HomeMy WebLinkAbout4224 0017 - WWC 17 - Truss DetailsDE
DANSCO ENGINEERING, LLC
P.O. Box 3400
Apollo Beach, FL 33572
Telephone (813) 645-0166
Facsimile (813) 645-9698
The truss drawing(s) attached have been prepared by Dansco Engineering, LLC under
my direct supervision and control based on the parameters provided by Stark Truss Inc.
Job: 1903535-12T
84 truss design(s)
65047-W1
3/29/19
Samuel A. Greenberg, P.E.
Indiana Reg. #19700485
Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural
gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length
is the distance from the top chord to bottom chord.
The seal on these drawings indicate acceptance of professional engineering
responsibility solely for the truss components shown. The suitability and use of this
component for any particular building is the responsibility of the building designer, per
ANSI/TPI 1-2007 Chapter 2.
Warning !—Verify design parameters and read notes before use.
These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of
design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is
for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the
erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication,
quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss
Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate
Institute, 583 D’Onofrio Drive, Madison, WI 53719
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J01
Truss Type
Jack-Open
Qty
8
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:33 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-bDV35NqEFlx35z9K80hb1X_B4n?AI0xnkh0jyuzWJSm
Scale = 1:21.6
W1
T1
B1
1
2
5
3
43x4
3x4
2-0-0
2-0-0
-0-10-4
0-10-4
2-0-0
2-0-0
2-1-14
3-7-14
3-2-6
3-7-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.35
0.20
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
-0.01
-0.04
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 9 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=130/0-6-0 (min. 0-1-8), 3=34/Mechanical, 4=17/Mechanical
Max Horz 5=87(LC 13)
Max Uplift3=-72(LC 16), 4=-28(LC 13)
Max Grav 5=150(LC 2), 3=65(LC 30), 4=51(LC 14)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left exposed ; end vertical left exposed;C-C for members
and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 72 lb uplift at joint 3 and 28 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J02
Truss Type
Jack-Open
Qty
19
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:34 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3P3RIjrs023wi7kWijCqZlXMIAL81TBxyLmGUKzWJSl
Scale = 1:24.3
W1
T1
B1
1
2
5
6
7
3
4
3x4
2x4
4-1-8
4-1-8
-0-10-4
0-10-4
4-1-8
4-1-8
1-1-14
4-3-0
3-9-8
4-3-0
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.32
0.22
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.04
0.05
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 13 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-1-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=196/0-6-0 (min. 0-1-8), 3=89/Mechanical, 4=44/Mechanical
Max Horz 5=133(LC 16)
Max Uplift3=-101(LC 16), 4=-5(LC 16)
Max Grav 5=224(LC 2), 3=122(LC 30), 4=75(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-1-12, Interior(1) 2-1-12 to 4-0-12 zone; cantilever left exposed ;
end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 101 lb uplift at joint 3 and 5 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J03
Truss Type
Jack-Open
Qty
22
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:35 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-XbdpW2rUnMBnKHJiFRj36y3X7affmwR4B?Vq1mzWJSk
Scale = 1:26.2
W1
T1
B1
1
2
5
6
7
3
4
4x4
2x4
4-7-8
4-7-8
-0-10-4
0-10-4
4-7-8
4-7-8
1-1-14
4-7-8
4-2-0
4-7-8
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.38
0.27
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.04
-0.06
0.06
(loc)
4-5
4-5
3
l/defl
>999
>826
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 14 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-7-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=213/0-6-0 (min. 0-1-8), 3=101/Mechanical, 4=50/Mechanical
Max Horz 5=148(LC 16)
Max Uplift3=-112(LC 16), 4=-4(LC 16)
Max Grav 5=243(LC 2), 3=137(LC 30), 4=85(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-1-12, Interior(1) 2-1-12 to 4-6-12 zone; cantilever left exposed ;
end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 112 lb uplift at joint 3 and 4 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J04
Truss Type
Jack-Open
Qty
6
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:36 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-?nBCjOs6YgKeyRuvp8EIe9ckj_1zVNhEQfFNZCzWJSj
Scale = 1:20.2
W1
T1
B1
1
2
5
6
3
4
3x4
3x4
2-10-0
2-10-0
-1-0-4
1-0-4
2-10-0
2-10-0
1-3-6
3-4-14
2-11-6
3-4-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.20
0.13
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
-0.01
-0.02
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 10 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-10-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=165/0-4-0 (min. 0-1-8), 3=54/Mechanical, 4=26/Mechanical
Max Horz 5=96(LC 16)
Max Uplift3=-73(LC 16), 4=-26(LC 13)
Max Grav 5=191(LC 2), 3=78(LC 30), 4=49(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-0-4 to 1-11-12, Interior(1) 1-11-12 to 2-9-4 zone; cantilever left exposed ;
end vertical left exposed; porch left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 73 lb uplift at joint 3 and 26 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J05
Truss Type
Jack-Open
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:37 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-T_lawktkJzSVZaT5NsmXBN9wAOODEqxNeJ_x5fzWJSi
Scale = 1:14.9
W1
T1
B1
1
2
5
3
42x4
2x4
1-5-2
1-5-2
-1-0-4
1-0-4
1-5-2
1-5-2
1-3-6
2-4-3
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.16
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.01
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 6 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 1-5-2 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=131/0-4-0 (min. 0-1-8), 3=11/Mechanical, 4=7/Mechanical
Max Horz 5=60(LC 13)
Max Uplift3=-38(LC 16), 4=-26(LC 13)
Max Grav 5=164(LC 22), 3=26(LC 30), 4=22(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left exposed ; end vertical left exposed; porch left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 38 lb uplift at joint 3 and 26 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J06
Truss Type
Diagonal Hip Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:38 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-xAIy84uM3HaMBk2HxZHmkah2UnjlzHBWtzkUd5zWJSh
Scale = 1:19.5
W1
T1
B1
1
2
5
6
7
8
3
9 10
4
3x4
3x4
4-11-1
4-11-1
-1-10-1
1-10-1
4-11-1
4-11-1
1-3-6
3-3-15
0-4-7
2-11-8
3-3-15
4.99 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.38
0.18
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.05
-0.05
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 15 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-11-1 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=193/0-6-1 (min. 0-1-8), 3=82/Mechanical, 4=34/Mechanical
Max Horz 5=84(LC 16)
Max Uplift5=-124(LC 16), 3=-69(LC 16), 4=-29(LC 9)
Max Grav 5=226(LC 18), 3=96(LC 2), 4=79(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left exposed ; end vertical left exposed; porch left and right exposed; Lumber
DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 124 lb uplift at joint 5, 69 lb uplift at joint
3 and 29 lb uplift at joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 19 lb down and 20 lb up at
2-3-15, and 75 lb down and 27 lb up at 2-7-12 on top chord, and 3 lb down and 28 lb up at 2-3-15, and 28 lb down and 32 lb up at
2-7-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
10) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-51
Concentrated Loads (lb)
Vert: 9=1(F) 10=1(B)
Trapezoidal Loads (plf)
Vert: 2=-2(F=24, B=24)-to-3=-62(F=-6, B=-6), 5=0(F=10, B=10)-to-4=-25(F=-2, B=-2)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J07
Truss Type
Jack-Open
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:39 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-PMsKLQv_qbiDpucTUGo?GoEF0B4iikRg6dT1AXzWJSg
Scale = 1:14.2
W1
T1
B1
1
2
5
6
3
4
1.5x4
3x4
2-1-6
2-1-6
-1-4-12
1-4-12
2-1-6
2-1-6
1-2-0
2-2-11
1-10-1
2-2-11
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.20
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.01
(loc)
4-5
4-5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 8 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-1-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=178/0-4-0 (min. 0-1-8), 3=24/Mechanical, 4=12/Mechanical
Max Horz 5=59(LC 13)
Max Uplift5=-32(LC 16), 3=-34(LC 16), 4=-18(LC 13)
Max Grav 5=215(LC 22), 3=28(LC 2), 4=33(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 2-0-10 zone; cantilever left exposed ;
end vertical left exposed; porch left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 5, 34 lb uplift at joint 3
and 18 lb uplift at joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J08
Truss Type
Jack-Open
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:40 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-tZQiZmvdbuq4Q2Bg2_JEp?nSubQwRBgpLHDbi_zWJSf
Scale = 1:15.1
W1
T1
B1
1
2
5
3
4
2x4
2x4
1-7-15
1-7-15
-0-10-4
0-10-4
1-7-15
1-7-15
1-1-14
2-4-13
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.12
0.07
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
-0.01
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 7 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 1-7-15 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=121/0-6-0 (min. 0-1-8), 3=24/Mechanical, 4=12/Mechanical
Max Horz 5=59(LC 13)
Max Uplift3=-45(LC 16), 4=-12(LC 16)
Max Grav 5=140(LC 2), 3=41(LC 30), 4=27(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 45 lb uplift at joint 3 and 12 lb uplift at
joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J09
Truss Type
Diagonal Hip Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:41 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Ml_5m6wFMCyx2CmschqTLDJaR?kMAewzZwy8EQzWJSe
Scale = 1:20.8
W1
T1
B1
B2
B3
1
2
3
8
7
6
9
10
11
4
12 13
5
1.5x4
3x4
1.5x4
2x4
3x4
4-3-13
4-3-13
5-4-12
1-0-15
-1-6-8
1-6-8
4-3-13
4-3-13
5-4-12
1-0-15
1-1-14
3-4-13
2-4-13
3-0-6
1-0-0
4.99 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.27
0.18
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
-0.03
-0.02
(loc)
7
7-8
4
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 19 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-4-12 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 8=185/0-9-11 (min. 0-1-8), 4=80/Mechanical, 5=73/Mechanical
Max Horz 8=86(LC 16)
Max Uplift8=-107(LC 16), 4=-42(LC 12), 5=-50(LC 16)
Max Grav 8=212(LC 2), 4=91(LC 2), 5=80(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 107 lb uplift at joint 8, 42 lb uplift at joint
4 and 50 lb uplift at joint 5.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 85 lb down and 17 lb up at
1-11-0, and 75 lb down and 37 lb up at 3-0-13 on top chord, and 5 lb down and 11 lb up at 1-11-0, and 13 lb down and 20 lb up at
3-0-13 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
10) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-51
Concentrated Loads (lb)
Vert: 12=1(B) 13=0(F)
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J09
Truss Type
Diagonal Hip Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:41 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-Ml_5m6wFMCyx2CmschqTLDJaR?kMAewzZwy8EQzWJSe
LOAD CASE(S) Standard
Trapezoidal Loads (plf)
Vert: 2=-2(F=24, B=24)-to-4=-69(F=-9, B=-9), 8=0(F=10, B=10)-to-7=-21(F=-0, B=-0), 6=-21(F=-0, B=-0)-to-5=-27(F=-3, B=-3)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J10
Truss Type
Jack-Open
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:42 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-qxYT_Sxt7W4ngML2APLiuQsnxP6fv5A6oaihnszWJSd
Scale = 1:12.6
W1
T1
B1
1
2
5
3
4
1.5x4
2x4
1-8-4
1-8-4
-1-2-12
1-2-12
1-8-4
1-8-4
1-1-0
1-11-2
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.15
0.05
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
-0.00
-0.00
(loc)
5
5
3
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 7 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 1-8-4 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=155/0-6-0 (min. 0-1-8), 3=15/Mechanical, 4=8/Mechanical
Max Horz 5=51(LC 13)
Max Uplift5=-29(LC 16), 3=-27(LC 16), 4=-3(LC 13)
Max Grav 5=193(LC 22), 3=18(LC 30), 4=26(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 29 lb uplift at joint 5, 27 lb uplift at joint 3
and 3 lb uplift at joint 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J11
Truss Type
Jack-Open
Qty
7
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:43 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-I86rBnyVupCeHVwFj6sxRePx0oPWeYQF1ERFJJzWJSc
Scale = 1:20.2
W1
T1
B1
B2 B3
1
2
3
8
7
6
9
10
4
5
1.5x4
2x4
1.5x4
3x4
3x4
2-6-0
2-6-0
4-9-0
2-3-0
-1-2-12
1-2-12
2-6-0
2-6-0
4-9-0
2-3-0
1-1-0
3-5-8
2-5-8
3-0-13
1-0-0
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.20
0.20
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.04
-0.06
0.02
(loc)
6
7
5
l/defl
>999
>975
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 16 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-9-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 8=241/0-6-0 (min. 0-1-8), 4=94/Mechanical, 5=56/Mechanical
Max Horz 8=105(LC 16)
Max Uplift8=-32(LC 16), 4=-62(LC 16), 5=-13(LC 16)
Max Grav 8=277(LC 2), 4=108(LC 2), 5=73(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-2-12 to 1-9-4, Interior(1) 1-9-4 to 4-8-4 zone; cantilever left exposed ;
end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 8, 62 lb uplift at joint 4
and 13 lb uplift at joint 5.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
J12
Truss Type
Jack-Open
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:44 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-mKgDO7y7f7KVvfVRHqOAzrx4_Cl3N?gPFuBorlzWJSb
Scale = 1:20.2
W1
T1
B1
1
2
5
6
7
3
4
3x4
1.5x4
4-9-0
4-9-0
-1-2-12
1-2-12
4-9-0
4-9-0
1-1-0
3-5-8
3-0-13
3-5-8
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MR
0.37
0.25
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.03
-0.06
-0.04
(loc)
4-5
4-5
3
l/defl
>999
>908
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 14 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-9-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 5=241/0-6-0 (min. 0-1-8), 3=101/Mechanical, 4=49/Mechanical
Max Horz 5=105(LC 16)
Max Uplift5=-32(LC 16), 3=-83(LC 16)
Max Grav 5=277(LC 2), 3=119(LC 2), 4=85(LC 7)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-2-12 to 1-9-4, Interior(1) 1-9-4 to 4-8-4 zone; cantilever left exposed ;
end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Refer to girder(s) for truss to truss connections.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 5 and 83 lb uplift at
joint 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB01
Truss Type
Piggyback
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:45 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-EWEbcTzlQRSMXp4drXvPW3UJUc5o6SwYUYwMNBzWJSa
Scale = 1:15.2
T1 T1
B11
2
3
4 5
3x4
2x4 2x4
5-10-0
5-10-0
2-11-0
2-11-0
5-10-0
2-11-0
0-4-10
2-2-4
0-1-10
0-4-10
0-1-10
9.00 12
Plate Offsets (X,Y)-- [3:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.07
0.21
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 14 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-10-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 2=180/4-5-5 (min. 0-1-8), 4=180/4-5-5 (min. 0-1-8)
Max Horz 2=-52(LC 14)
Max Uplift2=-32(LC 16), 4=-32(LC 17)
Max Grav 2=204(LC 2), 4=204(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Gable requires continuous bottom chord bearing.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 32 lb uplift at joint 2 and 32 lb uplift at
joint 4.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
10) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB01GE
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:46 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-ijn_pp_NBkaD8zfqPFQe2G1UD0UirvpijCgvwdzWJSZ
Scale = 1:15.2
T1 T1
B1
ST1
1
2
3
4 5
6
4x4
2x4 2x41.5x4
5-10-0
5-10-0
2-11-0
2-11-0
5-10-0
2-11-0
0-4-10
2-2-4
0-1-10
0-4-10
0-1-10
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.07
0.04
0.02
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.00
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 15 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-10-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 2=111/4-5-5 (min. 0-1-8), 4=111/4-5-5 (min. 0-1-8), 6=138/4-5-5 (min. 0-1-8)
Max Horz 2=52(LC 15)
Max Uplift2=-36(LC 16), 4=-43(LC 17)
Max Grav 2=128(LC 2), 4=128(LC 2), 6=153(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Gable requires continuous bottom chord bearing.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 36 lb uplift at joint 2 and 43 lb uplift at
joint 4.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
10) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB02
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:47 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-AvLM19?0y2i4m7E0yyxtbUZdjQnKaLBrysPSS4zWJSY
Scale = 1:48.6
0-1-14
0-1-14
T1
T2
T1
B1
ST1 ST1 ST1 ST1 ST1
T3
B212
3 4 5 6 7 8 9 10
11
12
18 17 16 15 14 13
19
3x6
3x6 3x6
3x4
3x6
3x4
27-2-0
27-2-0
3-6-0
3-6-0
23-8-0
20-2-0
27-2-0
3-6-0
0-4-3
1-5-8
1-9-0
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [3:0-3-0,Edge], [10:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.21
0.15
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.01
(loc)
12
12
11
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 67 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=26(LC 20)
Max Uplift All uplift 100 lb or less at joint(s) 2, 15, 17, 18, 14, 13, 11
Max Grav All reactions 250 lb or less at joint(s) except 2=307(LC 39), 15=430(LC 38), 17=429(LC 38),
18=419(LC 38), 14=429(LC 38), 13=419(LC 38), 11=307(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-273/91, 10-11=-273/93
WEBS 6-15=-347/114, 5-17=-355/120, 4-18=-320/111, 7-14=-355/120, 9-13=-320/110
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 7-8-15, Interior(1) 7-8-15 to 23-8-0, Exterior(2) 23-8-0 to 26-9-13
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 15, 17, 18, 14,
13, 11.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB03
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:49 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-7IT6Sr0GUfyo?QNO4NzLgvexaDTK2ET8PAuZWyzWJSW
Scale: 1/4"=1'0-1-14
0-1-14
T1
T2
T1
B1
ST2 ST2 ST1 ST2 ST1
B2 1 2
3 4 5 6 7 8 9
10
11
17 16 15 14 13 12
18
19
20 21 22 23
24
25
3x6
3x6
3x4
3x6
3x4
27-2-0
27-2-0
6-6-0
6-6-0
20-8-0
14-2-0
27-2-0
6-6-0
0-4-3
2-11-8
3-3-0
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [4:0-3-0,Edge], [8:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.32
0.18
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
11
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 76 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=53(LC 16)
Max Uplift All uplift 100 lb or less at joint(s) 2, 14, 16, 17, 13, 12, 10
Max Grav All reactions 250 lb or less at joint(s) 2, 10 except 14=435(LC 38), 16=420(LC 38), 17=505(LC 39),
13=420(LC 38), 12=505(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 6-14=-352/117, 5-16=-347/115, 3-17=-380/156, 7-13=-347/116, 9-12=-380/156
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 6-6-0, Exterior(2) 6-6-0 to 24-10-15,
Interior(1) 24-10-15 to 26-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 14, 16, 17, 13,
12, 10.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB04
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:50 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-bU1UfB1uFz4fdaybe4UaD6B58dpongXHeqe73PzWJSV
Scale: 1/4"=1'0-1-14
0-1-14
T1
T2
T1
B1
ST2 ST2
ST1
ST2
ST1
B212
3
4 5 6
7
8 9
15 14 13 12 11 10
16
17
18 19
20
21
3x4
3x6
6x6
6x6
3x4
27-2-0
27-2-0
9-6-0
9-6-0
17-8-0
8-2-0
27-2-0
9-6-0
0-4-3
4-5-8
4-9-0
0-1-10
0-4-3
0-1-10
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.33
0.16
0.17
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 82 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=79(LC 20)
Max Uplift All uplift 100 lb or less at joint(s) 2, 12, 14, 11, 8 except 15=-142(LC 16), 10=-141(LC 17)
Max Grav All reactions 250 lb or less at joint(s) except 2=263(LC 39), 12=503(LC 38), 14=264(LC 38),
15=552(LC 39), 11=264(LC 38), 10=552(LC 39), 8=263(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 5-12=-419/139, 3-15=-430/185, 7-10=-430/184
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 9-6-0, Exterior(2) 9-6-0 to 21-10-15,
Interior(1) 21-10-15 to 26-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 12, 14, 11, 8
except (jt=lb) 15=142, 10=141.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB05
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:51 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3gbttX2W0HCWFkXnBo0plKkHU19bW7IRsUNgbrzWJSU
Scale: 1/4"=1'0-1-14
0-1-14
T1
T2
T1
B1
ST3
ST2
ST1
ST2
ST1
B2 1 2
3
4
5 6 7
8
9
10
11
17 16 15 14 13 12
18
19
20
21 22
23
24
25
3x6
3x6
3x4
3x6
3x4
27-2-0
27-2-0
12-6-0
12-6-0
14-8-0
2-2-0
27-2-0
12-6-0
0-4-3
5-11-8
6-3-0
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [5:0-3-0,Edge], [7:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.29
0.19
0.14
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.01
(loc)
11
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 85 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=-106(LC 21)
Max Uplift All uplift 100 lb or less at joint(s) 2, 16, 13, 10 except 17=-136(LC 16), 12=-136(LC 17)
Max Grav All reactions 250 lb or less at joint(s) except 2=276(LC 39), 14=282(LC 38), 16=381(LC 39),
17=537(LC 39), 13=381(LC 39), 12=537(LC 39), 10=276(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 4-16=-315/146, 3-17=-413/178, 8-13=-315/146, 9-12=-413/179
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 12-6-0, Exterior(2) 12-6-0 to 14-8-0,
Interior(1) 18-10-15 to 26-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 16, 13, 10
except (jt=lb) 17=136, 12=136.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB06
Truss Type
Piggyback
Qty
3
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:53 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-?3idHC3mXuTEU2hAJD2HqlpeGqrs_1HkKosnfjzWJSS
Scale = 1:46.6
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
B212
3
4
5
6
7
8 9
15 14 13 12 11 10
16
17
18 19
20
21
4x4
3x4
3x6
3x4
27-2-0
27-2-0
13-7-0
13-7-0
27-2-0
13-7-0
0-4-3
6-7-14
6-9-8
0-1-100-4-3
0-1-10
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.21
0.14
0.17
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 86 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=117(LC 20)
Max Uplift All uplift 100 lb or less at joint(s) 2, 8 except 14=-112(LC 16), 15=-132(LC 16), 11=-112(LC 17),
10=-131(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 2, 8 except 12=285(LC 2), 14=317(LC 34), 15=393(LC 2),
11=317(LC 35), 10=393(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 3-15=-279/174, 7-10=-279/174
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 13-7-0, Exterior(2) 13-7-0 to 16-7-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) All plates are 1.5x4 MT20 unless otherwise indicated.
