Loading...
HomeMy WebLinkAboutA803 - Finish PlanN.I.C. DNUP DNUPDNUPN.I.C. DNUP DNUPDNUPGENERAL FINISH PLAN NOTES A. FURNITURE MANUFACTURERS, SUPPLIERS & INSTALLERS SHALL ADHERE TO THE GENERAL CONDITIONS THE PROJECT, INSTRUCTIONS TO BIDDERS, FURNITURE SPECIFICATIONS, & THE CONDITIONS & RESTRICTIONS FOR THE CONTRACTORS PERFORMING WORK. B. FURNITURE DELIVERY & INSTALLATION SHALL BE COORDINATED WITH THE OWNER'S PROJECT MANAGER & MOVE COORDINATOR. C. ALL DIMENSIONS & FIELD CONDITIONS INDICATED ON THE DRAWINGS ARE TO BE FIELD VERIFIED BY FURNITURE MANUFACTURERS, SUPPLIERS, & INSTALLERS PRIOR TO THE FABRICATION & INSTALLATION OF ANY MATERIAL. ANY DISCREPANCIES IN ACTUAL DIMENSIONS OR CONDITIONS ARE TO BE BROUGHT TO THE ARCHITECT'S ATTENTION BEFORE RESOLUTION, PRIOR TO THE PRECEDING WORK. D. ALL MISCELLANEOUS BRACKETS, CLIPS, SCREWS, OR OTHER HARDWARE REQUIRED FOR PROPER INSTALLATION & CONFIGURATIONS SHOWN MUST BE SUPPLIED AS PART OF THIS CONTRACT WHETHER OR NOT THESE ITEMS ARE NOTED ON THE DRAWINGS. E. ALL LOCKING EQUIPMENT IN EACH WORKSTATION SHALL BE KEYED ALIKE BUT DIFFERENT THAN ANY OTHER WORKSTATION (U.O.N). F. VERIFY ALL FURNITURE QUANTITIES. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION. G. FURNITURE INSTALLATION PERSONNEL MUST BE CERTIFIED BY THE MFG. OF THE PRODUCT BEING INSTALLED OR ENGAGE IN A TRAINING PROGRAM CONDUCTED BY THE MANUFACTURER, PRIOR TO THE INSTALLATION OF PRODUCT. H. FURNITURE INSTALLATION CONTRACTOR SHALL BE RESPONSIBLE FOR A CLEAN AREA & PROPERLY DISPOSE OF ALL FURNITURE PACKING MATERIALS OFF SITE. I. CONTRACTOR SHALL NOTIFY SUPPLIER OF ANY DAMAGED PRODUCT DELIVERED TO SITE. MATERIAL DAMAGED DURING INSTALLATION SHALL BE RESPONSIBILITY OF THE INSTALLING CONTRACTOR. J. FURNITURE INSTALLERS WILL BE RESPONSIBLE FOR ANY DAMAGE TO THE OWNER'S PROPERTY THAT IS INCURRED DUE TO FURNITURE INSTALLATION (AT NO ADDITIONAL COST TO THE OWNER). K. FURNITURE INSTALLERS SHALL LEVEL ALL FURNITURE. L. CORRECT YARDAGES, REPEATS, WIDTHS, REQUIRED TESTING & AVAILABILITY OF COM FABRICS ARE THE RESPONSIBILITY OF THE FURNITURE CONTRACTOR. FURNITURE CONTRACTORS ARE RESPONSIBLE FOR SCHEDULING DELIVERY TO THE APPROPRIATE MANUFACTURERS & PURCHASING ALL FABRICS. M. INCOMPLETE SPECIFICATIONS FOR ANY FURNITURE ITEM SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR RESOLUTION PRIOR TO BIDDING AND ORDER SUBMITTAL. FURNITURE CONTRACTOR IS RESPONSIBLE FOR THE COMPLETENESS OF ALL ITEMS SPECIFIED & TO PROVIDE A FUNCTIONING & COMPLETE PRODUCT. N. REFER TO 1/8" SCALE FURNITURE PLANS FOR ALL WORKSTATION LOCATIONS, PANEL LOCATIONS, & QUANTITIES. O. REFER TO 1/8" SCALE ENGINEERING PLANS FOR FEED TYPE, LOCATION, & QUANTITY. P. FURNITURE VENDOR TO PROVIDE INSTALLATION COORDINATION DRAWINGS FOR WORKSTATIONS AND SPECIALTY ITEMS. A.1A.2 B.2 C.2 D.2 D.3 F.2 G.2 G.3 H.2 J.2 K.2 K.3 L.2 M.2 N.2 B.1 C.1 D.1 E.1 F.1 G.1 G.7 H.1 J.1 K.1 K.5 L.1 M.1 N.1 1 2 3 4 5 67 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TRAINING ROOM 434 TRAINING ROOM 433 OFFICE 442 OFFICE 440 CONFERENCE ROOM 438 MULTIPURPOSE 449 PANTRY 450 VESTIBULE 403 MAIL AND SUPPLY 404 P2 C1 ACT1 B2 P2 C1 ACT1 B2 P1 RF1 ACT1 B1 P1 RF1 ACT1 B1 