HomeMy WebLinkAboutWSB 112 - SeweriuM N. uoiiege Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913245
Permit Type Final Subdivision Woods at Shelborne
Project WO
1957183649
Section Number
2
Project Name
Woods at Shelborne Sec. 2
Lot Number
112
Project Developer
Pulte Group
Address Number
3308
Lift Station
16 Zionsville Presbyterian Station
Address 2
First Floor Elevation
Treatment Plant
CTRWD WWTP
Street
Shelborne Woods Parkway
Parcel Acreage
0.34
City
Carmel
EDU in Gallons
310
Zip Code
46032
County
Hamilton
Local Sewer Charge - District Contribution 0.00
guilder
Plan Review and Inspection
0.00
Pulte Group
---
Application Fee
150.00
Phone Number
317-575-2350
EDU Fee
1908.00
Owner
Interceptor Fee
0.00
phone Number
Other Fees
0.00
Fees Due
2058.00
Occupant
Invoice Number
Phone Number
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Main ID:
WAS719-WAS712
Grease Trap Slab Foundation
Grease Interceptor Crawl Space
Manhole IDs USMH
WAS -719 WAS -712 DSMH
Grit Interceptor Basement YES
Lid Elevation
/
904.26/
906.97
Grinder Station
First Floor Elevation
908.10,/908.10
Water Service City of Carmel
Basement Elevation
898.30 ✓
898.30
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
4
1.13 Ft.
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
Ejector Pump Only
Trico currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a proper-ty. Please review attached 1/1 Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
ms of the conditional permit, if any, are listed below.
Plans have been submitted
All fees have been paid.
No certificate of insurance required.
No additional permits required.
No manhole core permit required.
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am
c
Builder / Owner Signature
Printed Name
Approved By
Ryan
Permit is valid &
specifications and agree to accept responsibility for all work done under this permit.
Phone Number `- a 5�er 6:3
n, District Engineer
YEAR from the date issued. Permit valid only with