Loading...
HomeMy WebLinkAboutBuilding Permit P2RE: DRAINAGE SiIALES 4 All required drainage swales must be shown on the plot plan and constructed in all subdivisions prior to the Department of Coinnunity Development performing a final inspection of any structurtj C,ARMM/CLAY DEPARIINIM OF OWAUNITY DEhMT per plans on file or per the following: Constructed swd1L•s shall be a minimum of 1'6" deep with side slopes -BUILDING PERMIT of not less than a tr 1. REQUIRED PIIn PLAN INFORMATION The below listed information must be included on all site or plot. plans which are to be submitted to the Camel/Clay Department of Community Development as a part of the Building Permit review process. If limited, pertinent information is desired from the Department of CcmT=ity Development, a five (5) day waiting period MAY be required in order to search files for the desired information. The below REQUIRED information can be secured from the landowner or land developer: Lot drawn to.scale All dimensions Scale and North arrow All roads, alleys, etc., right-of-way All other utility and drainage right-of-way and easements Any applicable flood plain area Building pad elevation and lot corner elevations All accessory buildings existing or proposed All sidewalks and driveways Sewer and water lines, septic system and well location Drainage flow arrows All drainage swales and facilities (retention/detention areas etc.) Dimensional cross sections of all drainage Evales All subsurface drainage facilities I certify that alf the above listed information is shown completely .and accurately on the attadhed plot or site plan as submitted with a building permit application to the Carmel/Clay Department Community Development NAME OF PLUMBING CONTRACTOR: Paul E. Smith Company, Inc. VALID STATE LICENSE NUMBER: 1 -22