P2 C1 ACT1 B2 P2 C1 ACT1 B2 P2 C1 ACT1 B2 P2 C1 ACT1 B2 P2 C1 ACT1 B2 WC1 WT1 P3 760 760 760 ETR C1/C2 ETR ETR ETR C1/C2 ETR ETR 761761 761 Wall Floor Ceiling Base FLOOR PLAN KEY FINISH & MATERIAL ABBREVIATIONS * = INDICATES MORE THAN ONE FINISH. REFER TO GENERAL FINISH NOTES - = NO FINISH AC = ACOUSTICAL CEILING TILE B = WALL BASE C = CARPET CN = CONCRETE CT = CERMAIC/PORCELAIN TILE ETR = EXISTING TO REMAIN GB = GYPSUM WALLBOARD - PAINTED GL = GLAZING L = PLASTIC LAMINATE NC = NO CEILING, PAINT EXPOSED STRUCTURE P = PAINT RF = RESILIENT FLOORING (VCT, LINOLEUM, CORK, RUBBER) SP = REFER TO SPECIFICATIONS FOR FINISH SS = SOLID SURFACE TB = TACKBOARD TP = TOILET PARTITIONS WD = WOOD WT = WINDOW TREATMENTS FINISH LEGEND C1 PATTERN: INSTALLATION: EXISTING REPLACE DAMAGED TILES WITH RELOCATED TILES AS NEEDED C2 MFG: PATTERN: COLOR: SIZE: INSTALLATION: SHAW TRU COLORS BLUE GREEN 24" X 24" RANDOM; 40% WALL TILE (WT) WT1 MFG: PATTERN: COLOR: SIZE: INSTALLATION: GROUT: DALTILE RITTENHOUSE SQUARE ARCTIC WHITE 3" X 6" HORIZONTAL; STACKED MAPEI WHITE; 1/16" THICK PAINT (P) P1 MFG: COLOR: PPG COMMERCIAL WHITE RF1 ARMSTRONG NATURAL CREATIONS FINE LINE BAMBOO NA216 TITIAN GOLD 4" X 36" 1/8" RESILIENT FLOORING (RF) MFG: STYLE: COLOR: SIZE: THICKNESS: SOLID SURFACE (SS) SS1 MFG: COLOR: CORIAN ZODIAQ CLOUD WHITE CARPET (C) BASE (B) B1 MFR: COLOR: SIZE: JOHNSONITE 08 ICICLE 4" L1 MFG: COLOR: PLASTIC LAMINATE (L) PIONITE GRAPHITE SPEKTRUM WC1 KNOLL TEXTILES MEANDER POOL WALLCOVERING (WC) MFG: STYLE: COLOR: P2 MFG: COLOR: TBD BY CONTRACTOR MATCH TO EXISTING ACOUSTICAL CEILING TILE (ACT) ACT1 MFR: COLOR: SIZE: MATCH TO EXISTING WHITE 2' X 2' P3 MFG: COLOR: SHERWIN WILLIAMS SW6493 EBBTIDE B2 MFR: COLOR: SIZE: JOHNSONITE MATCH TO EXISTING 4" CARPET (CPT) RESILIENT FLOORING (RF) VINYL TILE CARPET JOINER. MFG: JOHNSONITE COLOR: PEBBLE 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 B A 9 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179 Drawn Project Manager Checked Contract Drawing Date Project Number Q P N M L K J H G F E D C B A 18 19 18 19 Q P N M L K J H G F E D C B 20 21 20 21 22 22 T S R T S RRevit Template Version v16: 2018.04.02This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.150 FAYETTEVILLE STSUITE 820RALEIGH, NC 27601PHONE 919.683.1084RALEIGHCOLUMBUSCINCINNATI274 MARCONI BLVDSUITE 200COLUMBUS, OH 43215PHONE 614.486.1960302 WEST THIRD STREETSUITE 500CINCINNATI, OH 45202PHONE 513.271.1634www.bhdp.com6425 LIVING PLSUITE 200PITTSBURGH, PA 15206PHONE 412.450.6031PITTSBURGH715 PEACHTREE STSUITE 100ATLANTA, GA 30308PHONE 470.426.3762ATLANTAC:\Users\ncarter\Documents\HIG0220 - Hartford Indy_ncarter.rvt 12/14/2018 3:32:07 PM SG, NC MC DS 2016.05.27 HIG02.21 A803THIRD FLOOR - FINISH PLANTHE HARTFORD GROUP - 3RD FLOOR RENOVATIONALLEN & SHARIFF ENGINEERING, LLCSHEET KEYNOTES 760 REFER TO R9/A803 FOR FLOOR TRANSITION. 761 EXTENT OF ACCENT CARPET. REFER TO R12/A803 FOR INSTALLATION INTENT. 1/8" = 1'-0"A803 1 LEVEL 3 - NEW WORK FLOOR PLAN 1 : 1A803 R9 FLOOR TRANSITION- CPT & RESILIENT 1 : 1A803 R12 C2 - INSTALLATION INTENT No.Issue/Revision/SubmissionDate1 ISSUED FOR BID AND PERMIT12/14/201812/17/2018