7) Gable requires continuous bottom chord bearing.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 8 except (jt=lb)
14=112, 15=132, 11=112, 10=131.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
11) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB07
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:54 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-TFG?VY4PICb56CGMtwZWNyMp0EA5jUStZScKCAzWJSR
Scale = 1:47.3
T1 T1
B1
ST3
ST2
ST1
ST2
ST1
B212
3
4
5
6
7
8 9
15 14 13 12 11 10
16
17
18 19
20
21
4x8
3x4
3x6
3x4
27-2-0
27-2-0
13-5-4
13-5-4
13-8-12
0-3-8
27-2-0
13-5-4
0-4-3
6-8-10
0-1-10
0-4-3
0-1-10
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.21
0.14
0.17
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
9
9
8
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 86 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=-116(LC 21)
Max Uplift All uplift 100 lb or less at joint(s) 2, 8 except 14=-112(LC 16), 15=-132(LC 16), 11=-112(LC 17),
10=-131(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 2, 8 except 12=285(LC 2), 14=316(LC 34), 15=393(LC 2),
11=318(LC 35), 10=392(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 3-15=-279/174, 7-10=-278/174
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 13-6-10, Exterior(2) 13-6-10 to 16-6-10
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) All plates are 1.5x4 MT20 unless otherwise indicated.
7) Gable requires continuous bottom chord bearing.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 8 except (jt=lb)
14=112, 15=132, 11=112, 10=131.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
11) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB08
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:55 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-xRqNiu513VjxjLrYQe4lwAuy?eWyRxk1n6LtkczWJSQ
Scale: 1/4"=1'0-1-14
0-1-14
T1
T2
T1
B1
ST3 ST2
ST1
ST2
ST1
B2 1 2
3
4 5 6 7 8
9
10
11
17 16 15 14 13 12
18
19
20
21 22 23 24
25
26
27
3x6
3x6
3x4
3x6
3x4
27-2-0
27-2-0
10-5-4
10-5-4
16-8-12
6-3-8
27-2-0
10-5-4
0-4-3
4-11-2
5-2-10
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [5:0-3-0,Edge], [7:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.32
0.16
0.17
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.01
(loc)
11
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 83 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=-88(LC 17)
Max Uplift All uplift 100 lb or less at joint(s) 2, 14, 16, 13, 10 except 17=-143(LC 16), 12=-144(LC 17)
Max Grav All reactions 250 lb or less at joint(s) except 2=260(LC 39), 14=443(LC 38), 16=326(LC 39),
17=543(LC 39), 13=326(LC 39), 12=543(LC 39), 10=260(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 6-14=-359/112, 4-16=-260/101, 3-17=-421/186, 8-13=-260/101, 9-12=-421/188
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 10-5-4, Exterior(2) 10-5-4 to 20-11-11,
Interior(1) 20-11-11 to 26-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 14, 16, 13, 10
except (jt=lb) 17=143, 12=144.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB09
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:57 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-uqy87a6Hb7zfzf?xY26D?b_JuSCFvsGJFQq_oVzWJSO
Scale: 1/4"=1'0-1-14
0-1-14
T1
T2
T1
B1
ST2 ST2
ST1
ST2
ST1
B2 1 2
3
4 5 6 7 8
9
10
11
17 16 15 14 13 12
18
19 20
21
3x6
3x6
3x4
3x6
3x4
27-2-0
27-2-0
7-5-4
7-5-4
19-8-12
12-3-8
27-2-0
7-5-4
0-4-3
3-5-2
3-8-10
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [4:0-3-0,Edge], [8:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.30
0.17
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.02
0.00
(loc)
11
11
10
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 78 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=61(LC 16)
Max Uplift All uplift 100 lb or less at joint(s) 2, 14, 16, 13, 10 except 17=-113(LC 16), 12=-109(LC 17)
Max Grav All reactions 250 lb or less at joint(s) except 2=267(LC 39), 14=448(LC 38), 16=387(LC 38),
17=507(LC 39), 13=387(LC 38), 12=507(LC 39), 10=267(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 6-14=-365/123, 5-16=-314/100, 3-17=-383/162, 7-13=-314/100, 9-12=-383/164
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 7-5-4, Exterior(2) 7-5-4 to 23-11-11,
Interior(1) 23-11-11 to 26-9-13 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 14, 16, 13, 10
except (jt=lb) 17=113, 12=109.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
PB10
Truss Type
Piggyback
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:05:58 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-M0WW Lw7vMQ5WapZ76meSXoWVurYMeJtTT4aYLxzWJSN
Scale = 1:48.6
0-1-14
0-1-14
T1
T2
T1
B1
ST1ST1 ST1 ST1 ST1
T3
B212
3 4 5 6 7 8 9 10
11
12
18 17 16 15 14 13
19
20 21 22 23 24
3x6
3x6 3x6
3x4
3x6
3x4
27-2-0
27-2-0
4-5-4
4-5-4
22-8-12
18-3-8
27-2-0
4-5-4
0-4-3
1-11-2
2-2-10
0-1-10
0-4-3
0-1-10
6.00 12
Plate Offsets (X,Y)-- [3:0-3-0,Edge], [10:0-3-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.22
0.18
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.00
0.01
0.01
(loc)
12
12
11
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 70 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 25-2-14.
(lb) - Max Horz 2=35(LC 16)
Max Uplift All uplift 100 lb or less at joint(s) 2, 15, 17, 18, 14, 13, 11
Max Grav All reactions 250 lb or less at joint(s) except 2=342(LC 39), 15=429(LC 38), 17=432(LC 38),
18=398(LC 38), 14=432(LC 38), 13=398(LC 38), 11=342(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-19=-296/73, 11-24=-296/73
WEBS 6-15=-346/113, 5-17=-358/123, 4-18=-298/108, 7-14=-358/123, 9-13=-298/106
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-4-3 to 3-4-3, Interior(1) 3-4-3 to 4-5-4, Exterior(2) 4-5-4 to 26-9-13 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 15, 17, 18, 14,
13, 11.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
12) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building
designer.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T01
Truss Type
Common
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:00 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-IPeGlc99u2LEq7jWDBgwdDcppfAb68OmxO3ePpzWJSL
Scale = 1:62.1
T2 T2
B1
W5
W4 W3W4 W3
W1
W2
W1
W2
T1 T1
B2
1
2
3
4
5
6
7
8
9
15 14 13 12 11 10
16
17
18 19
20
21
3x6
4x4
3x6
3x6 3x6 3x8
3x5
4x4
3x5
4x4
4x4
3x6
4x4
5-11-4
5-11-4
11-7-0
5-7-12
17-2-12
5-7-12
23-2-0
5-11-4
-1-6-4
1-6-4
5-11-4
5-11-4
11-7-0
5-7-12
17-2-12
5-7-12
23-2-0
5-11-4
24-8-4
1-6-4
1-7-14
10-4-2
1-7-14
9.00 12
Plate Offsets (X,Y)-- [2:0-1-0,0-1-12], [8:0-1-0,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.38
0.32
0.40
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.09
0.02
(loc)
10-11
14-15
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 123 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W5,W4: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-6-4 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 5-12
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=894/0-4-0 (min. 0-1-11), 10=894/0-4-0 (min. 0-1-11)
Max Horz 15=312(LC 15)
Max Uplift15=-144(LC 16), 10=-144(LC 17)
Max Grav 15=1015(LC 2), 10=1015(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-16=-989/651, 3-16=-888/688, 3-4=-771/584, 4-17=-676/599, 17-18=-671/602,
5-18=-669/621, 5-19=-669/621, 19-20=-671/602, 6-20=-676/599, 6-7=-771/584,
7-21=-888/688, 8-21=-989/651, 2-15=-960/635, 8-10=-960/635
BOT CHORD 14-15=-295/323, 13-14=-425/711, 12-13=-425/711, 11-12=-413/711
WEBS 5-12=-598/541, 7-12=-326/296, 3-12=-326/296, 2-14=-373/662, 8-11=-374/662
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-6-4 to 1-5-12, Interior(1) 1-5-12 to 11-7-0, Exterior(2) 11-7-0 to 14-7-0
zone; cantilever left and right exposed ; end vertical left and right exposed; porch left and right exposed;C-C for members and forces
& MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
15=144, 10=144.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T01GE
Truss Type
Common Supported Gable
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:01 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-mbBfzxAofLT5SGIinuB99R8zP3YcrfwvA2oCxGzWJSK
Scale = 1:65.3
W4
T2 T2
W4
B1
ST6
ST5
ST4
ST3
ST2
ST1
ST5
ST4
ST3
ST2
ST1
W1
W1
W2
T1 T1
B2
1
2
3
4
5
6 7
8
9
10
11
12
13
14
15
16
17
31 30 29 28 27 26 25 24 23 22 21 20 19 18
38 39
3x4
3x8
3x6
4x6
3x6
3x4
3x8
3x6
2x42x4 2x4
2x4 2x4
2x4
2x4
3-8-84-0-0
11-7-0
11-7-0
23-2-0
11-7-0
-1-6-4
1-6-4
11-7-0
11-7-0
23-2-0
11-7-0
24-8-4
1-6-4
1-7-14
10-4-2
1-7-14
9.00 12
Plate Offsets (X,Y)-- [18:Edge,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-R
0.39
0.21
0.19
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.02
-0.04
0.01
(loc)
17
17
18
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 144 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
OTHERS 2x4 SPF Stud *Except*
ST5: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 8-25, 10-23
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 23-2-0.
(lb) - Max Horz 31=-312(LC 14)
Max Uplift All uplift 100 lb or less at joint(s) 28, 29, 21, 20 except 31=-152(LC 12),
18=-136(LC 13), 26=-142(LC 16), 30=-308(LC 16), 22=-144(LC 17), 19=-303(LC
17)
Max Grav All reactions 250 lb or less at joint(s) 25, 26, 28, 29, 23, 22, 21, 20, 24
except 31=356(LC 31), 18=343(LC 30), 30=274(LC 14), 19=262(LC 15)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-31=-267/108, 2-3=-255/176, 16-18=-258/97
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3) -1-6-4 to 1-7-0, Exterior(2) 1-7-0 to 11-7-0, Corner(3) 11-7-0 to 14-7-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
5) Unbalanced snow loads have been considered for this design.
6) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
7) All plates are 1.5x4 MT20 unless otherwise indicated.
8) Gable requires continuous bottom chord bearing.
9) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web).
10) Vertical gable studs spaced at 2-0-0 oc and horizontal gable studs spaced at 4-3-8 oc.
11) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
12) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 28, 29, 21, 20
except (jt=lb) 31=152, 18=136, 26=142, 30=308, 22=144, 19=303.
13) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T02
Truss Type
Common
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:02 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Eol1AHAQQfby3QtuLciOieh9NTs7a2r2OiYlUizWJSJ
Scale = 1:62.1
T1
T2
B1
W3 W4
W5
W4 W3
W1
W2
W7
W6
T3
B2
1
2
3
4
5
6
7
13 12 11 10 9 8
14
15
16 17
18
193x6
4x4
3x6
3x6 3x6
3x5
3x4
3x8
3x5
4x4 3x6
4x4
5-5-4
5-5-4
11-1-0
5-7-12
16-8-12
5-7-12
22-8-0
5-11-4
5-5-4
5-5-4
11-1-0
5-7-12
16-8-12
5-7-12
22-8-0
5-11-4
24-2-4
1-6-4
2-0-6
10-4-2
1-7-14
9.00 12
Plate Offsets (X,Y)-- [6:0-1-0,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.38
0.32
0.40
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.09
0.02
(loc)
8-9
8-9
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 120 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W4,W5: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-7-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 3-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 13=789/0-6-0 (min. 0-1-8), 8=880/0-4-0 (min. 0-1-10)
Max Horz 13=-306(LC 12)
Max Uplift13=-101(LC 16), 8=-142(LC 17)
Max Grav 13=891(LC 2), 8=999(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-14=-909/617, 2-14=-737/638, 2-15=-749/572, 15-16=-649/589, 3-16=-648/608,
3-17=-645/605, 17-18=-648/586, 4-18=-654/584, 4-5=-748/569, 5-19=-868/676,
6-19=-969/638, 1-13=-842/566, 6-8=-944/625
BOT CHORD 12-13=-275/300, 11-12=-387/662, 10-11=-387/662, 9-10=-403/695
WEBS 2-10=-287/259, 3-10=-584/516, 5-10=-329/300, 1-12=-422/651, 6-9=-363/645
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 11-1-0, Exterior(2) 11-1-0 to 14-1-0
zone; cantilever left and right exposed ; end vertical left and right exposed; porch left and right exposed;C-C for members and forces
& MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
13=101, 8=142.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T03
Truss Type
Piggyback Base
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:03 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-i_JPOdB2BzjphaS5uJDdEsED_sBGJToCdMHJ08zWJSI
Scale = 1:69.3
T1
T2
T3
B1
W3
W4
W5
W6
W3
W7
W8
W1
W2
W10
W9
T4
B2
1
2 3 4
5
6
7 8
15 14 13 12 11 10 9
16 17 18
19
20
21
22
5x6 5x6
3x10 MT18H
1.5x4 3x6 3x4
3x8
1.5x4
3x4
3x5
4x4
3x5
3x4
5x6
3-8-8
3-8-8
6-3-0
2-6-8
9-6-8
3-3-8
16-3-8
6-9-0
23-4-0
7-0-8
3-8-8
3-8-8
6-3-0
2-6-8
9-6-8
3-3-8
16-3-8
6-9-0
23-4-0
7-0-8
24-2-4
0-10-4
8-8-10
11-6-0
1-1-14
11-6-0
9.00 12
Plate Offsets (X,Y)-- [2:0-3-12,0-1-12], [4:0-4-0,0-1-12], [7:0-2-12,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.77
0.39
0.55
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.14
0.01
(loc)
9-10
9-10
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 171 lb FT = 20%
GRIP
185/144
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8,W10,W9: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-10-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
6-0-0 oc bracing: 13-14.
WEBS 1 Row at midpt 2-13, 3-13, 4-13, 6-11, 1-15, 1-14
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=117/0-6-0 (min. 0-1-8), 13=1006/0-6-0 (min. 0-2-0), 9=617/0-6-0 (min. 0-1-8)
Max Horz 15=-369(LC 17)
Max Uplift15=-64(LC 12), 13=-140(LC 17), 9=-62(LC 17)
Max Grav 15=188(LC 41), 13=1203(LC 39), 9=792(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 6-20=-403/73, 6-21=-610/61, 21-22=-757/34, 7-22=-858/25, 7-9=-729/121
BOT CHORD 14-15=-288/369, 13-14=-289/362, 12-13=-154/293, 11-12=-154/293, 10-11=0/606,
9-10=-122/285
WEBS 2-13=-341/87, 3-13=-313/104, 4-13=-816/214, 4-11=-117/530, 6-11=-638/271,
6-10=0/269, 7-10=0/417
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 3-8-8, Exterior(2) 3-8-8 to 13-9-7,
Interior(1) 13-9-7 to 24-2-4 zone; cantilever right exposed ; end vertical right exposed; porch left exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are MT20 plates unless otherwise indicated.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 9 except
(jt=lb) 13=140.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T03GE
Truss Type
GABLE COMMON
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:05 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-fNR9pJDIjazXwucT0kG5KHJYUgtknNHV4fmP51zWJSG
Scale = 1:70.3
T1
T2
T3
B1
W3
W4
W5
W6
W3
W7
W8
W1
W2
W10
W9
ST6
ST4
ST5
ST3
ST1
ST2
ST7
ST8 ST9
T4
B2
1
2 3 4
5
6
78
15 14 13 12 11 10 9
30 31 32
33
34
35
36
5x6 5x6
3x10 MT18H
1.5x4 3x63x4
3x8
1.5x4
3x4
3x5
4x4
4x8
3x4
5x6
3x4
3x4
3x4
3x4
3-8-8
3-8-8
6-3-0
2-6-8
9-6-8
3-3-8
16-3-8
6-9-0
23-4-0
7-0-8
3-8-8
3-8-8
6-3-0
2-6-8
9-6-8
3-3-8
16-3-8
6-9-0
23-4-0
7-0-8
24-2-4
0-10-4
8-8-10
11-6-0
1-1-14
11-6-0
9.00 12
Plate Offsets (X,Y)-- [1:0-0-8,0-0-0], [2:0-3-12,0-1-12], [4:0-4-0,0-1-12], [7:0-2-12,0-1-8], [23:0-2-0,0-2-5]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.77
0.39
0.55
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.06
-0.14
0.01
(loc)
9-10
9-10
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 236 lb FT = 20%
GRIP
185/144
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8,W10,W9: 2x4 SPF Stud
OTHERS 2x4 SPF Stud *Except*
ST6,ST3,ST2,ST8: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-10-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
6-0-0 oc bracing: 13-14.
WEBS 1 Row at midpt 2-13, 3-13, 4-13, 6-11, 1-15, 1-14
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=117/0-6-0 (min. 0-1-8), 13=1006/0-6-0 (min. 0-2-0), 9=617/0-6-0 (min. 0-1-8)
Max Horz 15=-369(LC 17)
Max Uplift15=-64(LC 12), 13=-140(LC 17), 9=-62(LC 17)
Max Grav 15=188(LC 41), 13=1203(LC 39), 9=792(LC 39)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 6-34=-403/73, 6-35=-610/61, 35-36=-757/34, 7-36=-858/25, 7-9=-729/121
BOT CHORD 14-15=-288/369, 13-14=-289/362, 12-13=-154/293, 11-12=-154/293, 10-11=0/606,
9-10=-122/285
WEBS 2-13=-341/87, 3-13=-313/104, 4-13=-816/214, 4-11=-117/530, 6-11=-638/271,
6-10=0/269, 7-10=0/417
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 3-8-8, Exterior(2) 3-8-8 to 13-9-7,
Interior(1) 13-9-7 to 24-2-4 zone; cantilever right exposed ; end vertical right exposed; porch left exposed;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
5) Unbalanced snow loads have been considered for this design.
6) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
7) Provide adequate drainage to prevent water ponding.
8) All plates are MT20 plates unless otherwise indicated.
9) All plates are 2x4 MT20 unless otherwise indicated.
10) Gable studs spaced at 2-0-0 oc.
11) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
12) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 9 except
(jt=lb)13=140.Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T03GE
Truss Type
GABLE COMMON
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:05 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-fNR9pJDIjazXwucT0kG5KHJYUgtknNHV4fmP51zWJSG
NOTES-
13) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T04
Truss Type
Piggyback Base Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:07 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-blZwD?EYEBEEABls79IZPiOsdUYyFABoYzFW9vzWJSE
Scale = 1:70.6
W1
T1
T2
B1
W2 W3 W4
W5
W6 W7
W9W8
T3
B2
1 2
3
4
5
67
13 12 11 10 9 8
14
15 16 17 18 19 20
3x10 MT18H
6x6 4x4
3x6
6x8 10x10
5x6
10x10
4x6
8x8 5x6
4x8
3-6-8
3-6-8
8-0-8
4-6-0
12-6-8
4-6-0
17-4-0
4-9-8
3-6-8
3-6-8
8-0-8
4-6-0
12-6-8
4-6-0
17-4-0
4-9-8
18-2-4
0-10-4
11-6-0
1-1-14
11-6-0
9.00 12
Plate Offsets (X,Y)-- [1:0-2-0,0-2-4], [3:0-1-4,0-2-0], [6:0-3-0,0-1-12], [9:0-3-8,0-5-4], [10:0-3-8,0-6-4], [12:0-3-12,0-5-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.92
0.41
0.91
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.12
-0.27
0.02
(loc)
9-10
9-10
8
l/defl
>999
>764
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 310 lb FT = 20%
GRIP
185/144
244/190
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x8 SP 2400F 2.0E
WEBS 2x4 HF/SPF No.2 *Except*
W1: 2x4 SP 2250F 1.9E, W6,W7: 2x4 SPF Stud
W9: 2x4 SP 2400F 2.0E
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-9-10 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 1-13, 3-12
REACTIONS. (lb/size) 13=8435/0-6-0 (min. 0-3-9), 8=5886/0-6-0 (min. 0-1-8)
Max Horz 13=-434(LC 50)
Max Uplift13=-1654(LC 13), 8=-1691(LC 13)
Max Grav 13=8562(LC 32), 8=6083(LC 32)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-13=-6747/1445, 1-2=-1981/424, 2-3=-2618/468, 3-4=-5816/1273, 4-5=-6023/1255,
5-14=-7820/2195, 6-14=-7943/2165, 6-8=-5815/1628
BOT CHORD 13-15=-182/438, 15-16=-182/438, 12-16=-182/438, 12-17=-929/4755, 17-18=-929/4755,
11-18=-929/4755, 10-11=-929/4755, 10-19=-1650/6278, 19-20=-1650/6278,
9-20=-1650/6278, 8-9=-325/955
WEBS 1-12=-1493/6979, 2-12=-270/1304, 3-12=-5370/1535, 3-10=-1645/6157, 5-10=-2156/1193,
5-9=-1257/2459, 6-9=-1428/5405
NOTES-
1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc.
Bottom chords connected as follows: 2x8 - 2 rows staggered at 0-4-0 oc.
Webs connected as follows: 2x4 - 1 row at 0-9-0 oc.
2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to
ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever right exposed ; end vertical right exposed; Lumber DOL=1.60 plate grip DOL=1.60
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
5) Unbalanced snow loads have been considered for this design.
6) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
7) Provide adequate drainage to prevent water ponding.
8) All plates are MT20 plates unless otherwise indicated.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Bearing at joint(s) 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify
capacity of bearing surface.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T04
Truss Type
Piggyback Base Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:07 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-blZwD?EYEBEEABls79IZPiOsdUYyFABoYzFW9vzWJSE
NOTES-
11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 13=1654, 8=1691.
12) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
13) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1708 lb down and 205 lb up at 0-6-4, 1702 lb down and 186 lb up at
2-6-4, 1721 lb down and 238 lb up at 4-6-4, 1776 lb down and 287 lb up at 6-6-4, 1854 lb down and 337 lb up at 8-6-4, and 1719 lb down and 396 lb up at 10-6-4, and
2747 lb down and 1500 lb up at 12-7-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-61, 2-6=-51, 6-7=-51, 8-13=-20
Concentrated Loads (lb)
Vert: 9=-2604(B) 15=-1694(B) 16=-1660(B) 17=-1721(B) 18=-1776(B) 19=-1854(B) 20=-1719(B)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T05GE
Truss Type
Half Hip Supported
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:08 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3x6IRLFB?VM5nLK2hspoxvxCKtzO_qTxnd?4hMzWJSD
Scale = 1:15.1
0-1-14
W1
T1
T2
B1
ST2ST1
1 2 3
4
5
8 7 6
9
10
11
1.5x4
1.5x4
4x4
2x41.5x4 1.5x4
1.5x4
6-5-12
6-5-12
3-0-0
3-0-0
6-5-12
3-5-12
7-8-8
1-2-12
2-0-0
2-1-14
0-5-0
2-0-0
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.22
0.07
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.01
0.01
0.00
(loc)
5
5
4
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 22 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 6-5-12.
(lb) - Max Horz 8=-80(LC 12)
Max Uplift All uplift 100 lb or less at joint(s) 4, 6, 7
Max Grav All reactions 250 lb or less at joint(s) 8, 6, 7 except 4=299(LC 36)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3) 0-1-12 to 6-0-0, Exterior(2) 6-0-0 to 7-8-8 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
5) Unbalanced snow loads have been considered for this design.
6) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
7) Provide adequate drainage to prevent water ponding.
8) Gable requires continuous bottom chord bearing.
9) Gable studs spaced at 2-0-0 oc.
10) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 6, 7.
12) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 4.
13) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T06
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:10 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-?KE2s0HRX6cp1fURpHrG1K0T9hYaSdlEExUAmEzWJSB
Scale = 1:40.2
0-1-14
W1
T1
T2B1
B3
B2
W2
W4
W3
W5 W6 W5 W6 W7
W8 W9
B4
1 2 3 4 5
6
7
8
17
16
15 14 13
12
11 10 9
21 22 23 24 25 26 27
28
29 30 31 32 33 34
6x6
1.5x4 6x6
4x4
2x4 3x65x84x8
3x4 3x4
3x4 3x4
3x4
1.5x4
3x5
1-0-0
1-0-0
5-5-8
4-5-8
10-0-12
4-7-4
14-6-4
4-5-8
17-5-4
2-11-0
21-0-0
3-6-12
1-0-0
1-0-0
5-5-8
4-5-8
10-0-12
4-7-4
14-6-4
4-5-8
17-5-4
2-11-0
21-0-0
3-6-12
23-2-12
2-2-12
2-6-0
3-7-14
0-5-0
1-0-0
6.00 12
Plate Offsets (X,Y)-- [7:0-0-15,0-1-8], [16:0-6-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.52
0.54
0.54
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.09
-0.15
0.04
(loc)
10-11
10-11
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 98 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B3: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-0-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-5-10 oc bracing. Except:
10-0-0 oc bracing: 14-16
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=838/0-6-0 (min. 0-1-14), 7=908/0-6-0 (min. 0-1-12)
Max Horz 17=-135(LC 8)
Max Uplift17=-557(LC 8), 7=-408(LC 13)
Max Grav 17=1150(LC 71), 7=1061(LC 32)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-21=-537/277, 21-22=-537/277, 3-22=-537/277, 3-23=-1427/709, 23-24=-1427/709,
4-24=-1427/709, 4-25=-1776/872, 25-26=-1775/871, 26-27=-1773/872, 5-27=-1773/872,
5-6=-1497/705, 6-28=-1467/654, 7-28=-1501/639
BOT CHORD 16-17=-200/582, 2-16=-344/770, 13-31=-772/1814, 12-31=-772/1814, 12-32=-772/1814,
11-32=-772/1814, 11-33=-552/1380, 33-34=-552/1380, 10-34=-552/1380, 9-10=-505/1335,
7-9=-505/1335
WEBS 2-17=-1157/584, 13-16=-586/1354, 3-16=-994/520, 4-13=-426/198, 5-11=-303/551
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=557, 7=408.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T06
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:10 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-?KE2s0HRX6cp1fURpHrG1K0T9hYaSdlEExUAmEzWJSB
NOTES-
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 85 lb down and 68 lb up at 1-0-12, 84 lb down and 69 lb up at 2-5-8,
84 lb down and 69 lb up at 4-5-8, 84 lb down and 69 lb up at 6-5-8, 84 lb down and 69 lb up at 8-5-8, 84 lb down and 69 lb up at 10-5-8, and 84 lb down and 69 lb up at
12-5-8, and 77 lb down and 69 lb up at 14-6-4 on top chord, and 39 lb down and 39 lb up at 1-1-12, 39 lb down and 39 lb up at 2-5-8, 39 lb down and 39 lb up at 4-5-8,
39 lb down and 39 lb up at 6-5-8, 39 lb down and 39 lb up at 8-5-8, 39 lb down and 39 lb up at 10-5-8, and 39 lb down and 39 lb up at 12-5-8, and 39 lb down and 39 lb
up at 14-5-8 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-5=-61, 5-8=-51, 16-17=-20, 14-15=-20, 14-18=-20
Concentrated Loads (lb)
Vert: 16=0(F) 10=0(F) 29=0(F) 30=0(F) 31=0(F) 32=0(F) 33=0(F) 34=0(F)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T07
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:11 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-TWoQ3MH3IQkgep3dM?NVZYZds5s4B2YNTbDkIhzWJSA
Scale = 1:43.3
0-1-14
W1
T1
T2
B1
B3
B2
W2
W4
W3
W5
W6
W7
W8 W9
W10
W11
B4
1 2 3 4
5
6
7
8
17
16
15 14 13
12
11 10 9
21 22 23
24
25
3x4
1.5x4 6x6
4x6
3x4 3x65x8
4x10
3x4
3x5
3x4
4x4
3x4
1.5x4
5x6
1-0-0
1-0-0
6-3-2
5-3-2
11-6-4
5-3-2
15-7-2
4-0-14
19-8-0
4-0-14
21-0-0
1-4-0
1-0-0
1-0-0
6-3-2
5-3-2
11-6-4
5-3-2
15-7-2
4-0-14
19-8-0
4-0-14
21-0-0
1-4-0
23-2-12
2-2-12
4-0-0
5-1-14
0-5-0
1-0-0
5-0-0
6.00 12
Plate Offsets (X,Y)-- [7:Edge,0-1-1], [16:0-7-0,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.59
0.65
0.69
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.18
0.06
(loc)
11
11-13
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 118 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T2: 2x4 SP 2400F 2.0E
BOT CHORD 2x4 HF/SPF No.2 *Except*
B3: 2x4 SPF Stud, B4: 2x4 SP 2400F 2.0E
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-9-2 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 9-10-4 oc bracing. Except:
10-0-0 oc bracing: 14-16
WEBS 1 Row at midpt 3-16, 4-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=1348/0-6-0 (min. 0-2-7), 7=2229/0-6-0 (min. 0-2-0)
Max Horz 17=-197(LC 12)
Max Uplift17=-253(LC 12), 7=-448(LC 17)
Max Grav 17=1498(LC 35), 7=2416(LC 36)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-21=-386/127, 3-21=-386/127, 3-22=-1582/363, 22-23=-1579/363, 4-23=-1578/363,
4-24=-2377/555, 5-24=-2626/592, 5-6=-3783/828, 6-25=-3670/770, 7-25=-3690/767
BOT CHORD 16-17=-4/346, 2-16=-163/1046, 12-13=-330/2116, 11-12=-330/2116, 10-11=-632/3197,
9-10=-653/3317, 7-9=-653/3317
WEBS 2-17=-1423/314, 13-16=-197/1423, 3-16=-1462/374, 3-13=-72/572, 4-13=-998/249,
4-11=-156/913, 5-11=-1419/365, 6-9=-489/193
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 11-6-4, Exterior(2) 11-6-4 to 15-7-2
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=253, 7=448.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T07
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:11 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-TWoQ3MH3IQkgep3dM?NVZYZds5s4B2YNTbDkIhzWJSA
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-23=-61, 6-8=-51, 16-17=-20, 14-15=-20, 14-18=-20
Trapezoidal Loads (plf)
Vert: 23=-231-to-4=-238, 4=-228-to-6=-270
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T08
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:13 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-QvwBU2JJq1_Ou6D0UPPzezet_uUifuigwviqNZzWJS8
Scale = 1:52.1
0-1-14
W1
T1
T2
B1
B3
B2
W2
W4
W3
W5
W6
W7
W8
W9
W10
W11
T3
B4
HW2
1 2 3 4
5
6
7
8
9
18
17
16 15 14
13
12 11 10
22 23
24 25
26
3x5
2x4 6x6
3x6
4x6
2x4
3x64x8
4x10
3x4
4x6
3x4
4x4
3x4
1.5x4
6x6
1-0-0
1-0-0
4-9-2
3-9-2
8-6-4
3-9-2
14-1-2
5-6-14
19-8-0
5-6-14
21-0-0
1-4-0
1-0-0
1-0-0
4-9-2
3-9-2
8-6-4
3-9-2
14-1-2
5-6-14
19-8-0
5-6-14
21-0-0
1-4-0
23-2-12
2-2-12
5-6-0
6-7-14
0-5-0
1-0-0
6-6-0
6.00 12
Plate Offsets (X,Y)-- [8:0-2-0,Edge], [17:0-7-4,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.99
0.90
0.91
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.26
0.06
(loc)
10-11
10-11
8
l/defl
>999
>962
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 126 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T2: 2x4 SPF 1650F 1.5E, T3: 2x4 SP 2400F 2.0E
BOT CHORD 2x4 HF/SPF No.2 *Except*
B3: 2x4 SPF Stud, B4: 2x4 SPF 2100F 1.8E
WEBS 2x4 SPF Stud
WEDGE
Right: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied, except end verticals.
BOT CHORD Rigid ceiling directly applied or 9-6-2 oc bracing. Except:
10-0-0 oc bracing: 15-17
WEBS 1 Row at midpt 4-14, 6-12
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 18=1331/0-6-0 (min. 0-2-5), 8=2216/0-6-0 (min. 0-3-1)
Max Horz 18=-259(LC 12)
Max Uplift18=-241(LC 12), 8=-467(LC 17)
Max Grav 18=1404(LC 35), 8=2388(LC 36)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-22=-272/133, 22-23=-272/133, 3-23=-272/133, 3-4=-888/275, 4-24=-1463/355,
24-25=-1513/352, 5-25=-1555/356, 5-6=-1921/396, 6-7=-3730/720, 7-26=-4028/747,
8-26=-4053/744
BOT CHORD 17-18=-50/286, 2-17=-195/1047, 13-14=-98/1375, 12-13=-98/1375, 11-12=-512/3050,
10-11=-665/3749, 8-10=-665/3749
WEBS 2-18=-1239/310, 14-17=-66/819, 3-17=-1111/354, 3-14=-204/785, 4-14=-1058/271,
4-12=-210/1161, 6-12=-1972/490, 6-11=0/337, 7-11=-730/173, 7-10=-588/244
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 8-6-4, Exterior(2) 8-6-4 to 12-9-2
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
18=241, 8=467.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T08
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:13 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-QvwBU2JJq1_Ou6D0UPPzezet_uUifuigwviqNZzWJS8
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-4=-61, 4-24=-51, 7-9=-51, 17-18=-20, 15-16=-20, 15-19=-20
Trapezoidal Loads (plf)
Vert: 24=-221-to-7=-270
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T09
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:14 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-u5UZhOKxbL6FVGoC27wCBAB5dIrcORWq9ZSOv0zWJS7
Scale = 1:58.6
0-1-14
W1
T1
T2
B1
B3
B2
W2
W4
W3
W5 W6
W7 W8
W9
W10
W11
T3
B4
1 2 3
4
5
6
7
8
918
17
16 15 14
13
12 11 10
22 23 24 25
26
27
4x4
3x4 6x6
4x8
3x8
2x4
3x64x8
4x10
3x8
4x4
3x4
4x4
3x4
1.5x4
5x6
1-0-0
1-0-0
5-6-4
4-6-4
10-2-13
4-8-9
14-11-7
4-8-9
19-8-0
4-8-9
21-0-0
1-4-0
1-0-0
1-0-0
5-6-4
4-6-4
10-2-13
4-8-9
14-11-7
4-8-9
19-8-0
4-8-9
21-0-0
1-4-0
23-2-12
2-2-12
7-0-0
8-1-14
0-5-0
1-0-0
8-0-0
6.00 12
Plate Offsets (X,Y)-- [5:0-4-0,Edge], [8:0-0-12,Edge], [17:0-7-8,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.81
0.79
0.55
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.09
-0.23
0.05
(loc)
11
10-11
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 129 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T3: 2x4 SPF 2100F 1.8E
BOT CHORD 2x4 HF/SPF No.2 *Except*
B4: 2x4 SPF 2100F 1.8E
WEBS 2x4 SPF Stud *Except*
W3,W5: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-9-3 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
10-0-0 oc bracing: 15-17
WEBS 1 Row at midpt 2-18, 3-17, 4-14, 6-12
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 18=1300/0-6-0 (min. 0-2-3), 8=2195/0-6-0 (min. 0-3-0)
Max Horz 18=-322(LC 12)
Max Uplift18=-225(LC 12), 8=-473(LC 17)
Max Grav 18=1343(LC 2), 8=2338(LC 36)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 3-24=-935/284, 24-25=-1058/262, 4-25=-1077/262, 4-5=-2118/417, 5-6=-2423/448,
6-26=-3603/656, 7-26=-3873/690, 7-27=-3882/684, 8-27=-3896/681
BOT CHORD 17-18=-116/330, 2-17=-211/1066, 13-14=-159/1895, 12-13=-159/1895, 11-12=-479/3263,
10-11=-584/3546, 8-10=-584/3546
WEBS 2-18=-1204/341, 14-17=-14/754, 3-17=-1193/380, 3-14=-274/1200, 4-14=-1627/393,
4-12=-155/995, 6-12=-1655/384, 6-11=0/273, 7-11=-343/121, 7-10=-513/215
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-6-4, Exterior(2) 5-6-4 to 9-9-2 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
18=225, 8=473.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T09
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:15 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-MI2xvkKaMfE67QNObqRRkOjGNiBr7umzODBxRSzWJS6
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-3=-61, 3-4=-51, 7-9=-51, 17-18=-20, 15-16=-20, 15-19=-20
Trapezoidal Loads (plf)
Vert: 4=-221-to-7=-270
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T10
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:16 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-qUbJ64LC7yMzlayb9YygGbGPy6VEsJh6ctxVzuzWJS5
Scale = 1:65.5
0-1-14
W1
T1
T2
B1
B3
B2
W2
W4
W3
W5 W6
W7
W8
W9
W10
W 11
T3
B4 HW 2
1 2 3
4
5
6
7
8
918
17
16 15 14 13
12
11 10
22
23
24
25
3x4
1.5x4 6x6
3x10 MT18H
4x6
1.5x4
4x6
4x8
4x8
3x8
4x6
3x4
4x4
3x4
1.5x4
6x6
1-0-0
1-0-0
2-6-4
1-6-4
8-2-13
5-8-9
13-11-7
5-8-9
19-8-0
5-8-9
21-0-0
1-4-0
1-0-0
1-0-0
2-6-4
1-6-4
8-2-13
5-8-9
13-11-7
5-8-9
19-8-0
5-8-9
21-0-0
1-4-0
23-2-12
2-2-12
8-6-0
9-7-14
0-5-0
1-0-0
9-6-0
6.00 12
Plate Offsets (X,Y)-- [8:0-2-4,Edge], [17:0-6-4,0-2-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.95
0.91
0.70
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.28
0.04
(loc)
10-11
10-11
8
l/defl
>999
>887
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 145 lb FT = 20%
GRIP
185/144
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T3: 2x4 SP 2250F 1.9E
BOT CHORD 2x4 HF/SPF No.2 *Except*
B4: 2x4 SPF 2100F 1.8E
WEBS 2x4 SPF Stud *Except*
W1,W2,W3,W5,W6: 2x4 HF/SPF No.2
WEDGE
Right: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-8-10 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 8-11-7 oc bracing. Except:
10-0-0 oc bracing: 15-17
WEBS 1 Row at midpt 1-18, 2-18, 3-17, 4-14, 6-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 18=1286/0-6-0 (min. 0-2-6), 8=2201/0-6-0 (min. 0-2-15)
Max Horz 18=-411(LC 17)
Max Uplift18=-297(LC 17), 8=-442(LC 17)
Max Grav 18=1448(LC 36), 8=2304(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 3-22=-426/102, 4-22=-559/75, 4-23=-1527/253, 5-23=-1634/253, 5-6=-1972/286,
