HomeMy WebLinkAboutD403 - Demo Reflected CeilingDNUP
DNUPDNUPDNUP
DNUPDNUPA.1A.2
B.2
C.2
D.2
D.3
F.2
G.2
G.3
H.2
J.2
K.2
K.3
L.2
M.2
N.2
B.1
C.1
D.1
E.1
F.1
G.1
G.7
H.1
J.1
K.1
K.5
L.1
M.1
N.1
1
2
3
4
5
67
8
9
10
11
12
13
14
15
16
17
1819
20
21
22
23
24
TYP.
260
259
259
GENERAL DEMOLITION NOTES
A. REFER TO DRAWING G001 FOR GENERAL PROJECT NOTES.
B. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING (MEP) DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION.
C. REMOVE ALL GYPSUM, AND DEMOUNTABLE PARTITIONS SHOWN DASHED ON DEMOLITION DRAWINGS. PARTITION REMOVAL TO EXTEND
FROM FLOOR TO UNDERSIDE OF STRUCTURE AND/OR CEILING ABOVE. DOORS AND FRAMES SHOWN DASHED WITHIN THE EXTENT OF
DASHED PARTITIONS ARE TO BE REMOVED, INCLUDING LINTELS, HEADERS AND TRANSOMS. REFER TO ELECTRICAL, MECHANICAL AND
PLUMBING DOCUMENTS FOR REMOVAL OF DEVICES WITHIN THE DASHED PARTITIONS. MAILBOXES, FURNITURE STANDARDS, SIGNS,
WHITEBOARDS, DISPLAY CASES, ETC. NOT MARKED FOR SALVAGE ARE TO BE REMOVED.
D. REMOVE ALL DOORS SHOWN DASHED WITHIN WALLS TO REMAIN. REMOVE ALL ASSOCIATED HARDWARE, INCLUDING THRESHOLDS. WALLS,
DOORS AND FRAMES SHOWN SOLID ARE TO REMAIN. PROTECT DURING DEMOLITION.
E. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DEMOLITION DRAWINGS FOR EXTENT OF DEMOLITION OF
MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL ITEMS.
F. REMOVE ALL EXISTING FURNITURE AND FREE STANDING EQUIPMENT NOT DESIGNATED FOR REUSE AS DIRECTED BY OWNER /
CONSTRUCTION MANAGER. FURNITURE AND FREE STANDING EQUIPMENT DESIGNATED FOR REUSE IS TO BE REMOVED AND STORED PER
OWNER / CONSTRUCTION MANAGER DIRECTION.
G. PROTECT EXISTING PERIMETER WALL AND WINDOW SYSTEM/CURTAINWALL FROM DAMAGE DURING DEMOLITION INCLUDING, BUT NOT
LIMITED TO, GYPSUM WALLBOARD, SILL, ALUMINUM CURTAINWALL WINDOW SYSTEM, AND GYPSUM SOFFIT.
H. EXISTING WINDOW BLINDS ON EXTERIOR WINDOWS TO REMAIN. PROTECT DURING DEMOLITION. REPAIR/REPLACE DAMAGED BLINDS AS
DIRECTED BY OWNER.
J. DEMOLITION CONTRACTOR TO VERIFY WITH OWNER AND/OR CONSTRUCTION MANAGER THOSE ITEMS THAT ARE TO BE SALVAGED PER
OWNER'S INSTRUCTIONS PRIOR TO BEGINNING WORK.
K. DEMOLITION CONTRACTOR TO ADVISE CONSTRUCTION MANAGER OF PARTITIONS REMAINING THAT HAVE BEEN WEAKENED AFTER
DEMOLITION AND ARE UNSAFE OR UNSALVAGEABLE.
L. DEMOLITION CONTRACTOR TO IDENTIFY ANY ELECTRICAL RISER OR PLUMBING RISER UNCOVERED WITHIN A DEMOLISHED PARTITION.
INCLUDES, MECHANICAL DUCT SHAFTS NOT INDICATED ON DOCUMENTS.
M. DEMOLITION CONTRACTOR TO SAFELY SECURE ANY AND ALL PIPING, WIRING, CABLES, OR DEVICES THAT ARE NOT SCHEDULED FOR
DEMOLITION AND WHERE SECURED BY ITEMS (PARTITIONS) THAT HAVE BEEN OR ARE SCHEDULED FOR DEMOLITION.
N. REMOVE EXISTING PLUMBING LINES AND DRAINS AS INDICATED ON PLUMBING DEMOLITION DRAWINGS. PATCH/REPAIR EXISTING FLOOR
SLAB WITHIN PROJECT AREA.
P. NO STRUCTURAL ELEMENTS (COLUMNS, BEAMS, GIRDERS, JOISTS, SLAB) ARE TO BE REMOVED OR ALTERED DURING DEMOLITION.
Q. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR PATCHING ANY SURFACES OR OPENINGS DAMAGED OR LEFT FROM DEMOLITION OF MEP
ITEMS. PATCH AREAS TO MATCH SURROUNDING CONSTRUCTION. REFER TO MEP DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION.
