182016.05.27P103THIRD FLOOR
PLUMBING DEMOLITION PLAN 1P103THIRD FLOOR PLUMBING DEMOLITION PLAN1/8" = 1'-0"ZPKJRHDCP