6-24=-3019/507, 7-24=-3651/607, 7-25=-3870/686, 8-25=-3887/683
BOT CHORD 17-18=-77/386, 2-17=-305/1308, 13-14=-27/1461, 12-13=-403/3006, 11-12=-403/3006,
10-11=-628/3568, 8-10=-628/3568
WEBS 2-18=-1208/298, 14-17=0/505, 3-17=-1200/489, 3-14=-425/1112, 4-14=-1656/413,
4-13=-177/1096, 6-13=-1837/455, 6-11=0/344, 7-11=-703/227, 7-10=-601/251
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 6-9-2, Interior(1) 6-9-2 to 23-2-12 zone; cantilever right exposed ;
end vertical right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) All plates are MT20 plates unless otherwise indicated.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
18=297, 8=442.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) StandardContinuedon page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T10
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:16 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-qUbJ64LC7yMzlayb9YygGbGPy6VEsJh6ctxVzuzWJS5
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-3=-61, 3-23=-51, 7-9=-51, 17-18=-20, 15-16=-20, 15-19=-20
Trapezoidal Loads (plf)
Vert: 23=-221-to-7=-270
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T11
Truss Type
Jack-Closed
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:17 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Ig9iKQMquGUqMkWnjFTvpppe2WsRbjtGrXg2WKzWJS4
Scale = 1:68.6
W1
T1
B1
B3
B2
W2
W4
W3
W5 W6
W7
W8
W9
W10
W11
T2
B4 HW2
1 2
3
4
5
6
7
817
16
15 14 13
12
11 10 9
21
22
23
24
3x4
1.5x4 3x8
2x4
3x6
4x8
4x10
3x8
6x8
4x4
3x4
4x4
3x4
1.5x4
6x6
1-0-0
1-0-0
5-8-0
4-8-0
10-9-8
5-1-8
15-0-0
4-2-9
19-8-0
4-8-0
21-0-0
1-4-0
1-0-0
1-0-0
5-8-0
4-8-0
10-9-8
5-1-8
15-0-0
4-2-9
19-8-0
4-8-0
21-0-0
1-4-0
23-2-12
2-2-12
9-11-0
10-11-0
0-5-0
1-0-0
6.00 12
Plate Offsets (X,Y)-- [4:0-3-0,0-3-4], [7:0-2-0,Edge], [16:0-8-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.67
0.84
0.89
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.09
-0.24
0.05
(loc)
9-10
9-10
7
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 144 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T2: 2x4 SP 2400F 2.0E
BOT CHORD 2x4 HF/SPF No.2 *Except*
B4: 2x4 SPF 2100F 1.8E
WEBS 2x4 SPF Stud *Except*
W1,W2,W3,W5: 2x4 HF/SPF No.2
WEDGE
Right: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-3-14 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 9-10-6 oc bracing. Except:
10-0-0 oc bracing: 14-16
WEBS 1 Row at midpt 1-17, 2-17, 3-16, 4-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=1265/0-6-0 (min. 0-2-6), 7=2199/0-6-0 (min. 0-3-3)
Max Horz 17=-464(LC 17)
Max Uplift17=-375(LC 17), 7=-461(LC 17)
Max Grav 17=1427(LC 2), 7=2490(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 3-23=-992/151, 4-23=-1137/138, 4-5=-2595/405, 5-6=-4011/672, 6-24=-4060/704,
7-24=-4080/701
BOT CHORD 16-17=-107/436, 2-16=-239/1103, 12-13=-161/2102, 11-12=-161/2102, 10-11=-470/3329,
9-10=-620/3691, 7-9=-620/3691
WEBS 2-17=-1229/357, 13-16=0/723, 3-16=-1317/443, 3-13=-285/1150, 4-13=-1710/433,
4-11=-174/1008, 5-11=-1565/392, 5-10=0/271, 6-10=-367/151, 6-9=-560/207
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-4-10, Interior(1) 4-4-10 to 23-2-12 zone; cantilever right
exposed ; end vertical right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=375, 7=461.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T11
Truss Type
Jack-Closed
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:17 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-Ig9iKQMquGUqMkWnjFTvpppe2WsRbjtGrXg2WKzWJS4
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-23=-51, 6-8=-51, 16-17=-20, 14-15=-20, 14-18=-20
Trapezoidal Loads (plf)
Vert: 23=-221-to-6=-270
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T12
Truss Type
JACK-CLOSED
Qty
3
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:18 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-mtj4XlNSfach_u5zHz?8L0LsovJAKEGP4BQb2nzWJS3
Scale = 1:67.2
W1
T1
B1
B3
B2
W2
W4
W3
W5
W6 W7
T2
B4
1 2
3
4
5
6 714
13
12 11
10
9 8
18 19
20
3x4
1.5x4
3x6
3x6
4x4
3x6 4x8
4x10
3x4
3x4
1.5x4
3x5
1-0-0
1-0-0
7-7-12
6-7-12
14-0-13
6-5-1
21-0-0
6-11-3
1-0-0
1-0-0
7-7-12
6-7-12
14-0-13
6-5-1
21-0-0
6-11-3
22-2-12
1-2-12
9-11-0
10-11-0
0-5-0
1-0-0
6.00 12
Plate Offsets (X,Y)-- [13:0-7-8,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.48
0.43
0.63
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.15
0.03
(loc)
8-17
8-17
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 123 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W1,W2,W3: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-6-13 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
10-0-0 oc bracing: 11-13
WEBS 1 Row at midpt 2-14, 3-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 14=744/0-6-0 (min. 0-1-8), 6=808/0-6-0 (min. 0-1-8)
Max Horz 14=-447(LC 17)
Max Uplift14=-252(LC 17), 6=-119(LC 17)
Max Grav 14=880(LC 24), 6=916(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 3-4=-638/59, 4-5=-793/28, 5-20=-1262/108, 6-20=-1346/76
BOT CHORD 13-14=-120/419, 2-13=-85/487, 8-9=0/1129, 6-8=0/1129
WEBS 2-14=-956/350, 9-13=0/456, 3-13=-715/295, 3-9=-45/432, 5-9=-570/204, 5-8=0/262
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-4-11, Interior(1) 4-4-11 to 22-2-12 zone; cantilever right
exposed ; end vertical right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
14=252, 6=119.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T13
Truss Type
Jack-Closed
Qty
3
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:19 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-E3HSl5N4QtkYc1g9qgWNuEu2QJe93hwZJr99aDzWJS2
Scale = 1:70.4
W1
T1
B1
B3
B2
W2
W4
W3
W5
W6 W7
T2
B4
1
2
3
4
5
6
714
13
12 11
10
9 8
18
19
20
3x4
1.5x4
3x4
3x6
3x4 3x4 4x8
4x8
3x4
3x4
1.5x4 3x5
2-0-0
2-0-0
8-6-6
6-6-6
15-0-13
6-6-6
22-0-0
6-11-3
2-0-0
2-0-0
8-6-6
6-6-6
15-0-13
6-6-6
22-0-0
6-11-3
23-2-12
1-2-12
10-5-0
11-5-0
0-5-0
1-0-0
6.00 12
Plate Offsets (X,Y)-- [13:0-5-12,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.42
0.44
0.60
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.15
0.03
(loc)
8-17
8-17
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 127 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W4,W5,W7: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-5-1 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. Except:
10-0-0 oc bracing: 11-13
WEBS 1 Row at midpt 2-14, 3-13
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 14=798/0-6-0 (min. 0-1-9), 6=844/0-6-0 (min. 0-1-9)
Max Horz 14=-467(LC 17)
Max Uplift14=-254(LC 17), 6=-121(LC 17)
Max Grav 14=944(LC 24), 6=957(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 3-19=-310/0, 3-4=-717/63, 4-5=-875/31, 5-20=-1353/113, 6-20=-1437/82
BOT CHORD 13-14=-53/413, 2-13=-97/646, 8-9=0/1210, 6-8=0/1210
WEBS 2-14=-948/290, 9-13=0/610, 3-13=-687/294, 3-9=-46/407, 5-9=-579/207, 5-8=0/265
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-4-11, Interior(1) 4-4-11 to 23-2-12 zone; cantilever right
exposed ; end vertical right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
14=254, 6=121.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T14
Truss Type
Flat Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:22 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-fezbN7Qzio66TVPkWo34WsW TKXhTG?G??pOpBYzWJS?
Scale: 3/16"=1'
W1
T1
W1
B1
W2
W1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W1
W2
T3T2
B3B2
1 2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
3x10
5x8 4x8 5x8
3x104x86x8
5x6
5x6
4x4
4x8
2x4 4x4
4x4
4x4
5x6
5x6
6x8
4x8
6x8
5-4-2
5-4-2
10-6-7
5-2-6
15-8-13
5-2-6
20-11-3
5-2-6
26-1-9
5-2-6
31-3-14
5-2-6
36-8-0
5-4-2
5-4-2
5-4-2
10-6-7
5-2-6
15-8-13
5-2-6
20-11-3
5-2-6
26-1-9
5-2-6
31-3-14
5-2-6
36-8-0
5-4-2
4-1-2Plate Offsets (X,Y)-- [12:0-3-8,0-3-0], [19:0-3-8,0-3-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.76
0.34
0.82
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.38
-0.57
0.09
(loc)
15-16
15-16
11
l/defl
>999
>767
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 248 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x6 SP 2400F 2.0E
BOT CHORD 2x6 SP 2400F 2.0E
WEBS 2x4 SPF Stud *Except*
W2: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-5-11 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-3-15 oc bracing.
WEBS 1 Row at midpt 1-19, 10-12
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 20=2022/0-6-0 (min. 0-1-12), 11=2009/0-6-0 (min. 0-1-12)
Max Uplift20=-1163(LC 8), 11=-1146(LC 8)
Max Grav 20=2142(LC 2), 11=2126(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-2037/1156, 1-21=-2613/1402, 21-22=-2613/1402, 22-23=-2613/1402,
2-23=-2613/1402, 2-24=-4294/2301, 24-25=-4294/2301, 25-26=-4294/2301,
3-26=-4294/2301, 3-27=-5136/2750, 4-27=-5136/2750, 4-5=-5136/2750, 5-28=-5136/2750,
28-29=-5136/2750, 29-30=-5136/2750, 6-30=-5136/2750, 6-31=-5141/2753,
31-32=-5141/2753, 7-32=-5141/2753, 7-33=-4290/2298, 8-33=-4290/2298,
8-9=-4290/2298, 9-34=-2608/1396, 34-35=-2608/1396, 35-36=-2608/1396,
10-36=-2608/1396, 10-11=-2026/1142
BOT CHORD 19-40=-1402/2613, 18-40=-1402/2613, 18-41=-1402/2613, 41-42=-1402/2613,
17-42=-1402/2613, 17-43=-2301/4294, 43-44=-2301/4294, 16-44=-2301/4294,
16-45=-2753/5141, 45-46=-2753/5141, 46-47=-2753/5141, 15-47=-2753/5141,
15-48=-2298/4290, 14-48=-2298/4290, 14-49=-2298/4290, 13-49=-2298/4290,
13-50=-1396/2608, 50-51=-1396/2608, 12-51=-1396/2608
WEBS 1-19=-1693/3157, 2-19=-1639/1003, 2-17=-1098/2051, 3-17=-1007/644, 3-16=-547/1029,
5-16=-423/335, 6-15=-426/337, 7-15=-556/1039, 7-13=-1011/648, 9-13=-1101/2053,
9-12=-1637/999, 10-12=-1687/3151
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
3) Unbalanced snow loads have been considered for this design.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
20=1163, 11=1146.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T14
Truss Type
Flat Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:22 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-fezbN7Qzio66TVPkWo34WsW TKXhTG?G??pOpBYzWJS?
NOTES-
8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 107 lb down and 92 lb up at 0-6-12, 112 lb down and 92 lb up at 2-1-4
, 112 lb down and 92 lb up at 4-1-4, 112 lb down and 92 lb up at 6-1-4, 112 lb down and 92 lb up at 8-1-4, 112 lb down and 92 lb up at 10-1-4, 112 lb down and 92 lb up
at 12-1-4, 112 lb down and 92 lb up at 14-1-4, 112 lb down and 92 lb up at 16-1-4, 112 lb down and 92 lb up at 18-1-4, 112 lb down and 92 lb up at 20-1-4, 112 lb down
and 92 lb up at 22-1-4, 112 lb down and 92 lb up at 24-1-4, 112 lb down and 92 lb up at 26-1-4, 112 lb down and 92 lb up at 28-1-4, 112 lb down and 92 lb up at 30-1-4,
112 lb down and 92 lb up at 32-1-4, and 112 lb down and 92 lb up at 34-1-4, and 104 lb down and 95 lb up at 36-1-4 on top chord, and 47 lb down and 19 lb up at 0-6-12
, 39 lb down and 25 lb up at 2-1-4, 39 lb down and 25 lb up at 4-1-4, 39 lb down and 25 lb up at 6-1-4, 39 lb down and 25 lb up at 8-1-4, 39 lb down and 25 lb up at
10-1-4, 39 lb down and 25 lb up at 12-1-4, 39 lb down and 25 lb up at 14-1-4, 39 lb down and 25 lb up at 16-1-4, 39 lb down and 25 lb up at 18-1-4, 39 lb down and 25 lb
up at 20-1-4, 39 lb down and 25 lb up at 22-1-4, 39 lb down and 25 lb up at 24-1-4, 39 lb down and 25 lb up at 26-1-4, 39 lb down and 25 lb up at 28-1-4, 39 lb down
and 25 lb up at 30-1-4, 39 lb down and 25 lb up at 32-1-4, and 39 lb down and 25 lb up at 34-1-4, and 47 lb down and 19 lb up at 36-1-4 on bottom chord. The
design/selection of such connection device(s) is the responsibility of others.
9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-10=-61, 11-20=-20
Concentrated Loads (lb)
Vert: 4=-31(F) 7=-31(F) 13=-24(F) 8=-31(F) 21=-49(F) 22=-31(F) 23=-31(F) 24=-31(F) 25=-31(F) 26=-31(F) 27=-31(F) 28=-31(F) 29=-31(F) 30=-31(F) 31=-31(F)
32=-31(F) 33=-31(F) 34=-31(F) 35=-31(F) 36=-49(F) 37=-29(F) 38=-24(F) 39=-24(F) 40=-24(F) 41=-24(F) 42=-24(F) 43=-24(F) 44=-24(F) 45=-24(F) 46=-24(F)
47=-24(F) 48=-24(F) 49=-24(F) 50=-24(F) 51=-24(F) 52=-24(F) 53=-24(F) 54=-29(F)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T15
Truss Type
Flat
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:23 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-7qWzaTRbT6Fz4f_x3WaJ243ivwy??Uj8DT7Mj_zWJS_
Scale = 1:63.0
W1
T1
W1
B1
W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2
T3T2
B3B2
1 2 3 4 5 6 7 8 9
18 17 16 15 14 13 12 11 10
19 20
3x4
5x6 3x6 5x6
3x43x65x6
4x4
4x4
3x4
3x8
1.5x4 3x4
4x4
4x4
5x6
3x6
3x6
6-2-8
6-2-8
12-3-4
6-0-12
18-4-0
6-0-12
24-4-12
6-0-12
30-5-8
6-0-12
36-8-0
6-2-8
6-2-8
6-2-8
12-3-4
6-0-12
18-4-0
6-0-12
24-4-12
6-0-12
30-5-8
6-0-12
36-8-0
6-2-8
5-7-2LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.45
0.64
0.68
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.18
-0.45
0.10
(loc)
14
12-14
10
l/defl
>999
>981
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 179 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W2: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-2-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-4-15 oc bracing.
WEBS 1 Row at midpt 1-18, 9-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 18=1470/0-6-0 (min. 0-2-7), 10=1470/0-6-0 (min. 0-2-7)
Max Horz 18=-202(LC 12)
Max Uplift18=-320(LC 12), 10=-320(LC 13)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-18=-1414/347, 1-19=-1452/342, 2-19=-1452/342, 2-3=-2282/498, 3-4=-2564/541,
4-5=-2564/541, 5-6=-2564/541, 6-7=-2282/498, 7-8=-2282/498, 8-20=-1452/342,
9-20=-1452/342, 9-10=-1414/347
BOT CHORD 16-17=-430/1452, 15-16=-430/1452, 14-15=-586/2282, 13-14=-552/2282,
12-13=-552/2282, 11-12=-363/1452
WEBS 1-17=-419/1906, 2-17=-1127/361, 2-15=-252/1102, 3-15=-606/235, 3-14=-100/375,
5-14=-372/177, 6-14=-100/375, 6-12=-606/235, 8-12=-252/1102, 8-11=-1127/361,
9-11=-419/1906
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-9-12, Interior(1) 3-9-12 to 36-6-4 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
18=320, 10=320.
6) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T16
Truss Type
Flat
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:24 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-b04LopRDEQNqipZ7dD5YbHbqyKJjkvoIS7twFQzWJRz
Scale = 1:63.0
W1
T1
W1
B1
W2
W1
W2 W1
W2
W1 W2
W1
W2
T3T2
B3B2
1 2 3 4 5 6 7 8
16 15 14 13 12 11 10 9
17 18
3x4
5x6 3x6 5x6
3x43x65x6
3x4
3x4
3x4 1.5x4
4x8
3x4
5x6
3x6
3x6
7-5-1
7-5-1
14-8-6
7-3-5
21-11-10
7-3-5
29-2-15
7-3-5
36-8-0
7-5-1
7-5-1
7-5-1
14-8-6
7-3-5
21-11-10
7-3-5
29-2-15
7-3-5
36-8-0
7-5-1
7-1-2LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.69
0.61
0.75
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.38
0.07
(loc)
12-13
12-13
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 186 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W2: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-5-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-8-9 oc bracing.
WEBS 1 Row at midpt 1-16, 8-9, 2-15, 4-12, 7-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 16=1470/0-6-0 (min. 0-2-7), 9=1470/0-6-0 (min. 0-2-7)
Max Horz 16=-260(LC 12)
Max Uplift16=-330(LC 12), 9=-330(LC 13)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-16=-1404/361, 1-17=-1317/321, 2-17=-1317/321, 2-3=-1935/424, 3-4=-1935/424,
4-5=-1934/424, 5-6=-1934/424, 6-7=-1934/424, 7-18=-1317/321, 8-18=-1317/321,
8-9=-1405/361
BOT CHORD 15-16=-256/275, 14-15=-434/1317, 13-14=-434/1317, 12-13=-537/1935, 11-12=-357/1317,
10-11=-357/1317
WEBS 1-15=-406/1779, 2-15=-1060/380, 2-13=-212/846, 4-13=-434/228, 5-12=-434/207,
7-12=-211/845, 7-10=-1060/380, 8-10=-406/1779
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-9-12, Interior(1) 3-9-12 to 36-6-4 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
16=330, 9=330.
6) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T17
Truss Type
Flat
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:25 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3Dej?9Sr?jVhKy8JBxdn7V80xkg?TLkRhncTntzWJRy
Scale = 1:63.3
W1
T1
W1
B1
W2 W1 W2 W1
W2
W1 W2 W1 W2
T3T2
B3B2
1 2 3 4 5 6 7 8
16 15 14 13 12 11 10 9
17 18
3x4
5x6 3x6 5x6
3x43x65x6
3x4
3x4
3x4 1.5x4
3x10
3x4
5x6
3x6
3x6
7-5-1
7-5-1
14-8-6
7-3-5
21-11-10
7-3-5
29-2-15
7-3-5
36-8-0
7-5-1
7-5-1
7-5-1
14-8-6
7-3-5
21-11-10
7-3-5
29-2-15
7-3-5
36-8-0
7-5-1
8-7-2LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.61
0.54
0.77
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.10
-0.31
0.06
(loc)
12-13
12-13
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 203 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-10-9 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 9-9-9 oc bracing.
WEBS 1 Row at midpt 1-16, 8-9, 2-15, 4-13, 4-12, 5-12, 7-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 16=1470/0-6-0 (min. 0-2-7), 9=1470/0-6-0 (min. 0-2-7)
Max Uplift16=-306(LC 12), 9=-306(LC 12)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-16=-1405/341, 1-17=-1080/225, 2-17=-1080/225, 2-3=-1586/330, 3-4=-1586/330,
4-5=-1585/330, 5-6=-1585/330, 6-7=-1585/330, 7-18=-1080/225, 8-18=-1080/225,
8-9=-1405/341
BOT CHORD 14-15=-225/1080, 13-14=-225/1080, 12-13=-330/1586, 11-12=-225/1080,
10-11=-225/1080
WEBS 1-15=-336/1618, 2-15=-1061/350, 2-13=-160/768, 4-13=-434/205, 5-12=-434/205,
7-12=-159/767, 7-10=-1061/350, 8-10=-336/1618
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-9-12, Interior(1) 3-9-12 to 36-6-4 zone;C-C for members and
forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
16=306, 9=306.
6) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T18
Truss Type
Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:27 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-?bmUQqU5XLlPZGHiIMfFDwDItYMXxFYk855arlzWJRw
Scale = 1:75.0
0-1-14
0-1-14
T1
T2 T5
B1
W3 W4 W5 W4 W5 W4 W5 W4 W5 W4 W3W1
W2
W7
W6
T4T3
B3B2
1
2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
21 22 23 24
6x6
3x6 5x6
3x4 3x65x6 5x6
3x4
3x8
1.5x4 3x4
3x4
3x4
5x6
6x6
4x6
5x6
3x4
3x8
3x6
3-4-0
3-4-0
9-8-2
6-4-2
16-2-1
6-5-14
22-7-15
6-5-14
29-1-14
6-5-14
35-6-0
6-4-2
36-8-0
1-2-0
3-4-0
3-4-0
9-8-2
6-4-2
16-2-1
6-5-14
22-7-15
6-5-14
29-1-14
6-5-14
35-6-0
6-4-2
36-8-0
1-2-0
8-7-0
10-1-2
10-3-0
9-8-0
10-1-2
6.00 12
Plate Offsets (X,Y)-- [11:Edge,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.84
0.48
0.82
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.32
0.06
(loc)
14-16
14-16
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 260 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-10-9 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-19, 3-18, 4-16, 6-14, 7-13, 9-12, 1-20,
10-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 20=1439/0-6-0 (min. 0-2-11), 11=1458/0-6-0 (min. 0-2-13)
Max Horz 20=52(LC 16)
Max Uplift20=-249(LC 13), 11=-287(LC 12)
Max Grav 20=1627(LC 37), 11=1720(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-557/109, 2-21=-1279/246, 3-21=-1282/246, 3-22=-1556/299, 4-22=-1556/299,
4-5=-1556/299, 5-6=-1556/299, 6-23=-1489/283, 7-23=-1489/283, 7-24=-1086/197,
8-24=-1086/197, 8-9=-1086/197, 1-20=-1608/255, 10-11=-1484/175
BOT CHORD 18-19=-114/514, 17-18=-242/1279, 16-17=-242/1279, 15-16=-280/1489, 14-15=-280/1489,
13-14=-194/1086
WEBS 2-19=-1252/268, 2-18=-253/1413, 3-18=-1054/293, 3-16=-108/518, 4-16=-390/184,
6-14=-488/209, 7-14=-157/730, 7-13=-1247/332, 9-13=-303/1679, 9-12=-1652/356,
1-19=-214/1442, 10-12=-194/1473
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 7-6-15, Interior(1) 7-6-15 to 35-6-0, Exterior(2) 35-6-0 to 36-6-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
20=249, 11=287.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T19
Truss Type
Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:28 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-UoKsdAUjIetGBQsus3AUl7mUJxjGgiGtNkr7OCzWJRv
Scale = 1:77.0
0-1-14
0-1-14
T1
T2
T4
B1
W3
W4
W5 W4 W5 W4 W5
W4
W3
W1
W2
W7
W6
T3
B1B2
1
2 3 4 5 6 7
8
17 16 15 14 13 12 11 10 9
18
19
20 21 22 23 24 25 26
6x6
3x6
3x4 3x64x6 4x4
3x4 1.5x4
3x8
3x4
5x6
6x6
5x6
5x6
3x4
5x6
3x6
6-4-0
6-4-0
12-9-10
6-5-10
19-5-0
6-7-6
26-0-6
6-7-6
32-6-0
6-5-10
36-8-0
4-2-0
6-4-0
6-4-0
12-9-10
6-5-10
19-5-0
6-7-6
26-0-6
6-7-6
32-6-0
6-5-10
36-8-0
4-2-0
8-7-0
11-7-2
11-9-0
9-8-0
11-7-2
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.79
0.44
0.79
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.26
0.05
(loc)
13
13-15
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 254 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-7-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-16, 2-15, 3-15, 4-13, 6-11, 7-11, 7-10,
1-17, 8-9
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=1411/0-6-0 (min. 0-2-9), 9=1426/0-6-0 (min. 0-2-11)
Max Horz 17=78(LC 16)
Max Uplift17=-196(LC 13), 9=-226(LC 12)
Max Grav 17=1567(LC 37), 9=1652(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-18=-895/156, 18-19=-861/160, 2-19=-856/178, 2-20=-1335/265, 20-21=-1335/264,
3-21=-1338/264, 3-22=-1453/271, 4-22=-1453/271, 4-23=-1453/271, 5-23=-1453/271,
5-6=-1453/271, 6-24=-1227/240, 24-25=-1224/240, 7-25=-1222/240, 7-26=-576/134,
8-26=-622/122, 1-17=-1515/270, 8-9=-1624/281
BOT CHORD 15-16=-148/786, 14-15=-232/1335, 13-14=-232/1335, 12-13=-197/1224, 11-12=-197/1224,
10-11=-78/562
WEBS 2-16=-925/210, 2-15=-206/1110, 3-15=-833/257, 4-13=-464/184, 6-13=-95/454,
6-11=-1024/290, 7-11=-240/1337, 7-10=-1213/253, 1-16=-156/1310, 8-10=-197/1433
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 6-4-0, Exterior(2) 6-4-0 to 36-6-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=196, 9=226.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T20
Truss Type
Piggyback Base
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:29 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-y_uErWVM3y?7paR4QnhjILJg9L2IP9a1cOahwezWJRu
Scale = 1:78.3
T1
T2
T4
B1
W3
W4
W5 W4 W5 W4 W5
W4
W3 W1
W2
W7
W6
T3
B1B2
1
2 3 4 5 6 7
8
17 16 15 14 13 12 11 10 9
18
19
20 21 22 23 24
25
3x6
3x4 3x64x6 4x4
5x6 3x4 1.5x4
3x8
3x4
5x6
5x6
6x6
5x6
3x4
5x6
3x6
5-10-0
5-10-0
12-6-10
6-8-10
19-5-0
6-10-6
26-3-6
6-10-6
33-0-0
6-8-10
36-8-0
3-8-0
5-10-0
5-10-0
12-6-10
6-8-10
19-5-0
6-10-6
26-3-6
6-10-6
33-0-0
6-8-10
36-8-0
3-8-0
8-7-0
11-6-0
9-8-0
11-6-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-2-0], [7:0-3-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.72
0.46
0.78
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.12
-0.26
0.06
(loc)
13
13-15
9
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 253 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-6-10 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-16, 2-15, 3-15, 4-13, 6-11, 7-11, 7-10,
1-17, 8-9
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=1415/0-6-0 (min. 0-2-10), 9=1432/0-6-0 (min. 0-2-12)
Max Horz 17=76(LC 16)
Max Uplift17=-205(LC 13), 9=-237(LC 12)
Max Grav 17=1577(LC 37), 9=1663(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-18=-850/148, 18-19=-820/153, 2-19=-783/170, 2-20=-1331/261, 20-21=-1331/261,
3-21=-1331/261, 3-22=-1452/273, 4-22=-1452/273, 4-23=-1452/273, 5-23=-1452/273,
5-6=-1452/273, 6-24=-1213/236, 7-24=-1213/236, 7-25=-520/122, 8-25=-562/111,
1-17=-1531/266, 8-9=-1642/277
BOT CHORD 15-16=-144/745, 14-15=-236/1331, 13-14=-236/1331, 12-13=-200/1213, 11-12=-200/1213,
10-11=-73/509
WEBS 2-16=-963/217, 2-15=-210/1140, 3-15=-838/263, 4-13=-451/191, 6-13=-98/456,
6-11=-1031/297, 7-11=-247/1370, 7-10=-1261/265, 1-16=-163/1316, 8-10=-206/1457
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-10-0, Exterior(2) 5-10-0 to 36-6-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=205, 9=237.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T21
Truss Type
Piggyback Base
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:31 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-uN?_GCXcbZFr2tbTXBkBNmO189h4t33K3i3n_WzWJRs
Scale = 1:77.8
T1
T2
T4
B1
B2
B3
B4
B5
W3
W4 W5 W6 W5
W8
W7
W9 W10 W9 W10 W11 W1
W2
W13
W12
T3
B6
1
2
3 4 5 6 7 8 9
10
22 21
20
19 18
17
16 15 14 13 12 11
23
24
25 26 27 28
29
4x6
3x6
3x4
4x6
3x5 5x8
2x4
3x4 3x6
5x6 5x6
5x6 3x4
3x4
5x8
3x4
5x6
5x6
6x6 6x6 3x4
5x6
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
36-8-0
3-8-0
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
36-8-0
3-8-0
8-7-0
11-6-0
9-8-0
1-0-0
11-6-0
6.00 12
Plate Offsets (X,Y)-- [3:0-3-0,0-2-0], [9:0-3-0,0-2-0], [17:0-2-8,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.69
0.69
0.78
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.31
0.17
(loc)
5
15-16
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 297 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-2-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
4-4-13 oc bracing: 20-21.
1 Row at midpt 2-20, 5-17
WEBS 1 Row at midpt 3-19, 4-18, 6-15, 8-13, 9-12, 1-22, 10-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 22=1415/0-6-0 (min. 0-2-10), 11=1432/0-6-0 (min. 0-2-12)
Max Horz 22=76(LC 16)
Max Uplift22=-205(LC 13), 11=-237(LC 12)
Max Grav 22=1577(LC 37), 11=1663(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-23=-436/84, 2-23=-410/91, 2-24=-904/189, 3-24=-867/206, 3-25=-1286/261,
4-25=-1286/261, 4-5=-1536/293, 5-26=-1534/293, 6-26=-1534/293, 6-27=-1424/265,
7-27=-1424/265, 7-8=-1424/265, 8-28=-1155/229, 9-28=-1155/229, 9-29=-520/123,
10-29=-562/112, 1-22=-1611/269, 10-11=-1638/279
BOT CHORD 20-21=-1288/208, 2-20=-1303/235, 19-20=-105/384, 18-19=-159/810, 17-18=-231/1286,
5-17=-416/150, 14-15=-189/1155, 13-14=-189/1155, 12-13=-73/506
WEBS 2-19=-156/1125, 3-19=-915/192, 3-18=-209/1179, 4-18=-975/251, 4-17=-124/604,
15-17=-244/1361, 6-15=-602/219, 8-15=-115/566, 8-13=-1084/291, 9-13=-247/1373,
9-12=-1261/259, 1-21=-217/1413, 10-12=-206/1446
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-10-0, Exterior(2) 5-10-0 to 36-6-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
22=205, 11=237.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T22
Truss Type
Piggyback Base
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:33 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-ql7lhuYs7AVYHBlsfcmfSBTK_yM5LyUcX0Yu3PzWJRq
Scale = 1:79.9
T1
T2
T4
B1
B2
B3
B4
B5
W3
W4 W5 W6 W5
W8
W7
W9 W10 W9 W10 W11
W1
W2
W13
W 12
T3
B6
1
2
3 4 5 6 7 8 9
10
22 21
20
19 18
17
16 15 14 13 12 11
23
24
25 26 27 28 29
3x6
4x6
3x4
4x6
3x5
5x8
2x4
3x4 3x6
4x4 4x6
5x6 3x4
3x4
5x8
3x4
5x6
5x6
5x6
6x6
5x6
3x4
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
35-8-0
2-8-0
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
35-8-0
2-8-0
8-7-0
11-6-0
10-2-0
1-0-0
11-6-0
6.00 12
Plate Offsets (X,Y)-- [3:0-3-0,0-2-0], [9:0-3-0,0-2-0], [17:0-2-8,0-2-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.86
0.66
0.85
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.30
0.16
(loc)
5
15-16
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 296 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-3-11 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
4-5-15 oc bracing: 20-21.
1 Row at midpt 2-20, 5-17
WEBS 1 Row at midpt 3-19, 4-18, 6-15, 8-13, 9-12, 1-22, 10-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 22=1376/0-6-0 (min. 0-2-8), 11=1400/0-6-0 (min. 0-2-12)
Max Horz 22=87(LC 16)
Max Uplift22=-197(LC 13), 11=-246(LC 12)
Max Grav 22=1530(LC 37), 11=1660(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-23=-423/82, 2-23=-397/91, 2-24=-876/195, 3-24=-839/207, 3-25=-1239/256,
4-25=-1239/256, 4-26=-1469/282, 5-26=-1469/282, 5-27=-1467/282, 6-27=-1467/282,
6-28=-1338/251, 7-28=-1338/251, 7-8=-1338/251, 8-29=-1044/204, 9-29=-1044/204,
9-10=-397/89, 1-22=-1563/269, 10-11=-1642/272
BOT CHORD 20-21=-1248/199, 2-20=-1262/229, 19-20=-128/373, 18-19=-161/784, 17-18=-230/1239,
5-17=-416/150, 14-15=-176/1044, 13-14=-176/1044, 12-13=-56/369
WEBS 2-19=-149/1087, 3-19=-881/183, 3-18=-198/1128, 4-18=-929/241, 4-17=-113/554,
15-17=-235/1278, 6-15=-635/226, 8-15=-124/618, 8-13=-1130/299, 9-13=-255/1429,
9-12=-1371/281, 1-21=-213/1370, 10-12=-222/1498
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-8-9, Interior(1) 3-8-9 to 5-10-0, Exterior(2) 5-10-0 to 35-6-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
22=197, 11=246.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T23
Truss Type
Piggyback Base
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:34 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Iyh7uEZUtUdPvLK2DKHu?O0YsMe04QUmlgISbrzWJRp
Scale = 1:86.4
T1
T2
T4
B1
B2
B3
B4
B5
W3
W4 W5 W6 W5
W8
W7
W9 W 10 W9 W10 W 11
W12 W13
W1
W2 W15
W14
T3
B6
1
2
3 4 5 6 7 8 9
10
11
24 23
22
21 20
19
18 17 16 15 14 13 12
25
26
27 28 29 30 31
32
33
34
4x6
3x6
3x4
5x6
4x6 5x8
2x4
3x4
3x6
5x6 5x6
5x6 4x4
5x8
3x4
3x4
4x4
5x6
3x4
3x4
4x6
6x6
3x4
5x6
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
38-0-4
5-0-4
43-4-0
5-3-12
2-6-0
2-6-0
5-10-0
3-4-0
10-4-0
4-6-0
14-10-0
4-6-0
20-10-1
6-0-1
26-11-15
6-1-13
33-0-0
6-0-1
38-0-4
5-0-4
43-4-0
5-3-12
8-7-0
11-6-0
6-4-0
1-0-0
11-6-0
6.00 12
Plate Offsets (X,Y)-- [3:0-3-0,0-2-0], [9:0-3-0,0-2-0], [17:0-1-8,0-2-0], [19:0-2-8,0-3-4]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.66
0.93
0.80
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.18
-0.39
0.23
(loc)
5
17-18
12
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 328 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8,W15: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-3-14 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except:
3-10-9 oc bracing: 22-23.
1 Row at midpt 2-22, 5-19
WEBS 1 Row at midpt 3-21, 4-20, 6-19, 6-17, 8-16, 9-14, 10-13,
1-24, 11-12
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 24=1674/0-6-0 (min. 0-3-1), 12=1645/0-6-0 (min. 0-2-13)
Max Horz 24=-142(LC 17)
Max Uplift24=-239(LC 13), 12=-191(LC 12)
Max Grav 24=1860(LC 37), 12=1722(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-25=-515/95, 2-25=-489/102, 2-26=-1078/215, 3-26=-1041/232, 3-27=-1568/312,
4-27=-1568/312, 4-5=-1946/366, 5-28=-1943/366, 6-28=-1943/366, 6-29=-1949/380,
7-29=-1949/380, 7-8=-1949/380, 8-30=-1832/376, 30-31=-1832/376, 9-31=-1832/376,
9-32=-1459/326, 10-32=-1519/301, 10-33=-1057/203, 33-34=-1066/187, 11-34=-1096/181,
1-24=-1904/313, 11-12=-1673/291
BOT CHORD 22-23=-1530/263, 2-22=-1554/278, 21-22=-70/455, 20-21=-133/968, 19-20=-221/1568,
5-19=-416/150, 16-17=-232/1832, 15-16=-141/1336, 14-15=-141/1336, 13-14=-132/953
WEBS 2-21=-191/1354, 3-21=-1120/235, 3-20=-267/1486, 4-20=-1255/302, 4-19=-180/913,
17-19=-266/1870, 6-17=-405/188, 8-17=-75/254, 8-16=-801/257, 9-16=-208/1050,
9-14=-559/172, 10-14=-122/767, 10-13=-1013/219, 1-23=-255/1674, 11-13=-201/1463
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 3-1-12, Interior(1) 3-1-12 to 5-10-0, Exterior(2) 5-10-0 to 37-2-15,
Interior(1) 37-2-15 to 43-2-4 zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
24=239,12=191.Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T23
Truss Type
Piggyback Base
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:34 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-Iyh7uEZUtUdPvLK2DKHu?O0YsMe04QUmlgISbrzWJRp
NOTES-
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T24
Truss Type
Piggyback Base
Qty
2
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:36 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-FKptJvblP5t78fTRKlJM4p5riAPrYL83D_nYgkzWJRn
Scale = 1:85.5
T1
T2
T4
B1
W3
W4
W5 W4 W5
W4
W5
W4
W3
W6 W7
W1
W2 W9
W8
T3
B1B2
1
2 3 4 5 6 7
8
9
19 18 17 16 15 14 13 12 11 10
20 21 22 23 24 25 26
27
28
3x6
3x4 3x65x6 5x6
5x6 3x4
3x8
1.5x4 3x4
4x4
5x6
3x4
3x4
4x6
5x6
3x4
5x6
3x6
5-10-0
5-10-0
12-6-10
6-8-10
19-5-0
6-10-6
26-3-6
6-10-6
33-0-0
6-8-10
38-0-4
5-0-4
43-4-0
5-3-12
5-10-0
5-10-0
12-6-10
6-8-10
19-5-0
6-10-6
26-3-6
6-10-6
33-0-0
6-8-10
38-0-4
5-0-4
43-4-0
5-3-12
8-7-0
11-6-0
6-4-0
11-6-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-2-0], [7:0-3-0,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.77
0.59
0.73
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.15
-0.34
0.09
(loc)
15
14-15
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 284 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W9: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-18, 2-17, 3-17, 4-15, 6-15, 6-14, 7-14,
7-12, 8-11, 1-19, 9-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 19=1674/Mechanical, 10=1645/Mechanical
Max Horz 19=-142(LC 17)
Max Uplift19=-239(LC 13), 10=-191(LC 12)
Max Grav 19=1860(LC 37), 10=1722(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-1008/205, 2-20=-940/222, 2-21=-1644/354, 21-22=-1644/354, 3-22=-1644/354,
3-23=-1938/399, 4-23=-1938/399, 4-24=-1938/399, 5-24=-1938/399, 5-6=-1938/399,
6-25=-1873/401, 25-26=-1873/401, 7-26=-1873/401, 7-8=-1519/349, 8-27=-1035/217,
27-28=-1065/201, 9-28=-1096/195, 1-19=-1814/359, 9-10=-1673/312
BOT CHORD 17-18=-121/889, 16-17=-234/1644, 15-16=-234/1644, 14-15=-240/1873, 13-14=-149/1339,
12-13=-149/1339, 11-12=-146/952
WEBS 2-18=-1175/263, 2-17=-271/1469, 3-17=-1121/315, 3-15=-118/562, 4-15=-451/190,
6-14=-749/263, 7-14=-207/1039, 7-12=-557/177, 8-12=-123/775, 8-11=-1015/235,
1-18=-216/1571, 9-11=-224/1461
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-5-12, Interior(1) 4-5-12 to 5-10-0, Exterior(2) 5-10-0 to 39-1-9,
Interior(1) 39-1-9 to 43-2-4 zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
19=239, 10=191.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T25
Truss Type
Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:38 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Bjwekbc?xj7rOydpSAMq9EA9vz540FJMgIGfkczWJRl
Scale = 1:89.8
0-1-14
0-1-14
T1
T2
T4
B1
W3
W4
W5 W4 W5
W4
W5 W4 W3
W6 W7
W1
W2 W9
W8
T3
B1B2
1
2 3 4 5 6 7
8
9
19 18 17 16 15 14 13 12 11 10
20
21
22 23 24 25
26
27
28
6x6
3x6
3x4 3x65x6 5x6
3x4
3x8
1.5x4 3x4
4x4
6x6
3x4
3x4
4x6
5x6
3x4
5x6
3x6
7-3-4
7-3-4
13-3-4
6-0-0
19-5-0
6-1-12
25-6-12
6-1-12
31-6-12
6-0-0
37-3-10
5-8-14
43-4-0
6-0-6
7-3-4
7-3-4
13-3-4
6-0-0
19-5-0
6-1-12
25-6-12
6-1-12
31-6-12
6-0-0
37-3-10
5-8-14
43-4-0
6-0-6
8-7-0
12-0-12
12-2-10
6-4-0
12-0-12
6.00 12
Plate Offsets (X,Y)-- [10:Edge,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.92
0.54
0.75
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.14
-0.31
0.09
(loc)
15
14-15
10
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 291 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T1: 2x4 SPF 1650F 1.5E
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W9: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-18, 2-17, 3-17, 4-15, 6-15, 6-14, 7-12,
8-11, 1-19, 9-10
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 19=1658/Mechanical, 10=1632/Mechanical
Max Horz 19=-153(LC 17)
Max Uplift19=-207(LC 13), 10=-166(LC 12)
Max Grav 19=1825(LC 37), 10=1722(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-1151/220, 20-21=-1110/232, 2-21=-1096/252, 2-22=-1616/364, 3-22=-1619/363,
3-23=-1873/400, 4-23=-1873/400, 4-24=-1873/400, 5-24=-1873/400, 5-6=-1873/400,
6-25=-1812/405, 7-25=-1809/406, 7-8=-1566/364, 8-26=-1093/234, 26-27=-1101/232,
27-28=-1135/217, 9-28=-1182/216, 1-19=-1764/365, 9-10=-1668/316
BOT CHORD 17-18=-128/1010, 16-17=-210/1616, 15-16=-210/1616, 14-15=-206/1809,
13-14=-150/1381, 12-13=-150/1381, 11-12=-154/1016
WEBS 2-18=-1037/246, 2-17=-248/1340, 3-17=-1078/291, 3-15=-109/554, 4-15=-492/171,
6-14=-718/246, 7-14=-192/946, 7-12=-465/163, 8-12=-111/683, 8-11=-922/234,
1-18=-203/1541, 9-11=-219/1450
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-5-12, Interior(1) 4-5-12 to 7-3-4, Exterior(2) 7-3-4 to 37-8-5,
Interior(1) 37-8-5 to 43-2-4 zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
19=207, 10=166.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T26
Truss Type
Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:39 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-fvU0xxddi0Gi?6C??tt3iSjJTNPdle8Vvy0DG3zWJRk
Scale = 1:81.8
0-1-14
0-1-14
T1
T2
T5
B1
W3 W4 W5 W4 W5 W4 W5 W4 W3
W6
W1
W2 W8
W7
T4T3
B3B2
1
2 3 4 5 6 7 8
9
10
19 18 17 16 15 14 13 12 11
20 21 22 23
24
6x6
3x6
2x4
3x4 3x66x6 5x6
3x4
3x8
1.5x4 3x4
4x6
6x6
4x4
4x46x6
3x8
3x10 MT18H
3x6
4-3-4
4-3-4
11-9-4
7-6-0
19-5-0
7-7-12
27-0-12
7-7-12
34-6-12
7-6-0
43-4-0
8-9-4
4-3-4
4-3-4
11-9-4
7-6-0
19-5-0
7-7-12
27-0-12
7-7-12
34-6-12
7-6-0
38-9-10
4-2-14
43-4-0
4-6-6
8-7-0
10-6-12
10-8-10
6-4-0
10-6-12
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.99
0.65
0.97
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.16
-0.42
0.11
(loc)
11-12
11-12
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 266 lb FT = 20%
GRIP
185/144
197/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2 *Except*
T4,T3: 2x4 SPF 1650F 1.5E
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W8: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied, except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 2-18, 3-17, 5-15, 6-14, 8-12, 1-19, 9-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 19=1691/Mechanical, 11=1659/Mechanical
Max Horz 19=-127(LC 17)
Max Uplift19=-274(LC 13), 11=-218(LC 12)
Max Grav 19=1902(LC 37), 11=1741(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-810/173, 2-20=-1723/340, 20-21=-1725/340, 3-21=-1728/339, 3-4=-2082/395,
4-5=-2082/395, 5-22=-2082/395, 6-22=-2082/395, 6-23=-2007/396, 7-23=-2007/396,
7-8=-2007/396, 8-9=-1449/316, 1-19=-1878/347
BOT CHORD 17-18=-103/739, 16-17=-263/1725, 15-16=-263/1725, 14-15=-287/2007, 13-14=-155/1303,
12-13=-155/1303, 11-12=-141/847
WEBS 2-18=-1377/299, 2-17=-311/1679, 3-17=-1201/345, 3-15=-131/603, 5-15=-445/211,
6-14=-824/285, 8-14=-244/1198, 8-12=-709/212, 9-12=-117/992, 1-18=-242/1667,
9-11=-1801/310
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 10-4-13, Interior(1) 10-4-13 to 34-6-12, Exterior(2) 34-6-12 to
40-8-5 zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) All plates are MT20 plates unless otherwise indicated.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
19=274, 11=218.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T27
Truss Type
Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:40 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-752O9HeFTKOZdGnCZaOIEfGUNnlUU5We8clmpVzWJRj
Scale = 1:80.7
0-1-14
0-1-14
T1 T2
T5
B1
W3 W4 W5 W4 W5 W4 W5 W4 W5 W4 W3
W1
W2
W7
W6
T4T3
B3B2
1 2 3 4 5 6 7 8 9
10
2019 18 17 16 15 14 13 12 11
21 22 23 24 25 26
5x6
6x6
3x6
3x10 MT18H 3x6
5x6
6x6
3x5
3x5
3x4
1.5x4
3x8
3x4
5x6
6x6
5x6 3x4
5x6
3x6
3x6
1-3-4
1-3-4
8-5-5
7-2-1
15-9-2
7-3-13
23-0-14
7-3-13
30-4-11
7-3-13
37-6-12
7-2-1
43-4-0
5-9-4
1-3-4
1-3-4
8-5-5
7-2-1
15-9-2
7-3-13
23-0-14
7-3-13
30-4-11
7-3-13
37-6-12
7-2-1
43-4-0
5-9-4
8-7-0
9-0-12
9-2-10
6-4-0
9-0-12
6.00 12
Plate Offsets (X,Y)-- [11:Edge,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.98
0.67
0.96
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.19
-0.49
0.11
(loc)
15-16
15-16
11
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 261 lb FT = 20%
GRIP
185/144
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W7: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied, except end verticals.