R. REMOVE ALL WALL/BASE CABINETS AND STORAGE EQUIPMENT SHOWN DASHED UNLESS NOTED OTHERWISE.
REMOVAL INCLUDES COUNTERTOPS, SUPPORTS, BACKSPLASHES, TABLES, WALL MOUNTED SHELVES AND
STANDARDS, SINKS AND ALL ASSOCIATED PIPING. REFER TO MEP DEMOLITION DRAWINGS FOR CAPPING AND
EXTENT OF REMOVAL.
S. ALL EXISTING INTERIOR ROOF DRAIN LEADERS TO REMAIN. PROTECT DURING DEMOLITION. PATCH AND
REPAIR AS REQUIRED. CONTRACTOR TO VERIFY LOCATION OF ROOF LEADERS PRIOR TO DEMOLITION.
T. PATCH ALL REMAINING SURFACES AFTER PARTITIONS ARE DEMOLISHED TO MATCH SURROUNDING
SURFACES. PRPEARE TO RECEIVE NEW FINISHES.
U. ALL CONCRETE TO BE DEMOLISHED SHALL BE SAWCUT SO TO LEAVE A SMOOTH SURFACE ON THE
STRUCTURE TO REMAIN.
V. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL STRUCTURE, WALLS, DOORS, FRAMES,
MEP ITEMS, ETC. THAT ARE REQUIRED TO REMAIN.
W. ALL EXISTING FLOORING (CARPET, CARPET PAD, VCT, TILE, ETC.) AND WALL BASE (RUBBER, TILE, ETC.) IS TO
BE REMOVED AS NOTED. SCRAPE FINISH FLOOR CLEAN OF ADHESIVES, FASTENERS, OR ANYIMPEDIMENTS TO
THE INSTALLATION OF NEW FLOOR COVERING AND BASE.
X. ALL EXISTING CEILING TILE AND SUSPENSION SYSTEM SHOWN DASHED TO BE REMOVED UNLESS OTHERWISE
DESIGNATED. REMOVE EXISTING LIGHTS, DIFFUSERS, MEP DEVICES, SHOWN DASHED. SALVAGE FOR REUSE
AS DIRECTED, REFER TO MEP DRAWRINGS.
Y. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR THE REMOVAL OF LIGHTS, DIFFUSERS, MEP
DEVICES. SALVAGE FOR REUSE AS DIRECTED.
Z. ALL TEMPORARY SECURITY DEVICES AND DETAILS TO BE COORDINATED WITH OWNERS SECURITY AND
ARCHITECT.
AA. LABEL ALL EXISTING CONDUIT TO REMAIN IN CEILING. REFER TO MEP.
BB. NO DEMO AT EXISTING COLUMN WRAPS, UNO.
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17
B
A
9
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179
Drawn
Project Manager
Checked
Contract Drawing Date
Project Number
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
18 19
18 19
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
20 21
20 21
22
22
T
S
R
T
S
RRevit Template Version v16: 2018.04.02This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.150 FAYETTEVILLE STSUITE 820RALEIGH, NC 27601PHONE 919.683.1084RALEIGHCOLUMBUSCINCINNATI274 MARCONI BLVDSUITE 200COLUMBUS, OH 43215PHONE 614.486.1960302 WEST THIRD STREETSUITE 500CINCINNATI, OH 45202PHONE 513.271.1634www.bhdp.com6425 LIVING PLSUITE 200PITTSBURGH, PA 15206PHONE 412.450.6031PITTSBURGH715 PEACHTREE STSUITE 100ATLANTA, GA 30308PHONE 470.426.3762ATLANTAC:\Users\ncarter\Documents\HIG0220 - Hartford Indy_ncarter.rvt 12/14/2018 3:32:26 PM
SG, NC
MC
DS
2016.05.27
HIG02.21
D403LEVEL THREE - DEMOLITION REFLECTED CEILING PLANTHE HARTFORD GROUP - 3RD FLOOR RENOVATIONALLEN & SHARIFF ENGINEERING, LLC 1/8" = 1'-0"D403
1 LEVEL 3 - DEMOLITION REFLECTED CEILING PLAN
SHEET KEYNOTES
259 REMOVE EXISTING CEILING IN ITS ENTIRETY. CEILING DEMOLITION TO INCLUDE BUT NOT
LIMITED TO CEILING TILES, MEP DEVICES, GRID, HANGER WIRES AND SUPPORTS. REFER TO
MEP FOR EXTENT OF MEP DEMOLITION.
260 SALVAGE LIGHT FIXTURE FOR REUSE. REFER TO NEW WORK REFLECTED CEILING PLAN FOR
NEW LOCATION.No.Issue/Revision/SubmissionDate1 ISSUED FOR BID AND PERMIT12/14/201812/17/2018