HomeMy WebLinkAboutej 2 of 6OPHONE COMPANY SERVICE TO BE INSTALLED AT BOC LOCATION PER DETAIL ON SHEET 6 OF 6 AND PER SPECIFICATIONS ON 1ST
DAY OF CONSTRUCTION. ALL EMAIL PHOTO TO LEASING COORDINATOR TO CONFIRM WORK ASAP.
Tenoeov 2mmnnu
O INSTALL DOORHORIZONTAL
AT ENTRY ODOR. CHIME TO
MOD BE LOCATED R OMPA ABLE ABAYLTERNATIVE
WIRELESS DOOR ALERT WITH WHITE - ° y,.•••^•
COVER BHORIZONTAL LINES - HOME DEPOT MODEL pSL-61660R COMPARABLE ALTERNATIVE. ° :,•�VppO �
60 IF LOCAL CODE WILL NOT ALLOW FOR THUMB TURN LOCKSET AT ENTRY DOOR, NOTIFY DESIGNER IMMEDIATELY WITH r
O ALTERNATIVE OPTIONS FOR LOCKSETS WITH INTERIOR LOCKING MECHANISMS.13 •\�dy ��"
O O GC TO INSTALL KITCHENETTE WITH SINK.
O INSTALL ELECTRICAL SERIES AT BOA WORKSTATION 2'-0" FROM CORNER, STARTING WITH RECESSED OUTLET, AS INDICATED BY
TOT 5 ARROW ON FLOOR PLAN TO ALLOW FOR PROPER EQUIPMENT INSTALLATION.
ALI fo
60 FURR EXISTING CMU AS REQUIRED FOR NEW FIN ISHES.
X0o ]O FILER EXISTING PIPING AS REQUIRED FOR NEW FINISHES. nE
$ o w
CONTRACTOR SITE SPECIFIC NOTES: 'a w
1. LANDLORD TO DELIVER SPACE IN TURNKEY CONDITION. LLD TO COMPLETE TENANT IMPROVEMENTS. 3 un2 2. ALL ITEMS TO BE COMPLETED PER EDWARD JONES SPECIFICATIONS, SEE PAGES 4-5 UNLESS OTHERWISE NOTED.
O 3. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS& WINDOW MULLION PLACEMENT PRIOR TO CONSTRUCTION; IF YOU ARE UNABLE K a�0
TO VERIFY DIMENSIONS OR IF A DISCREPANCY OCCURS, NOTIFY DESIGNER IMMEDIATELY. OFIN
4, INC TOINSTALL '4'CATSE PHONE LINES IN 314'CONDUIT PROVIDED BY GO FROM BUILDING SOURCE TO BOC LOCATION IN ioz
EQUIPISUPP 104, SEE DETAIL ON SHEET 6 OF 6.4. BRANCH TO BE PREWIRED PER LOCAL CODES. PREWIRING TO BE COMPLETED U r�iy
OBY INC-GC TO COORDINATE; INC TO INSTALLM' CAT5E PHONE LINES IN 314' CONDUIT PROVIDED BY GC FROM BUILDING SOURCE y "" y
6 TO BOC LOCATION IN(EQUIPISUPP 104), SEE DETAIL ON SHEET 6 OF 6. 2
O 5. INSTALL NEW ELECTRICAL PER PLAN UNLESS WITHIN 36" OF EXISTING RECEPTACLE. VERIFY EXISTING ELECTRICAL PANEL MEETS Z oF�aN
EDJ SPECIFICATIONS', UPGRADE OR ADD SUBPANEL AS REQUIRED. EP IS LOCATED IN A COMMON AREA, INSTALL BREAKER LOCKS 3�
O
OPEN
vp0 a AS REQUIRED. O p In Q
6. INSTALLIRELOCATE SUPPLY & RETURN GRILLES, INCLUDING DUCTWORK, AS REQUIRED FOR COMPLETE& BALANCED WORKING emu- �
SYSTEM AND TO ACHIEVE ONE SUPPLY &ONE RETURN AT MINIMUM IN EACH ROOM .CLEAN & CHECK HVAC UNIT; INSTALL DIGITAL 00w�F
PROGRAMMABLE THERMOSTAT AS SHOWN ON PLAN IN PASSAGE 103.