BOT CHORD Rigid ceiling directly applied or 9-1-5 oc bracing.
WEBS 1 Row at midpt 2-19, 3-18, 4-16, 6-15, 8-13, 9-12, 1-20,
10-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 20=1724/Mechanical, 11=1686/Mechanical
Max Horz 20=-100(LC 17)
Max Uplift20=-337(LC 13), 11=-267(LC 12)
Max Grav 20=1968(LC 37), 11=1796(LC 37)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-21=-1562/294, 3-21=-1565/294, 3-22=-2174/429, 4-22=-2174/429, 4-5=-2339/465,
5-6=-2339/465, 6-23=-2339/465, 7-23=-2339/465, 7-8=-2339/465, 8-24=-2053/401,
24-25=-2050/401, 9-25=-2049/402, 9-26=-1143/227, 10-26=-1207/211, 1-20=-1830/230,
10-11=-1753/319
BOT CHORD 18-19=-22/258, 17-18=-257/1561, 16-17=-257/1561, 15-16=-383/2174, 14-15=-335/2050,
13-14=-335/2050, 12-13=-159/1079
WEBS 2-19=-1885/416, 2-18=-389/2068, 3-18=-1433/390, 3-16=-213/987, 4-16=-618/251,
4-15=-64/257, 6-15=-440/208, 8-15=-116/538, 8-13=-1049/319, 9-13=-297/1542,
9-12=-1036/255, 1-19=-254/1823, 10-12=-229/1579
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 7-4-13, Interior(1) 7-4-13 to 37-6-12, Exterior(2) 37-6-12 to 43-2-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) All plates are MT20 plates unless otherwise indicated.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
20=337, 11=267.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T28
Truss Type
Half Hip
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:42 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3UA8azfW?xeHsaxah?QmK4LtrbQty0hxbwEttOzWJRh
Scale = 1:78.6
0-1-14
W1
T1
T3
B1
W2
W3
W2 W3 W2 W3 W2 W3 W2
W3
W2
W4 W6W5
T2T1
B3B2
1 2 3 4 5 6 7 8 9
10
20 19 18 17 16 15 14 13 12 11
21 22 23 24
3x10 MT18H
6x6 3x6
4x66x6
4x6
4x6
3x4
3x8
1.5x4 3x4
3x5
3x5
5x6
6x6
6x6 3x4
6x6
3x6
3x6
6-10-14
6-10-14
13-8-0
6-9-2
20-5-2
6-9-2
27-2-4
6-9-2
33-11-6
6-9-2
40-6-12
6-7-6
43-4-0
2-9-4
6-10-14
6-10-14
13-8-0
6-9-2
20-5-2
6-9-2
27-2-4
6-9-2
33-11-6
6-9-2
40-6-12
6-7-6
43-4-0
2-9-4
7-6-12
7-8-10
6-4-0
7-6-12
6.00 12
Plate Offsets (X,Y)-- [11:Edge,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.79
0.74
0.85
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.22
-0.55
0.13
(loc)
15-16
15-16
11
l/defl
>999
>944
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 238 lb FT = 20%
GRIP
185/144
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W3,W6,W5: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-7-4 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 8-0-10 oc bracing.
WEBS 1 Row at midpt 1-20, 2-19, 8-13, 9-12, 10-11
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 20=1738/Mechanical, 11=1713/Mechanical
Max Horz 20=-49(LC 17)
Max Uplift20=-365(LC 12), 11=-317(LC 12)
Max Grav 20=1980(LC 34), 11=1874(LC 34)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-1918/398, 1-21=-1569/296, 2-21=-1569/296, 2-22=-2378/475, 3-22=-2378/475,
3-4=-2698/551, 4-5=-2698/551, 5-6=-2698/551, 6-23=-2588/520, 7-23=-2588/520,
7-8=-2588/520, 8-24=-1983/387, 9-24=-1983/387, 9-10=-703/134, 10-11=-1863/316
BOT CHORD 18-19=-281/1569, 17-18=-456/2378, 16-17=-456/2378, 15-16=-494/2588,
14-15=-357/1980, 13-14=-357/1980, 12-13=-112/669
WEBS 1-19=-431/2276, 2-19=-1524/406, 2-18=-262/1240, 3-18=-776/271, 3-16=-111/512,
5-16=-415/197, 6-15=-579/228, 8-15=-202/973, 8-13=-1312/359, 9-13=-371/1957,
9-12=-1462/326, 10-12=-277/1689
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-5-12, Interior(1) 4-5-12 to 40-6-12, Exterior(2) 40-6-12 to 43-2-4
zone;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) Provide adequate drainage to prevent water ponding.
6) All plates are MT20 plates unless otherwise indicated.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Refer to girder(s) for truss to truss connections.
9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
20=365, 11=317.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T29
Truss Type
Flat
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:43 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-XgkXnJg8mFm8UkWnEjx?sIu6V_oBhSm5qa_QPqzWJRg
Scale = 1:74.5
W1
T1
W1
B1
W2 W1 W2 W1 W2 W1
W2
W1 W2 W1 W2 W1 W2
T3T2
B3B2
1 2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
21 22
4x4
4x8 3x6
4x8
4x44x86x6
4x6
4x6
3x4
4x4
3x4 1.5x4
4x8
3x4
4x6
4x6
6x6
3x6
4x8
6-3-9
6-3-9
12-5-5
6-1-13
18-7-2
6-1-13
24-8-14
6-1-13
30-10-11
6-1-13
37-0-7
6-1-13
43-4-0
6-3-9
6-3-9
6-3-9
12-5-5
6-1-13
18-7-2
6-1-13
24-8-14
6-1-13
30-10-11
6-1-13
37-0-7
6-1-13
43-4-0
6-3-9
6-0-12Plate Offsets (X,Y)-- [11:Edge,0-3-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.61
0.93
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.25
-0.61
0.10
(loc)
15-16
15-16
11
l/defl
>999
>840
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 241 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x6 SPF No.2
WEBS 2x4 SPF Stud *Except*
W2: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-8-8 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 8-4-3 oc bracing.
WEBS 1 Row at midpt 1-20, 10-11, 5-15
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 20=1739/Mechanical, 11=1739/Mechanical
Max Horz 20=217(LC 13)
Max Uplift20=-376(LC 12), 11=-376(LC 13)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-20=-1680/398, 1-21=-1658/391, 2-21=-1658/391, 2-3=-2721/596, 3-4=-3261/693,
4-5=-3261/693, 5-6=-3256/692, 6-7=-3256/692, 7-8=-3256/692, 8-9=-2722/596,
9-22=-1658/391, 10-22=-1658/391, 10-11=-1679/398
BOT CHORD 18-19=-485/1658, 17-18=-691/2721, 16-17=-691/2721, 15-16=-788/3261,
14-15=-645/2722, 13-14=-645/2722, 12-13=-407/1658
WEBS 1-19=-480/2236, 2-19=-1390/418, 2-18=-324/1448, 3-18=-864/289, 3-16=-174/735,
5-16=-372/192, 6-15=-374/178, 8-15=-171/727, 8-13=-859/288, 9-13=-324/1450,
9-12=-1391/418, 10-12=-479/2236
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-1-12 to 4-5-12, Interior(1) 4-5-12 to 43-2-4 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
20=376, 11=376.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T30
Truss Type
Flat Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:49 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Mq5o2MlvL5WHCfzwbz2P6Z8CxPpi5BLzCWRkdUzWJRa
Scale = 1:75.3
W1
T1
W1
B1
W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2
T3T2
B3B2
1 2 3 4 5 6 7 8 9 10 11
22 21 20 19 18 17 16 15 14 13 12
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
3x10
5x6 5x6
3x106x10
2x4
2x4
2x4
2x4
2x4
2x4
2x4
6x10
5-6-5
5-6-5
10-10-14
5-4-9
16-3-7
5-4-9
21-8-0
5-4-9
27-0-9
5-4-9
32-5-2
5-4-9
37-9-11
5-4-9
43-4-0
5-6-5
5-6-5
5-6-5
10-10-14
5-4-9
16-3-7
5-4-9
21-8-0
5-4-9
27-0-9
5-4-9
32-5-2
5-4-9
37-9-11
5-4-9
43-4-0
5-6-5
4-5-10LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.29
0.73
0.86
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.40
-0.59
0.13
(loc)
17
17
12
l/defl
>999
>869
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 497 lb FT = 20%
GRIP
197/144
LUMBER-
TOP CHORD 2x6 SPF No.2
BOT CHORD 2x6 SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-11-1 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 8-2-13 oc bracing.
REACTIONS. (lb/size) 22=2555/Mechanical, 12=2624/Mechanical
Max Uplift22=-1429(LC 8), 12=-1481(LC 8)
Max Grav 22=2692(LC 2), 12=2767(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-22=-2591/1426, 1-23=-3216/1707, 23-24=-3216/1707, 24-25=-3216/1707,
2-25=-3216/1707, 2-26=-3216/1707, 26-27=-3216/1707, 3-27=-3216/1707,
3-28=-6797/3604, 4-28=-6797/3604, 4-29=-6797/3604, 5-29=-6797/3604,
5-30=-6797/3604, 30-31=-6797/3604, 31-32=-6797/3604, 6-32=-6797/3604,
6-33=-6796/3603, 33-34=-6796/3603, 7-34=-6796/3603, 7-35=-6796/3603,
8-35=-6796/3603, 8-36=-6796/3603, 9-36=-6796/3603, 9-37=-3208/1698,
37-38=-3208/1698, 38-39=-3208/1698, 10-39=-3208/1698, 10-40=-3208/1698,
40-41=-3208/1698, 11-41=-3208/1698, 11-12=-2642/1475
BOT CHORD 21-45=-2896/5454, 45-46=-2896/5454, 20-46=-2896/5454, 19-20=-2896/5454,
19-47=-2896/5454, 18-47=-2896/5454, 18-48=-3848/7249, 48-49=-3848/7249,
49-50=-3848/7249, 17-50=-3848/7249, 17-51=-3848/7249, 51-52=-3848/7249,
16-52=-3848/7249, 15-16=-2893/5452, 15-53=-2893/5452, 14-53=-2893/5452,
14-54=-2893/5452, 54-55=-2893/5452, 55-56=-2893/5452, 13-56=-2893/5452
WEBS 1-21=-2110/3975, 2-21=-516/414, 3-21=-2791/1483, 3-20=0/324, 3-18=-884/1676,
5-18=-470/372, 6-18=-564/303, 6-17=0/328, 6-16=-565/304, 7-16=-472/374,
9-16=-887/1676, 9-14=0/329, 9-13=-2799/1489, 10-13=-510/406, 11-13=-2100/3967
NOTES-
1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x6 - 2 rows staggered at 0-9-0 oc.
Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc.
Webs connected as follows: 2x4 - 1 row at 0-9-0 oc.
2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to
ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; Lumber DOL=1.60 plate grip DOL=1.60
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
5) Unbalanced snow loads have been considered for this design.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 4x8 MT20 unless otherwise indicated.
8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T30
Truss Type
Flat Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:49 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-Mq5o2MlvL5WHCfzwbz2P6Z8CxPpi5BLzCWRkdUzWJRa
NOTES-
9) Refer to girder(s) for truss to truss connections.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 22=1429, 12=1481.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
12) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 122 lb down and 103 lb up at 1-1-4, 122 lb down and 103 lb up at
3-1-4, 122 lb down and 103 lb up at 5-1-4, 122 lb down and 103 lb up at 7-1-4, 122 lb down and 103 lb up at 9-1-4, 122 lb down and 103 lb up at 11-1-4, 122 lb down
and 103 lb up at 13-1-4, 122 lb down and 103 lb up at 15-1-4, 122 lb down and 103 lb up at 17-1-4, 122 lb down and 103 lb up at 19-1-4, 122 lb down and 103 lb up at
21-1-4, 122 lb down and 103 lb up at 23-1-4, 122 lb down and 103 lb up at 25-1-4, 122 lb down and 103 lb up at 27-1-4, 122 lb down and 103 lb up at 29-1-4, 122 lb
down and 103 lb up at 31-1-4, 122 lb down and 103 lb up at 33-1-4, 122 lb down and 103 lb up at 35-1-4, 122 lb down and 103 lb up at 37-1-4, 122 lb down and 103 lb
up at 39-1-4, and 122 lb down and 103 lb up at 41-1-4, and 109 lb down and 107 lb up at 43-2-4 on top chord, and 45 lb down and 23 lb up at 1-1-4, 45 lb down and 24
lb up at 3-1-4, 45 lb down and 24 lb up at 5-1-4, 45 lb down and 24 lb up at 7-1-4, 45 lb down and 24 lb up at 9-1-4, 45 lb down and 24 lb up at 11-1-4, 45 lb down and
24 lb up at 13-1-4, 45 lb down and 24 lb up at 15-1-4, 45 lb down and 24 lb up at 17-1-4, 45 lb down and 24 lb up at 19-1-4, 45 lb down and 24 lb up at 21-1-4, 45 lb
down and 24 lb up at 23-1-4, 45 lb down and 24 lb up at 25-1-4, 45 lb down and 24 lb up at 27-1-4, 45 lb down and 24 lb up at 29-1-4, 45 lb down and 24 lb up at
31-1-4, 45 lb down and 24 lb up at 33-1-4, 45 lb down and 24 lb up at 35-1-4, 45 lb down and 24 lb up at 37-1-4, 45 lb down and 24 lb up at 39-1-4, and 45 lb down and
24 lb up at 41-1-4, and 63 lb down and 14 lb up at 43-2-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-11=-61, 12-22=-20
Concentrated Loads (lb)
Vert: 11=-73(B) 12=-39(B) 19=-30(B) 3=-46(B) 20=-30(B) 7=-46(B) 16=-30(B) 15=-30(B) 23=-47(B) 24=-46(B) 25=-46(B) 26=-46(B) 27=-46(B) 28=-46(B) 29=-46(B)
30=-46(B) 31=-46(B) 32=-46(B) 33=-46(B) 34=-46(B) 35=-46(B) 36=-46(B) 37=-46(B) 38=-46(B) 39=-46(B) 40=-46(B) 41=-46(B) 42=-30(B) 43=-30(B) 44=-30(B)
45=-30(B) 46=-30(B) 47=-30(B) 48=-30(B) 49=-30(B) 50=-30(B) 51=-30(B) 52=-30(B) 53=-30(B) 54=-30(B) 55=-30(B) 56=-30(B) 57=-30(B) 58=-30(B)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T31
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:50 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-q1fAFimX6Pe8qoY79hZeemgJKpFjqjY7RAAI9wzWJRZ
Scale = 1:29.2
0-1-14
W1
T1
T2
W5
B1
W2
W3 W4 W5 W4
1
2
3 4 5
9
8 7
6
10
11 12 13 14 15 16
17 18 19 20
21
3x6
4x4
6x6
3x64x4
1.5x4
4x8
4x4
4-5-12
4-5-12
9-9-2
5-3-6
15-4-0
5-6-14
-1-4-12
1-4-12
4-5-12
4-5-12
9-9-2
5-3-6
15-4-0
5-6-14
1-2-0
3-3-0
3-4-14
3-3-0
6.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.57
0.36
0.54
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.07
-0.09
0.01
(loc)
7-8
6-7
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 66 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-0-1 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 9=670/0-4-0 (min. 0-1-8), 6=642/0-6-0 (min. 0-1-8)
Max Horz 9=98(LC 12)
Max Uplift9=-410(LC 8), 6=-542(LC 8)
Max Grav 9=779(LC 32), 6=811(LC 31)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-9=-741/416, 2-10=-849/593, 3-10=-800/613, 3-11=-1013/653, 11-12=-1014/654,
12-13=-1014/654, 4-13=-1017/654, 4-14=-1014/652, 14-15=-1014/652, 15-16=-1014/652,
5-16=-1014/652, 5-6=-744/488
BOT CHORD 8-17=-554/744, 17-18=-554/744, 7-18=-554/744
WEBS 2-8=-534/722, 3-7=-113/311, 4-7=-560/306, 5-7=-713/1111
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left exposed ; end vertical left exposed; porch left exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
9=410, 6=542.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 122 lb down and 176 lb up at
4-5-12, 86 lb down and 75 lb up at 5-7-4, 86 lb down and 75 lb up at 9-0-8, 86 lb down and 75 lb up at 11-0-8, and 86 lb down
and 75 lb up at 13-0-8, and 77 lb down and 79 lb up at 14-9-4 on top chord, and 75 lb down and 108 lb up at 4-5-12, 17 lb down
and 41 lb up at 5-7-4, 17 lb down and 41 lb up at 9-0-8, 17 lb down and 41 lb up at 11-0-8, and 17 lb down and 41 lb up at 13-0-8
, and 21 lb down and 41 lb up at 14-9-4 on bottom chord. The design/selection of such connection device(s) is the responsibility
of others.
