Loading...
HomeMy WebLinkAboutBuilding Permit P2,�': " CARMEL /CLAY TOWNSHIP � , DEPARTMENT OF C OMMUN = TY DEVELOPMENT ' Building PBrm1•t =nformat3.o�cs CARMEL ZONING ORDINANCE Z-160. SECTION 29.4.2(3): THE. BUILDING COMMISSIONER (DIRECTOR. DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY.THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF THE WRITTEN. APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT.(BUILDING PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. The followine must be received by the Denartment of Community T1AVB1nnment hwfnrw anv 1. A completed Improvement Location Permit application. 2. Two (2) complete sets of construction plans. In compliance with the Stag Engrgl Code. must list R -values on.walls. ceilings, etc. If a commercial construction, plans must be stamped approved by the Indiana State Department of Fir@!..:J Prevention and Building Safety. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies) or septic permit (Hamilton -County Health Department). 4. Three (3) copies of a site or plot plan showing the following REQUIRED information (can be obtained from the landowner or land developer): Lot drawn to scale All dimensions - Scale and North arrow All roads, alleys, right-of-ways. etc. - All other utilities and drainage right-of-ways arld•easements Any applicable flood plain area j Building pad elevation and lot corner elevations • All accessory buildings -- existing or proposed All sidewalks and driveways ; 'Sewer and water lines, septic system and well location i - Drainage flow arrows - All -drainage swales and subsurface facilities (retention/detention areas. at • Dimensional cross sections of all drainage swales - Sump pump (sump pump pits) showing discharge locations • Geothermal heat pump discharge locations Drainage Swales_ All required drainage swales must ba.shown an the plot plan. and cons;rueted in all subdivisions prior to the Department of Community Development -performing a final inspection of any structure per plans on file. or per the...following: Constructed swales shall be a minimum of 116" deep with.side slopes of not less than 4 to 1. i If this information is not submitted, it will extend the time it takes to get an,approved building permit.. I CERTIFY THAT ALL OF THE ABOVE LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY. ON'THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOPMENT. SIGNATURE: PHONEr ADDRESS: NAME OF'PLUMBING CONTRACTOR: Tf Applicable) VALID STATE PLUMBINC LICENSE NUMBER: I