Loading...
HomeMy WebLinkAboutE103 - Electrical Demo2 2 2 2222442222 2 N.I.C.DNUPDNUPDNUPA.1A.2B.2C.2D.2D.3F.2G.2G.3H.2J.2K.2K.3L.2M.2N.2B.1C.1D.1E.1F.1G.1G.7H.1J.1K.1K.5L.1M.1N.1123456789101112131415161718192021222324PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPAVVS SVSVSAV VVSSSSSJPROJECTIONSCREENJPROJECTORVVAVSSSCRAVVSVSVS AVSS S VAVSS SJPROJECTIONSCREENJPROJECTORCRCRSAVCRCRVAVVVVCRCRAVAVEX PANEL 3PBEX PANEL 3PCEX PANEL 3PDEX PANEL 3PAEX PANEL 3PEX PANEL 3LEX PANEL 3HEX PANEL UPSCEX PANEL UPSBEX PANEL UPSANACEXV1ARRARRARRARRFFARRARRARR22BRRBRRBRRBRR3SSSSBRRBRRBRR11#ELECTRICAL DEMOLITION KEY NOTES:1.PROJECTOR, PROJECTION SCREEN, AND ASSOCIATED SWITCH SHALL BE REMOVEDAND RETURNED TO THE TENANT.2.EXISTING POWER POLE SHALL BE DISCONNECTED FROM SYSTEMS FURNITURESCHEDULED FOR DEMOLITION. POWER POLE SHALL BE RECONNECTED TO NEWSYSTEMS FURNITURE.3.EXISTING LIGHT SWITCHES SERVING OPEN OFFICE LIGHTING SHALL BE REMOVED ANDRELOCATED. REFER TO LIGHTING PLAN FOR NEW LOCATION.123456781011121314151617BA91234567810111213141516179DrawnProject ManagerCheckedContract Drawing DateProject NumberQPNMLKJHGFEDCBA18191819QPNMLKJHGFEDCB202120212222TSRTSRRevit Template Versionv16: 2017.10.05This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information itcontains may be copied or used for other than the specific project for which it was prepared without the written consent of BaxterHodell Donnelly Preston, Inc. CINCINNATI COLUMBUS RALEIGH PITTSBURGH ATLANTA LAWRENCE DIGENNARO, ARCHITECT 302 WEST THIRD STREET SUITE 500 CINCINNATI, OHIO 45202 PHONE 513.271.1634HIG02.21THE HARTFORD GROUP - 3RD FLOOR RENOVATION 501 PENNSYLVANIA PKWY #400 INDIANAPOLIS, IN 46280 No.Issue/Revision/Submission Date 1 ISSUED FOR BID AND PERMIT 12/14/20182016.05.27E103THIRD FLOOR ELECTRICAL DEMOLITION PLAN 1E103THIRD FLOOR ELECTRICAL DEMOLITION PLAN1/8" = 1'-0"JRHJRHDEB