11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) StandardContinued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T31
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:50 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-q1fAFimX6Pe8qoY79hZeemgJKpFjqjY7RAAI9wzWJRZ
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-51, 2-3=-51, 3-5=-61, 6-9=-20
Concentrated Loads (lb)
Vert: 3=-2(B) 8=-5(B) 11=-2(B) 13=-2(B) 14=-2(B) 15=-2(B) 16=-11(B) 17=-6(B) 18=-6(B) 19=-6(B) 20=-6(B) 21=-11(B)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T32
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:51 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-IDDYS2m9tim?Ry7JiO4tB_DTaDbMZCSGfpwriMzWJRY
Scale = 1:29.2
0-1-14
W1
T1
T2
W5
B1
W2
W3 W4 W5 W4
1
2
3 4 5
9
8 7
6
10
11
12 13
3x6
5x6
6x6
3x64x4
1.5x4
3x10
3x4
5-11-12
5-11-12
10-6-2
4-6-6
15-4-0
4-9-14
-1-4-12
1-4-12
5-11-12
5-11-12
10-6-2
4-6-6
15-4-0
4-9-14
1-2-0
4-0-0
4-1-14
4-0-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.60
0.27
0.44
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.06
-0.08
0.01
(loc)
8-9
8-9
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 70 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-4-4 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 9=643/0-4-0 (min. 0-1-8), 6=592/0-6-0 (min. 0-1-8)
Max Horz 9=128(LC 16)
Max Uplift9=-155(LC 12), 6=-244(LC 12)
Max Grav 9=786(LC 36), 6=740(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-9=-730/479, 2-10=-741/570, 10-11=-702/581, 3-11=-695/598, 3-12=-677/500,
4-12=-680/499, 4-13=-676/499, 5-13=-676/499, 5-6=-694/452
BOT CHORD 8-9=-334/233, 7-8=-574/624
WEBS 2-8=-318/531, 4-7=-474/158, 5-7=-618/839
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 5-11-12, Exterior(2) 5-11-12 to 10-6-2
zone; cantilever left exposed ; end vertical left exposed; porch left exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
9=155, 6=244.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T33
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:52 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-nPnwgNnne0us36iVG6c6kBlcmdtxIauPuTfPEpzWJRX
Scale = 1:35.5
0-1-14
W1
T1
T2
W6
B1
W2 W3
W4 W5
1
2
3
4 5
8 7 6
9
10
11 12 13
3x4
4x4
3x8
4x4
3x4 6x6
6x6
8-11-12
8-11-12
15-4-0
6-4-4
-1-4-12
1-4-12
4-9-0
4-9-0
8-11-12
4-2-11
15-4-0
6-4-4
1-2-0
5-6-0
5-7-14
5-6-0
6.00 12
Plate Offsets (X,Y)-- [5:Edge,0-3-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.70
0.57
0.74
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.28
-0.37
0.02
(loc)
7-8
7-8
6
l/defl
>651
>485
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 72 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W5: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-7-14 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 8=628/0-4-0 (min. 0-1-8), 6=578/0-6-0 (min. 0-1-8)
Max Horz 8=189(LC 16)
Max Uplift8=-105(LC 12), 6=-207(LC 12)
Max Grav 8=875(LC 36), 6=655(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-399/276, 2-9=-234/256, 3-9=-183/278, 3-10=-611/472, 4-10=-518/483,
5-6=-268/90
BOT CHORD 7-8=-565/690, 6-7=-460/460
WEBS 3-8=-685/239, 3-7=-277/174, 4-7=-428/368, 4-6=-590/586
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 8-11-12, Exterior(2) 8-11-12 to 13-2-11
zone; cantilever left exposed ; end vertical left exposed; porch left exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
8=105, 6=207.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T34
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:53 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-FcLJtjoPPK0jhGHiqp7LGPIp_0G_12zZ77PymFzWJRW
Scale = 1:41.9
0-1-14
W1
T1
T2
W7
B1W2
W3 W4
W5 W6
1
2
3
4 5
9 8 7 6
10
11
3x6
4x6
6x6
1.5x4
6x64x4
3x4
3x4
6-1-10
6-1-10
11-11-12
5-10-2
15-4-0
3-4-4
-1-4-12
1-4-12
6-1-10
6-1-10
11-11-12
5-10-2
15-4-0
3-4-4
1-2-0
7-0-0
7-1-14
7-0-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.54
0.32
0.69
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.07
-0.09
0.01
(loc)
8-9
8-9
6
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 81 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W6: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-5-2 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-0-14 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 9=618/0-4-0 (min. 0-1-8), 6=557/0-6-0 (min. 0-1-8)
Max Horz 9=251(LC 16)
Max Uplift9=-97(LC 16), 6=-155(LC 12)
Max Grav 9=870(LC 36), 6=637(LC 36)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-9=-813/421, 2-10=-997/484, 3-10=-786/512, 3-11=-452/203, 4-11=-325/231
BOT CHORD 8-9=-354/210, 7-8=-615/792, 6-7=-242/283
WEBS 2-8=-265/590, 3-7=-607/441, 4-7=-445/441, 4-6=-658/561
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 11-11-12, Exterior(2) 11-11-12 to
15-2-4 zone; cantilever left exposed ; end vertical left exposed; porch left exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9 except (jt=lb)
6=155.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T35
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:54 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-jouh53p1Ad8aIQruOXeapcrzVQaXmc5iMn8VIhzWJRV
Scale = 1:49.4
W1
T2
W5
B1W2
W3
W4T1
1
2
3
4
5
8 7 6
9
10
3x4
4x6
3x6
4x6
3x6
4x4
3x4
7-7-10
7-7-10
15-4-0
7-8-6
-1-4-12
1-4-12
7-7-10
7-7-10
14-11-12
7-4-2
15-4-0
0-4-4
1-2-0
8-6-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-1-8], [5:0-2-8,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.62
0.50
0.25
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.07
-0.18
0.01
(loc)
6-7
6-7
6
l/defl
>999
>977
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 78 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud *Except*
W5: 2x6 SPF No.2, W2,W4: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-9-15 oc bracing.
WEBS 1 Row at midpt 5-6, 3-6
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 8=612/0-4-0 (min. 0-1-8), 6=525/0-6-0 (min. 0-1-8)
Max Horz 8=362(LC 13)
Max Uplift8=-114(LC 16), 6=-173(LC 16)
Max Grav 8=696(LC 2), 6=612(LC 23)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-629/228, 2-9=-726/88, 3-9=-545/125
BOT CHORD 7-8=-511/508, 6-7=-267/564
WEBS 2-7=0/393, 3-7=0/306, 3-6=-642/243
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 15-1-4 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
8=114, 6=173.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T36
Truss Type
Jack-Closed
Qty
12
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:55 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-B_S3IPpfxxHRwaQ4xE9pLqN7OqvOV28saRu3r7zWJRU
Scale = 1:50.3
W1
T2
W5
B1W2
W3
W4T1
1
2
3
4
5
8 7 6
9
10
3x4
3x6
3x4
4x4
4x6
6x6
3x4
7-8-0
7-8-0
15-4-0
7-8-0
-1-4-12
1-4-12
7-8-0
7-8-0
15-4-0
7-8-0
1-2-0
8-10-0
6.00 12
Plate Offsets (X,Y)-- [2:0-3-0,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.67
0.52
0.26
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.16
-0.21
0.01
(loc)
6-7
6-7
6
l/defl
>999
>844
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 74 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 HF/SPF No.2 *Except*
W1,W3: 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 7-1-0 oc bracing.
WEBS 1 Row at midpt 5-6, 3-6
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 8=615/0-4-0 (min. 0-1-8), 6=528/0-6-0 (min. 0-1-8)
Max Horz 8=321(LC 16)
Max Uplift8=-67(LC 16), 6=-221(LC 16)
Max Grav 8=699(LC 2), 6=616(LC 23)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-8=-632/367, 2-9=-734/364, 3-9=-552/400
BOT CHORD 7-8=-463/291, 6-7=-553/572
WEBS 2-7=-105/364, 3-7=-342/313, 3-6=-659/636
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -1-4-12 to 1-7-4, Interior(1) 1-7-4 to 15-2-4 zone; cantilever left exposed ;
end vertical left exposed; porch left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8 except (jt=lb)
6=221.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T37
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:58 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-bZ8CwRsYEsf?n19fdMjWzS?ei1qXiFXIGP6jRSzWJRR
Scale = 1:34.9
0-1-11
W1
T1
T2
W10
B1
B2
B3
B4
B1
W3
W2
W4 W5 W6 W7 W6 W5
W9
W8
1
2
3
4 5 6 7 8
17 16
15 14 13 12
11
10 9
18 19 20 21 22 23 24 25 26
27 28 29 30 31 32
33
34
3x6
5x8
5x6
6x6
3x4
3x4
1.5x44x4
5x12
4x10
1.5x4
1.5x4
3x10
6x12
5x6
2-6-0
2-6-0
3-0-13
0-6-13
7-6-9
4-5-12
12-0-4
4-5-12
16-6-0
4-5-12
19-0-0
2-6-0
-0-10-4
0-10-4
2-6-0
2-6-0
3-0-13
0-6-13
7-6-9
4-5-12
12-0-4
4-5-12
16-6-0
4-5-12
19-0-0
2-6-0
1-1-14
3-3-13
3-5-8
3-3-13
1-0-0
9.00 12
Plate Offsets (X,Y)-- [4:0-3-0,0-2-2], [14:0-1-12,0-0-0], [15:0-6-11,0-0-4], [15:0-0-0,0-1-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.67
0.94
0.93
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.17
-0.35
0.19
(loc)
12-13
12-13
9
l/defl
>999
>646
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 88 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2,B4: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 2-7-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 5-6-9 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 17=1138/0-6-0 (min. 0-2-1), 9=1193/0-6-0 (min. 0-2-5)
Max Horz 17=131(LC 50)
Max Uplift17=-434(LC 12), 9=-459(LC 9)
Max Grav 17=1234(LC 31), 9=1409(LC 31)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-17=-1219/451, 2-3=-1954/794, 3-4=-1954/801, 4-18=-3091/1085, 18-19=-3093/1085,
19-20=-3094/1085, 5-20=-3095/1085, 5-21=-3093/1084, 21-22=-3093/1084,
6-22=-3093/1084, 6-23=-1424/466, 23-24=-1424/466, 7-24=-1424/466, 7-25=-1343/443,
25-26=-1343/443, 8-26=-1343/443, 8-9=-1328/490
BOT CHORD 14-15=-738/1650, 14-27=-731/1641, 27-28=-731/1641, 13-28=-731/1641,
13-29=-1053/3011, 29-30=-1053/3011, 12-30=-1053/3011, 12-31=-1053/3011,
31-32=-1053/3011, 11-32=-1053/3011, 7-11=-420/210
WEBS 2-15=-654/1458, 4-14=-109/274, 4-13=-492/1598, 5-13=-530/221, 6-12=-0/266,
6-11=-1733/596, 8-11=-620/1809
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate
grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
17=434, 9=459.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T37
Truss Type
Jack-Closed Girder
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:58 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-bZ8CwRsYEsf?n19fdMjWzS?ei1qXiFXIGP6jRSzWJRR
NOTES-
10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 109 lb down and 130 lb up at 3-0-13, 72 lb down and 71 lb up at
5-2-0, 72 lb down and 71 lb up at 7-2-0, 72 lb down and 71 lb up at 9-2-0, 72 lb down and 71 lb up at 11-2-0, 72 lb down and 71 lb up at 13-2-0, 72 lb down and 71 lb
up at 15-2-0, and 80 lb down and 92 lb up at 17-2-0, and 88 lb down and 89 lb up at 18-5-4 on top chord, and 78 lb down and 108 lb up at 3-0-13, 41 lb down and 33 lb
up at 3-2-0, 41 lb down and 33 lb up at 5-2-0, 41 lb down and 33 lb up at 7-2-0, 41 lb down and 33 lb up at 9-2-0, 41 lb down and 33 lb up at 11-2-0, 41 lb down and 33
lb up at 13-2-0, 41 lb down and 33 lb up at 15-2-0, and 45 lb down at 17-2-0, and 57 lb down at 18-5-4 on bottom chord. The design/selection of such connection
device(s) is the responsibility of others.
11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-2=-51, 2-4=-51, 4-8=-61, 16-17=-20, 11-15=-20, 9-10=-20
Concentrated Loads (lb)
Vert: 4=-66(F) 14=-90(F=-37) 19=-40(F) 20=-40(F) 21=-40(F) 22=-40(F) 23=-40(F) 24=-40(F) 25=-48(F) 26=-66(F) 27=-37(F) 28=-37(F) 29=-37(F) 30=-37(F)
31=-37(F) 32=-37(F) 33=-29(F) 34=-35(F)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T38
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:06:59 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-3lia8nsA?AnsPBkrA4ElWgYpqRJWRo2RV3sG_vzWJRQ
Scale = 1:34.9
0-1-11
W1
T1
T2
W10
B1
B2
B3
B4
B1
W3
W2
W4
W5 W6 W7 W6
W9
W8
1
2
3
4 5 6 7
15 14
13
12 11
10
9 8
16 17 18
1.5x4
4x8
5x6
3x4
3x5
3x5
1.5x44x4
3x10
3x4
1.5x4
4x8
5x12
4x6
2-6-0
2-6-0
4-4-13
1-10-13
10-5-7
6-0-9
16-6-0
6-0-9
19-0-0
2-6-0
-0-10-4
0-10-4
2-6-0
2-6-0
4-4-13
1-10-13
10-5-7
6-0-9
16-6-0
6-0-9
19-0-0
2-6-0
1-1-14
4-3-13
4-5-8
4-3-13
1-0-0
9.00 12
Plate Offsets (X,Y)-- [4:0-3-0,0-2-2]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.64
0.38
0.52
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.08
-0.16
0.08
(loc)
11
10-11
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 93 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2,B4: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-4-14 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=770/0-6-0 (min. 0-1-8), 8=750/0-6-0 (min. 0-1-12)
Max Horz 15=171(LC 13)
Max Uplift15=-79(LC 13), 8=-166(LC 13)
Max Grav 15=861(LC 35), 8=1049(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-15=-845/187, 2-3=-1292/301, 3-4=-1281/240, 4-16=-1691/262, 16-17=-1692/261,
5-17=-1694/261, 5-18=-1692/261, 6-18=-1692/261, 6-7=-729/126, 7-8=-1012/180
BOT CHORD 12-13=-415/1022, 11-12=-302/1059, 10-11=-173/777, 6-10=-907/221
WEBS 2-13=-369/920, 4-11=-168/709, 5-11=-648/196, 6-11=-172/1019, 7-10=-221/1219
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-4-4, Interior(1) 2-4-4 to 4-4-13, Exterior(2) 4-4-13 to 8-7-12
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15 except (jt=lb)
8=166.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T39
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:00 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-YyGyL7tomTvj1LJ2knl_2t50brfhAGEbkjbqWLzWJRP
Scale = 1:36.3
0-1-11
W1
T1
T2
W10
B1
B2
B3
B4
B1
W3
W2
W4
W5 W6 W7 W6
W9
W8
1
2
3
4 5 6 7
15 14
13
12 11
10
9 8
16
17
18 19 20
1.5x4
4x8
5x6
3x4
3x6
3x4
1.5x4 4x4
3x10
3x4
1.5x4
3x10
4x8
4x4
2-6-0
2-6-0
5-8-13
3-2-13
11-1-7
5-4-9
16-6-0
5-4-9
19-0-0
2-6-0
-0-10-4
0-10-4
2-6-0
2-6-0
5-8-13
3-2-13
11-1-7
5-4-9
16-6-0
5-4-9
19-0-0
2-6-0
1-1-14
5-3-13
5-5-8
5-3-13
1-0-0
9.00 12
Plate Offsets (X,Y)-- [4:0-3-0,0-2-2], [10:0-5-12,0-2-0]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.52
0.32
0.46
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.05
-0.11
0.07
(loc)
11
11-12
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 100 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2,B4: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-6-6 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=760/0-6-0 (min. 0-1-8), 8=746/0-6-0 (min. 0-1-11)
Max Horz 15=211(LC 13)
Max Uplift15=-86(LC 16), 8=-169(LC 13)
Max Grav 15=875(LC 36), 8=1026(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-15=-858/183, 2-16=-1195/309, 16-17=-1165/311, 3-17=-1164/318, 3-4=-1116/210,
4-18=-1191/209, 18-19=-1192/209, 5-19=-1194/209, 5-20=-1192/209, 6-20=-1192/209,
6-7=-527/124, 7-8=-991/186
BOT CHORD 14-15=-269/271, 12-13=-503/1051, 11-12=-307/890, 10-11=-155/551, 6-10=-878/221
WEBS 2-13=-431/908, 3-12=-349/217, 4-12=-44/254, 4-11=-136/377, 5-11=-583/178,
6-11=-148/793, 7-10=-209/1079
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-4-4, Interior(1) 2-4-4 to 5-8-13, Exterior(2) 5-8-13 to 9-11-12
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15 except (jt=lb)
8=169.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T40
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:01 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-08pKZSuQWn1aeVuEIVGDb5d9YF_pvj7kzNLN2nzWJRO
Scale = 1:40.7
0-1-11
W1
T1
T2
W10
B1
B2
B3
B4
B1
W3
W2
W4
W5 W6 W7 W6
W9
W8
1
2
3
4 5 6 7
15 14
13
12 11
10
9 8
16
17
18 19 20
1.5x4
4x8
5x6
3x5
4x8
3x4
1.5x4 4x4
3x10
3x4
1.5x4
3x8
4x12
4x4
2-6-0
2-6-0
7-0-13
4-6-13
11-9-7
4-8-9
16-6-0
4-8-9
19-0-0
2-6-0
-0-10-4
0-10-4
2-6-0
2-6-0
7-0-13
4-6-13
11-9-7
4-8-9
16-6-0
4-8-9
19-0-0
2-6-0
1-1-14
6-3-13
6-5-8
6-3-13
1-0-0
9.00 12
Plate Offsets (X,Y)-- [4:0-3-0,0-2-2]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.69
0.39
0.42
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.04
-0.08
0.06
(loc)
11
11-12
8
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 108 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2,B4: 2x4 SPF Stud
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-10-13 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 15=752/0-6-0 (min. 0-1-9), 8=742/0-6-0 (min. 0-1-10)
Max Horz 15=251(LC 13)
Max Uplift15=-95(LC 16), 8=-173(LC 13)
Max Grav 15=934(LC 36), 8=996(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-15=-918/179, 2-3=-1257/323, 3-16=-976/149, 16-17=-953/149, 4-17=-939/180,
4-18=-875/194, 18-19=-876/193, 5-19=-877/193, 5-20=-875/193, 6-20=-875/193,
6-7=-402/129, 7-8=-962/203
BOT CHORD 14-15=-309/311, 12-13=-587/1197, 11-12=-309/752, 10-11=-154/417, 6-10=-841/231
WEBS 2-14=-226/266, 2-13=-480/1009, 3-12=-525/293, 4-12=-41/276, 5-11=-512/160,
6-11=-149/660, 7-10=-220/985
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-4-4, Interior(1) 2-4-4 to 7-0-13, Exterior(2) 7-0-13 to 11-3-12
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15 except (jt=lb)
8=173.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T41
Truss Type
Jack-Closed
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:02 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-UKNimov2H59RGeTQsCnT7IALdfIPe8MuB14waDzWJRN
Scale = 1:42.7
0-1-11
W1
T1
T2
W9
B1
B2
B3
B4
B1
W3
W2 W4
W5 W6 W6
W8
W7
1
2
3
4 5 6 7
14 13
12
11
10
9 8
15
16
17 18
1.5x4
4x8
5x6
3x6
4x6
1.5x4
1.5x44x4
3x10
4x8
3x4
5x12
4x6
2-6-0
2-6-0
8-4-13
5-10-13
16-6-0
8-1-3
19-0-0
2-6-0
-0-10-4
0-10-4
2-6-0
2-6-0
8-4-13
5-10-13
12-5-7
4-0-9
16-6-0
4-0-9
19-0-0
2-6-0
1-1-14
7-3-13
7-5-8
7-3-13
1-0-0
9.00 12
Plate Offsets (X,Y)-- [3:0-1-0,0-1-12], [4:0-3-0,0-2-2]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.61
0.56
0.55
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.13
-0.34
0.07
(loc)
10-11
10-11
8
l/defl
>999
>669
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 111 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2 *Except*
B2,B4: 2x4 SPF Stud
WEBS 2x4 SPF Stud *Except*
W6: 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-6-3 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing.
