Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R102B
,80 (NBY) Lj 43 (NEW) H csx 0 22 Z Z a £ £ IS) O H H 0 0 OH i �1 H I II�II III r B22 e1 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 05/03/19 H HH 19: I_II III III III III III A18 A37 "a Ale A39 PIT SCHEDULE N0. QTY. L x W x D (inches) MODEL COVER Y/N TYPE FIB. GLASS LINER Y/N l� -- 24x24x18 ADL Y - Y Q2 24x24x24 ADL Y - Y Q3 -- 24x36x24 ADL Y - Y ® -- 24x24xl8 APO Y - Y QS 24x24x24 APO Y - Y © 24x36x24 APO Y - Y 07 36x36x24 ADL Y - Y ® -- EXISTING, REUSE PH TO BE REUSED FOR NEW CASE LAYOUT 99 - EXISTING,ABANDON GC TO PROVIDE NEW DIAMOND PLATE LID ® - EXISTING, REMOVE GC TO REMOVE EXISTING PIT LID AND BACKFILL ISSUED FOR CONSTRUCTION ISSUED FOR BID ISSUED FOR PERMIT ISSUED FOR REDLINE ISSUED FOR 50 % KICK OFF MEETING FINAL APPROVED PLAN REFRIGERATION LEGEND: Z� ISOLATION BALL VALVE Rw ELECTRONIC EVAPORATOR PRESSURE REGULATOR (EEPR) Rw EVAPORATOR PRESSURE REGULATOR (EPR) SOLENOID VALVE H CHECK VALVE L 3-WAY VALVE THERMAL EXPANSION VALVE ANGLE PURGE VALVE # NEW REFRIGERATION PIT BOX REFERENCE SCHEDULE FOR PIT #, MODEL. EXISTING REFRIGERATION PIT BOX s1 REFRIGERATION CASE TEMPERATURE SENSOR FURNISHED AND INSTALLED BY OEM. WIRED PULLED BY EC. TERMINATIONS BY RC. REFRIGERATION COOLERIFREEZER(BOX PROBE) 51 TEMPERATURE SENSOR FURNISHED AND INSTALLED BY RC. WIRE PULLED BY EC. TERMINATIONS BY RC. REFRIGERATION COOLEWFREEZER (BULLET TYPE) s9 TEMPERATURE SENSOR FURNISHED AND INSTALLED BY RC. WIRE PULLED BY EC. TERMINATION BY RC. REFRIGERATION CASE TEMPERATURE SENSOR FURNISHED AND INSTALLED BY RC. WIRED PULLED BY EC. TERMINATIONS BY RC. s% EXISTING TEMPERATURE SENSOR TO REMAIN OEM INSTALLED & WIRED CASE TEMPERATURE SENSOR, rl I/O BOARDS AND SOLENOID VALVES PER CASE. Fa OEM INSTALLED & WIRED CASE TEMPERATURE SENSOR, INPUT BOARD, ESR BOARD AND CDS VALVE. REFRIGERATION CASE DEFROST TERMINATION SENSOR FURNISHED 0T1 AND INSTALLED BY OEM. WIRE PULLED BY EC. TERMINATIONS BY RC. OREFRIGERATION CASE (COOLER/FREEZER) DEFROST TERMINATION 0T2 SENSOR FURNISHED AND INSTALLED BY RC. WIRE PULLED BY EC. TERMINATIONS BY RC. 5C SELF CONTAINED REFRIGERATION DISPLAY CASES ® EXISTING DANFOSS AKCC550 CASE CONTROLLER WITH EEV. CCI DANFOSS AKCC550 CASE CONTROLLER. OEM INSTALLED. DANFOSS AKCC550 CASE CONTROLLER ENCLOSURE. RC TO FURNISH CC2 AND INSTALL ON OUTSIDE OF COOLER/FREEZER IN A SERVICABLE LOCATION. COORDINATE WITH EC FOR RS-485 COMMUNICATION NETWORK WIRING MODIFICATIONS. FIELD VERIFY. EEvx EXISTING ELECTRONIC EXPANSION VALVE. 