HomeMy WebLinkAboutP203 - Plumbing PlanA.1A.2B.2C.2D.2D.3F.2G.2G.3H.2J.2K.2K.3L.2M.2N.2B.1C.1D.1E.1F.1G.1G.7H.1J.1K.1K.5L.1M.1N.11234567891011121314151617181920212223DNUPDNUPDNUPDNUPDNUPDNUPS-1CM-1IM-1WH-1SANSANVVCWCWDB-1312CWSANV2"3/4"1/2"3/4"2"COCO1-1/2"1-1/2"CO2"31/2"#PLUMBING KEY NOTES:1.PROVIDE COLD WATER, SANITARY, AND VENT PIPING TO EXISTING MAINS.2.REFER TO ELECTRIC WATER HEATER (CEILING MOUNTED) DETAIL ON SHEET P001.3.REFER TO BREAK ROOM SINK RISER DIAGRAM ON SHEET P001.PLUMBING GENERAL NOTES:1.COORDINATE AND FILLING OF SYSTEM WITH OWNER MAINTENANCE PERSONAL.123456781011121314151617BA91234567810111213141516179DrawnProject ManagerCheckedContract Drawing DateProject NumberQPNMLKJHGFEDCBA18191819QPNMLKJHGFEDCB202120212222TSRTSRRevit Template Versionv16: 2017.10.05This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information itcontains may be copied or used for other than the specific project for which it was prepared without the written consent of BaxterHodell Donnelly Preston, Inc.
CINCINNATI
COLUMBUS
RALEIGH
PITTSBURGH
ATLANTA
LAWRENCE DIGENNARO, ARCHITECT
302 WEST THIRD STREET
SUITE 500
CINCINNATI, OHIO 45202
PHONE 513.271.1634HIG02.21THE HARTFORD GROUP - 3RD FLOOR RENOVATION
501 PENNSYLVANIA PKWY #400
INDIANAPOLIS, IN 46280
No.Issue/Revision/Submission Date
1 ISSUED FOR BID AND PERMIT 12/14/20182016.05.27ZPKJRHDCPP203THIRD FLOOR
PLUMBING PLAN 1P203THIRD FLOOR PLUMBING PLAN1/8" = 1'-0"