1, INSTALL T& LAMPS AND ELECTRONIC BALLASTS IN ALL EXISTING FIXTURES IF NOT EXISTING, INSTALURELOCATE 2'x4'
FA FLUORESCENT LAY -IN LIGHTS ACCORDING TO NEW PARTITIONS; (2) NIGHT LIGHTS TO BE HARDWIRED AT 101&103. INSTALL y
ovTme
O COMMERCIAL WRECESSED SPOTLIGHT TO ILLUMINATE INTERIOR LOGO AS PER KEYNOTE B ON PAGE 3 OF 6 SEPARATELY SO
SWITCHED. INSTALL INSULATION ABOVE CEILING AT ROOM 102 & 106, y
,._L. S. INSTALL NEW 2XTACOUSTICAL CEI LING GRID &TILES AT " A.F.F. WITH TX4'LAY-IN FLUORESCENT LIGHT FIXTURES TO MEET
LOFT EDWARD JONES LIGHTING SPECIFICATIONS. (2) NIGHT LIGHTS TO BE HARDWIRED AT 101 & 103. INSTALL INSULATION ABOVE
CEILING AT ROOM 102 )& 106). INSTALL COMMERCIAL 6' RECESSED SPOTLIGHT TO ILLUMINATE INTERIOR LOGO AS PER KEYNOTE B
ON PAGE 3 OF 6; SEPARATELY SWITCH.
9. PATCH ,REPAIR ,& PREP EXISTING PARTITIONS AS REQUIRED FOR NEW FINISHES. ENSURE ALL PARTITIONS ARE SIMILAR IN p r
ovo OFTEXTURE; MATCH AS REQUIRED. - o
10. VERIFY LOCATION OF ALL EXISTING DEMISING PARTITIONS. VERIFY THAT THEY EXTEND TO THE DECK &ARE INSULATED; EXTEND& >gLL
ADD INSULATION AS REQUIRED. aED
Ouzo. I 11. ENSURE ALL FLOORING SURFACES ARE CLEAN, DRY, SMOOTH,&LEVELWITHIN 3116" PER EVERY 10 FEET, READY TO ACCEPT NEW �Qo m
em�ao FINISHES PER FINISH SCHEDULE. RESILIENT FLOORING IN 10111031105 TO BE INSTALLED PARALLEL TO FRONTDOOR.NEW
CONSTRUCTION, GC REQUIRED TO COMPLETE MOISTURE TEST. IF MOISTURE READING IS ABOVE 95, UTILIZE RESILENT HIGH `�N
MOISTURE ADHESIVE PATCRAFT LocDals, 6-ROLL SLEEVE.
BOA 12. INSTALL NEW ADA FIXTURES,ACCESSORIES, AND HARDWARE AS REQUIRED IN TOILET 105 AND THROUGHOUT SPACE, = -
EXHAUST FAN VENTED TO EXTERIOR& LIGHT FIXTURE IN TOILET 105 AS REQUIRED BY LOCAL CODE. m ao
3DEMOALLABANDONEDPIPING&VOICEIDATWIRING ;RAEI En FOR CONSTRIICTIUN
14INSTALL 3-06-PANEL - N
SOLID CORE DOORS THROUGHOUT. INSTALL STORE ROOM LOCKSET& DOOR CLOSER AT 104. _ o
PROVIDE& INSTALL PRIVACY LOCKSET& DOOR CLOSER AT 105. =
Subject to canpliance with all reguhtians REQUIREDLOCALCOICc: o 0
of State and Local Codes DEMARC EXTENSION WORK PER DETAIL ON ISSUESIREVISION S l
Cdy of Cerelel mIvury SHEET 60F 6, TO BE COMPLETED ON THE FIRST I NO TnTe I oasulnxu FE o NORTH DAY OF CONSTRUCTION. GC TO INSTALL BOARD
AND CONDUIT
WITH COORDINATE INSTALL OF EXHIBITA
CAT5E LINES WITH INC. EMAIL PHOTO TO
LEASING COORDINATOR TO CONFIRM WORK SHEET 01 6
DATE: 05/07/1 9 COMPLETION. L