8EV FIELD WIRED ELECTRONIC EXPANSION VALVE. ae EMS REMOTE ENCLOSURE. REFERENCE R-501 FOR I/O POINTS. PARASENSE LEAK DETECTION CHANNEL I.D. Lnx REFERENCE R-201 FOR CHANNEL I.D. A. SUCTION / RETURN LINE LIQUID / SUPPLY LINE - — — - NEW 8" PVC UNDERGROUND REFRIGERATION LINE CONDUIT. ---- EXISTING 8" PVC UNDERGROUND REFRIGERATION LINE CONDUIT. ---- EXISTING UNDERGROUND TRENCH RISER GENERAL NOTES A. REFRIGERATION INSTALLATION SHALL BE PERFORMED IN CONFORMANCE OF GIANT EAGLE SPECIFICATIONS SECTION 240000, 2010 ASHRAE HANDBOOK, and OEM INSTALLATION MANUALS. B. REFRIGERATION CONTRACTOR TO COORDINATE PIPE ROUTING REFRIGERATION EQUIPMENT PLACEMENT WITH WORK OF OTHER TRADES. C. REFRIGERATION CONTRACTOR TO PROVIDE AND INSTALL NEW REFRIGERATION PIPING AND HANGERS IN ACCORDANCE TO GIANT EAGLE PIPING PRACTICES. D. REFRIGERATION RISERS TO BE MADE AT DESIGNATED LOCATIONS AND COORDINATED WITH GIANT EAGLE INC. FOR RISER INDICATED NEAR A COLUMN LINE, RISE AS CLOSE AS POSSIBLE TO THAT COLUMN LINE. FOR RISERS AT A COLUMN SEE R301, DETAIL 12 E. OVERHEAD REFRIGERATION LINES MUST NOT RUN UNDER SKYLIGHTS. COORDINATE OVERHEAD RUNS WITH SKYLIGHTS F. INSTALL PIPE HIGH POINTS AS CLOSE AS POSSIBLE TO BOTTOM OF JOISTS G. REFRIGERATION CONTRACTOR IS TO COORDINATE PLACEMENT OF REFRIGERATION PITS & COVERS. PIT LOCATIONS ON THIS PLAN ARE STRICTLY DIAGRAMMATICA . GENERAL CONTRACTOR TO FURNISH & INSTALL. REFRIGERATION CONTRACFOR TO SEAL PIT COVERS IN PREP AREA AT COMPLETION OF INSTALLATION. H. REFRIGERATION CONTRACTOR IS RESPONSIBLE TO RECEIVE, SET, AND INSTALL GIANT EAGLE PROVIDED REFRIGERATED DISPLAY CASES INCLUDING SELF CONTAINED UNITS AND WALK-IN COOLERIFREEZER PANELS AS PER T-1. I. REFRIGERATION CONTRACTOR TO PROVIDE, COORDINATE, SET, AND LEVEL EQUIPMENT SUPPORT RAILS AND PIPE PORTALS FOR ROOF TOP REFRIGERATION EQUIPMENT AS PER STRUCTURAL DRAWINGS. GC AND ROOFING CONTRACTOR RESPONSIBLE FOR FINAL INSFALLATION. J. SEE R401/R402/R501/R502 FOR ADDITIONAL INFORMATION ON BMS AND SENSORS. REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR PROGRAMMING OF BMS K. REFRIGERATION CONTRACTOR TO REMOVE ALL ABANDONED, UNUSED REFRIGERATION PIPING, HANGERS, SUPPORTS, COMPRESSOR RACK, AND CONDENSERS. L COORDINATE DISPOSITION OF REMOVED EQUIPMENT WITH GIANT EAGLE- M. GC TO PROVIDE OPENING FOR ALL REFRIGERATION LINES TO COMPRESSOR ROOM, CONDENSORS AND CASES. KEY NOTES I]1 REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL SUCTION LINE ISOLATION BALL VALVE AND LIQUID LINE ISOLATION BALL VALVE IN THE BRANCH LINES OF EACH CIRCUIT OVERHEAD. REFERENCE LOOP SCHEMATICS ON R-201- [21 REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL EEPR, SUCTION LINE ISOLATION BALL VALVE AND LIQUID LINE ISOLATION BALL VALVE IN THE BRANCH LINES OF EACH CIRCUIT ON TOP OF CASE, UNDER CASE OR ON TOP OF COOLER/FREEZER. (] REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL EEPR/EPR VALVE AT RACK OR HER FOR PROPOSED REFRIGERATION SYSTEM. (] REFRIGERATION LINES TO RUN UNDERGROUND AND TRAP IN PIT AT RISER LOCATION. REFRIGERATION RISERS RUN IN THE WALUOR EXPOSED. COORDINATE WITH PLUMBING AND ELECTRICAL TRADES FOR LOCATION. REFERENCE DETAIL #11/R-302. © REFRIGERATION LINES FROM CASE(S) THE INTO MANIFOLD ON TOP OF CASE(S), TRAP AT RISER LOCATION , RISE EXPOSED AND RUN OVERHEAD TO MAIN LOOP, RACK OR HDR. REFERENCE DETAIL #12/R-301. © REFRIGERATION LINES FROM CASE(S) TIE INTO MANIFOLD ON TOP OF CASE(S), TRAP AT RISER LOCATION , RISE IN WALL AND RUN OVERHEAD TO MAIN LOOP, RACK OR HDR. REFERENCE DETAIL #12/R-301. Lf REFRIGERATION LINES FROM CASE(S) TIE INTO MANIFOLD UNDER CASE(S), TRAP AT RISER LOCATION , RISE EXPOSED AND RUN OVERHEAD TO MAIN LOOP, RACK OR HDR. M INDIVIDUAL SUCTION LINES RUN TO RACK. LIQUID LINES RUN TO RECEIVER OR LIQUID LOOP. 09 INSTALL DOUBLE SUCTION RISER. 10 TOP FEED ELECTRICAL. TOP FEED REFRIGERATION. 01 BOTTOM FEED ELECTRICAL. BOTTOM FEED REFRIGERATION. 12 REFRIGERATION RISERS RUN IN WALL/BULKHEAD. 13 RC TO PROVIDE INTERMEDIATE TRAP FOR SUCTION RISERS EXCEEDING 15'. 14INSTALL NEW EVAPORATOR COILS PROVIDED BY REFRIGERATION CONTRACTOR. 15 REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL LIQUID LINE ISOLATION BALL VALVE IN BRANCH LINES OF EACH CIRCUIT OVERHEAD. LEREFRIGERATION PIPING ENCLOSURE. GC TO PROVIDE AND INSTALL. REFERENCE MECHANICAL DRAWINGS FOR ENCLOSURE DETAILS. 17 I/O BOARDS AND SOLENOID VALVES ARE FACTORY INSTALLED PER CASE. 18 RC TO PROVIDE AND INSTALL NEW TXV VALVE. 19 I/O BOARDS, TEMP SENSOR, SOLENOID VALVES AND EEPR VALVE ARE FACTORY INSTALLED PER ISLAND. UAIE REV. LOG REVISIONS N0. N0. DWG.TFILE REFRIGERATION PIPING PLAN PROJECT GIANT EAGLE #6550 LOCATION THE BRIDGES 116 STREET & SPRING MILL ROAD 04/19/19 OWNER CARMEL, IN 04/19/19 -- I 0 _= FAZ 104/03/19Uo�w�l-6„r 300 S. MAIN STREET, PITTSBURGH, PA 15215 BMH F (412) 782-6338 DMGNED EY FAZIOMECHANICALCOM BMH ly