WEBS 1 Row at midpt 7-8
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 14=744/0-6-0 (min. 0-1-10), 8=736/0-6-0 (min. 0-1-9)
Max Horz 14=291(LC 13)
Max Uplift14=-102(LC 16), 8=-178(LC 13)
Max Grav 14=986(LC 36), 8=960(LC 35)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-14=-972/176, 2-3=-1361/327, 3-15=-932/126, 15-16=-803/143, 4-16=-800/165,
4-17=-642/180, 5-17=-643/180, 5-18=-331/136, 6-18=-331/136, 6-7=-321/135,
7-8=-943/210
BOT CHORD 13-14=-348/347, 11-12=-676/1343, 10-11=-257/639, 6-10=-323/126
WEBS 2-13=-241/307, 2-12=-531/1094, 3-11=-703/387, 4-11=0/255, 5-11=-80/330,
5-10=-540/186, 7-10=-227/925
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-4-4, Interior(1) 2-4-4 to 8-4-13, Exterior(2) 8-4-13 to 12-5-7
zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) Provide adequate drainage to prevent water ponding.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb)
14=102, 8=178.
9) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T42
Truss Type
Half Hip Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:05 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-uv3rOqxxa0X076B?XKLAlxopTsKprR2Kt?JbBYzWJRK
Scale = 1:51.6
0-1-11
T1
T2
W8
B1
W1 W2
W3 W4
W5 W6 W7 W6
HW1
B2
1
2
3
4
5
6 7 8
14 13 12 11 10 9
19
20
21 22 23 24 25 26 27
6x12 MT18H
5x12 MT18H
6x12
4x6
8x8
3x5
3x6 8x8
4x8
10x10
1.5x4
12x12
8x8
3-5-4
3-5-4
6-2-15
2-9-10
9-8-13
3-5-15
14-2-11
4-5-13
19-0-0
4-9-5
-0-10-4
0-10-4
3-5-4
3-5-4
6-2-15
2-9-10
9-8-13
3-5-15
14-2-11
4-5-13
19-0-0
4-9-5
1-1-14
8-3-13
8-5-8
8-3-13
9.00 12
Plate Offsets (X,Y)-- [6:0-8-0,0-1-4], [8:0-3-8,Edge], [9:Edge,0-3-8], [10:0-6-0,0-6-4], [12:0-3-8,0-6-4], [13:0-3-8,0-5-12]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
NO
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MSH
0.83
0.45
0.81
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.11
-0.25
0.03
(loc)
12-13
12-13
9
l/defl
>999
>894
n/a
L/d
240
180
n/a
PLATES
MT20
MT18H
Weight: 310 lb FT = 20%
GRIP
185/144
185/144
LUMBER-
TOP CHORD 2x4 SPF 1650F 1.5E *Except*
T2: 2x4 HF/SPF No.2
BOT CHORD 2x8 SP 2400F 2.0E
WEBS 2x4 SPF Stud *Except*
W8,W6: 2x4 SPF 1650F 1.5E, W5,W7: 2x4 HF/SPF No.2
SLIDER Left 2x6 SP 2400F 2.0E 2-0-0
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-7-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
WEBS 1 Row at midpt 8-9
REACTIONS. (lb/size) 9=8367/0-6-0 (min. 0-3-9), 2=6791/0-6-0 (min. 0-2-15)
Max Horz 2=317(LC 12)
Max Uplift9=-1621(LC 9), 2=-1913(LC 12)
Max Grav 9=8554(LC 31), 2=7046(LC 32)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-3=-4303/1163, 3-4=-8662/2436, 4-5=-8887/2290, 5-19=-7153/1596, 6-19=-7048/1618,
6-20=-4373/869, 7-20=-4375/868, 7-8=-4373/868, 8-9=-7593/1525
BOT CHORD 2-14=-2110/6675, 14-21=-2110/6675, 13-21=-2110/6675, 13-22=-1993/7114,
22-23=-1993/7114, 12-23=-1993/7114, 12-24=-1313/5577, 11-24=-1313/5577,
11-25=-1313/5577, 10-25=-1313/5577
WEBS 4-14=-503/192, 4-13=-31/782, 5-13=-1332/3061, 5-12=-2681/1224, 6-12=-1681/6243,
6-10=-2630/918, 7-10=-510/159, 8-10=-1701/8576
NOTES-
1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc.
Bottom chords connected as follows: 2x8 - 2 rows staggered at 0-4-0 oc.
Webs connected as follows: 2x4 - 1 row at 0-9-0 oc.
2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to
ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated.
3) Unbalanced roof live loads have been considered for this design.
4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone; cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60
5) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=20.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1, Lu=50-0-0; Min. flat roof snow load
governs. Rain surcharge applied to all exposed surfaces with slopes less than 0.500/12 in accordance with IBC 1608.3.4.
6) Unbalanced snow loads have been considered for this design.
7) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
8) Provide adequate drainage to prevent water ponding.
9) All plates are MT20 plates unless otherwise indicated.
10) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
Continued on page 2
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T42
Truss Type
Half Hip Girder
Qty
1
Ply
2
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:05 2019 Page 2
ID:?kBZNna9Me1?QphcfV33moyQFve-uv3rOqxxa0X076B?XKLAlxopTsKprR2Kt?JbBYzWJRK
NOTES-
11) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 9=1621, 2=1913.
12) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
13) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2672 lb down and 1449 lb up at 4-9-0, 1719 lb down and 396 lb up at
6-9-12, 1960 lb down and 385 lb up at 8-9-12, 1948 lb down and 357 lb up at 10-9-12, 1882 lb down and 294 lb up at 12-9-12, and 1805 lb down and 227 lb up at
14-9-12, and 1840 lb down and 259 lb up at 16-9-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others.
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate Increase=1.15
Uniform Loads (plf)
Vert: 1-6=-51, 6-8=-61, 9-15=-20
Concentrated Loads (lb)
Vert: 21=-2535(B) 22=-1719(B) 23=-1960(B) 24=-1948(B) 25=-1882(B) 26=-1805(B) 27=-1840(B)
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T43
Truss Type
Common
Qty
4
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:06 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-M6dDcAyZLJftlGmC52sPI8L72GlSa3nT6f28k?zWJRJ
Scale = 1:24.9
T1 T1
B1
W1
1
2
3
4
5
6
13
14
15
16
17
18
3x4 3x4
1.5x4
4x4
4-2-0
4-2-0
8-4-0
4-2-0
-0-10-4
0-10-4
4-2-0
4-2-0
8-4-0
4-2-0
9-2-4
0-10-4
0-5-14
3-7-6
0-5-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-MP
0.20
0.17
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
0.02
-0.02
0.00
(loc)
6-9
6-12
2
l/defl
>999
>999
n/a
L/d
240
180
n/a
PLATES
MT20
Weight: 28 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 2=338/0-3-8 (min. 0-1-8), 4=338/0-3-8 (min. 0-1-8)
Max Horz 2=98(LC 15)
Max Uplift2=-61(LC 16), 4=-61(LC 17)
Max Grav 2=385(LC 2), 4=385(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 2-13=-361/63, 13-14=-292/74, 14-15=-288/76, 3-15=-276/86, 3-16=-276/86,
16-17=-288/76, 17-18=-292/74, 4-18=-361/63
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) -0-10-4 to 2-1-12, Interior(1) 2-1-12 to 4-2-0, Exterior(2) 4-2-0 to 7-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 4.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
T43GE
Truss Type
Common Supported Gable
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:07 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-qIBbpWzB6dnkMQLOelNeqMtLwg7oJXZdLJohGRzWJRI
Scale = 1:24.9
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
6
7
10 9 8
11
12
4x4
2x4 2x41.5x4 1.5x4
1.5x4
1.5x4
1.5x4
8-4-0
8-4-0
-0-10-4
0-10-4
4-2-0
4-2-0
8-4-0
4-2-0
9-2-4
0-10-4
0-5-14
3-7-6
0-5-14
9.00 12
Plate Offsets (X,Y)-- [6:0-1-5,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.06
0.03
0.04
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
-0.00
-0.00
0.00
(loc)
6
6
6
l/defl
n/r
n/r
n/a
L/d
120
120
n/a
PLATES
MT20
Weight: 32 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 8-4-0.
(lb) - Max Horz 2=-98(LC 14)
Max Uplift All uplift 100 lb or less at joint(s) 2, 6 except 10=-103(LC 16), 8=-101(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 2, 6, 9, 10, 8
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3) -0-10-4 to 2-2-0, Exterior(2) 2-2-0 to 4-2-0, Corner(3) 4-2-0 to 7-2-0 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
4) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
5) Unbalanced snow loads have been considered for this design.
6) This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 15.4 psf on overhangs
non-concurrent with other live loads.
7) Gable requires continuous bottom chord bearing.
8) Gable studs spaced at 2-0-0 oc.
9) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2, 6 except
(jt=lb) 10=103, 8=101.
11) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V01
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:07 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-qIBbpWzB6dnkMQLOelNeqMtJfg6GJWjdLJohGRzWJRI
Scale = 1:38.3
T1 W1
B1
ST3
ST2
ST1
1
2
3
4
5
9 8 7 62x4
9-7-13
9-7-13
9-7-13
9-7-13
7-2-149.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.14
0.07
0.10
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 45 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 9-7-13.
(lb) - Max Horz 1=278(LC 16)
Max Uplift All uplift 100 lb or less at joint(s) 6, 7, 8 except 9=-130(LC 16)
Max Grav All reactions 250 lb or less at joint(s) 1, 6, 7, 8 except 9=286(LC 29)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-2=-311/267
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Corner(3) 0-5-4 to 3-7-13, Exterior(2) 3-7-13 to 9-6-1 zone; cantilever left exposed ;
end vertical left exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry
Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1.
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) All plates are 1.5x4 MT20 unless otherwise indicated.
6) Gable studs spaced at 2-0-0 oc.
7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 7, 8 except
(jt=lb) 9=130.
9) Non Standard bearing condition. Review required.
10) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI
1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V02
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:08 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-JUl_1szptxvb_ZwaCTutNZQN_3RZ2zGmazXFotzWJRH
Scale = 1:39.8
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
8-3-13
8-3-13
0-0-4
6-2-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.55
0.13
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
-0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 31 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=103/8-3-8 (min. 0-1-8), 4=102/8-3-8 (min. 0-1-8), 5=342/8-3-8 (min. 0-1-8)
Max Horz 1=231(LC 13)
Max Uplift1=-18(LC 12), 4=-54(LC 13), 5=-192(LC 16)
Max Grav 1=166(LC 30), 4=142(LC 29), 5=421(LC 29)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-6=-337/302, 6-7=-315/326, 2-7=-315/331
WEBS 2-5=-354/250
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 8-2-1 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) Gable requires continuous bottom chord bearing.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 4 except (jt=lb)
5=192.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V03
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:09 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-nhIMEB_ReE1RcjVmmAP6wnzbaToDnQewodHoKJzWJRG
Scale = 1:33.4
T1 W1
B1
ST1
1
2
3
5 4
6
7
8
2x4
1.5x4
1.5x41.5x4
1.5x4
6-11-13
6-11-13
0-0-4
5-2-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.37
0.10
0.07
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
4
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 25 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=50/6-11-8 (min. 0-1-8), 4=110/6-11-8 (min. 0-1-8), 5=293/6-11-8 (min. 0-1-8)
Max Horz 1=191(LC 13)
Max Uplift1=-29(LC 12), 4=-49(LC 13), 5=-164(LC 16)
Max Grav 1=110(LC 30), 4=149(LC 29), 5=361(LC 29)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
TOP CHORD 1-6=-307/288, 2-6=-292/293
WEBS 2-5=-306/221
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 6-10-1 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) Gable requires continuous bottom chord bearing.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 4 except (jt=lb)
5=164.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V04
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:10 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-FtskSX?4PY9IDt4zKuwLS_Vk7t4jWuy31H0MtmzWJRF
Scale = 1:25.9
T1
W1
B1
1
2
3
4
5
6
2x4
1.5x4
1.5x4
5-7-13
5-7-13
0-0-4
4-2-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.45
0.28
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 18 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-7-13 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=179/5-7-8 (min. 0-1-8), 3=179/5-7-8 (min. 0-1-8)
Max Horz 1=151(LC 13)
Max Uplift1=-13(LC 16), 3=-72(LC 16)
Max Grav 1=203(LC 2), 3=232(LC 29)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 5-6-1 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) Gable requires continuous bottom chord bearing.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V05
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:11 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-j3Q6ft0iAsI9r1f9tbRa?C2zGHS2FLCCGxmvPCzWJRE
Scale = 1:19.1
T1
W1
B1
1
2
3
4
2x4
1.5x4
1.5x4
4-3-13
4-3-13
0-0-4
3-2-14
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.23
0.14
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 14 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
WEBS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 4-3-13 oc purlins,
except end verticals.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=132/4-3-8 (min. 0-1-8), 3=132/4-3-8 (min. 0-1-8)
Max Horz 1=112(LC 13)
Max Uplift1=-9(LC 16), 3=-53(LC 16)
Max Grav 1=149(LC 2), 3=171(LC 29)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 4-2-1 zone; cantilever left and right
exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
2) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
3) Unbalanced snow loads have been considered for this design.
4) Gable requires continuous bottom chord bearing.
5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
7) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V06
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:12 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-BF_UtD1Kx9Q0TBDLRJzpXPa79hob_m6MUbVSxezWJRD
Scale = 1:44.1
T1 T1
B1
ST2
ST1 ST1
B2
1
2
3
4
5
9 8 7 6
10
11
12 13
14
15
3x4
4x4
3x4
3x6 1.5x4 1.5x4
1.5x4
1.5x4
1.5x4
0-0-5
0-0-5
19-2-11
19-2-5
9-7-5
9-7-5
19-2-11
9-7-5
0-0-4
7-2-8
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.29
0.19
0.15
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 65 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 19-2-0.
(lb) - Max Horz 1=180(LC 13)
Max Uplift All uplift 100 lb or less at joint(s) 1 except 9=-229(LC 16), 6=-229(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 9=496(LC 29), 6=496(LC 30)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 2-9=-371/267, 4-6=-371/267
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 9-7-5, Exterior(2) 9-7-5 to 12-7-5 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb)
9=229, 6=229.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V07
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:13 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-fSYt4Z1yiTYt4LoY?0U24d7JK491jEuVjFF0T5zWJRC
Scale = 1:41.7
T1 T1
B1
ST2
ST1 ST1
B2
1
2
3
4
5
9 8 7 6
10
11
12 13
14
15
3x4
4x4
3x4
3x6 1.5x4
1.5x4
1.5x4
1.5x4
1.5x4
0-0-5
0-0-5
16-6-11
16-6-5
8-3-5
8-3-5
16-6-11
8-3-5
0-0-4
6-2-8
0-0-4
9.00 12
Plate Offsets (X,Y)-- [8:0-2-4,0-1-8]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.19
0.11
0.12
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 55 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 16-6-0.
(lb) - Max Horz 1=154(LC 13)
Max Uplift All uplift 100 lb or less at joint(s) 1 except 9=-191(LC 16), 6=-191(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 9=406(LC 29), 6=406(LC 30)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 2-9=-312/228, 4-6=-312/228
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 8-3-5, Exterior(2) 8-3-5 to 11-3-5 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb)
9=191, 6=191.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V08
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:14 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-7e6FHv2aTngkiUNkZj?HdqgVlUVMShcfyv_Z0XzWJRB
Scale = 1:33.8
T1 T1
B1
ST2
ST1 ST1
1
2
3
4
5
8 7 6
9
10
11 12
13
14
3x4
4x4
3x4
1.5x4 1.5x4
1.5x4
1.5x4
1.5x4
0-0-5
0-0-5
13-10-11
13-10-5
6-11-5
6-11-5
13-10-11
6-11-5
0-0-4
5-2-8
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-SH
0.15
0.10
0.09
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
5
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 44 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. All bearings 13-10-0.
(lb) - Max Horz 1=-127(LC 14)
Max Uplift All uplift 100 lb or less at joint(s) 1 except 8=-163(LC 16), 6=-163(LC 17)
Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 7=252(LC 2), 8=339(LC 29), 6=339(LC 30)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
WEBS 2-8=-273/202, 4-6=-273/202
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 6-11-5, Exterior(2) 6-11-5 to 9-11-5 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb)
8=163, 6=163.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V09
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:15 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-bqgdVF3CD4obKeyw6RWW 92CbXupZB8uoBYk6YzzWJRA
Scale = 1:27.4
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
9
10
3x4
4x4
3x4
1.5x4
11-2-5
11-2-5
11-2-11
0-0-5
5-7-5
5-7-5
11-2-11
5-7-5
0-0-4
4-2-8
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.47
0.23
0.08
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 32 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=201/11-2-0 (min. 0-1-8), 3=201/11-2-0 (min. 0-1-8), 4=330/11-2-0 (min. 0-1-8)
Max Horz 1=-101(LC 12)
Max Uplift1=-56(LC 16), 3=-69(LC 17)
Max Grav 1=231(LC 2), 3=231(LC 2), 4=366(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 5-7-5, Exterior(2) 5-7-5 to 8-7-5 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V10
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:15 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-bqgdVF3CD4obKeyw6RWW 92Cf1uqBB9UoBYk6YzzWJRA
Scale = 1:22.1
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
2x4
4x4
2x41.5x4
0-0-5
0-0-5
8-6-11
8-6-5
4-3-5
4-3-5
8-6-11
4-3-5
0-0-4
3-2-8
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.25
0.13
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 24 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=149/8-6-0 (min. 0-1-8), 3=149/8-6-0 (min. 0-1-8), 4=245/8-6-0 (min. 0-1-8)
Max Horz 1=-75(LC 12)
Max Uplift1=-42(LC 16), 3=-51(LC 17)
Max Grav 1=171(LC 2), 3=171(LC 2), 4=272(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 4-3-5, Exterior(2) 4-3-5 to 7-3-5 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V11
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:16 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-41D?ib4q_OwSxoX7g81liFls5ICawc1yPCTg4QzWJR9
Scale: 3/4"=1'
T1 T1
B1
ST1
1
2
3
4
2x4
4x4
2x41.5x4
0-0-5
0-0-5
5-10-11
5-10-5
2-11-5
2-11-5
5-10-11
2-11-5
0-0-4
2-2-8
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.10
0.06
0.03
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 16 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 5-10-11 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=98/5-10-0 (min. 0-1-8), 3=98/5-10-0 (min. 0-1-8), 4=160/5-10-0 (min. 0-1-8)
Max Horz 1=49(LC 15)
Max Uplift1=-27(LC 16), 3=-34(LC 17)
Max Grav 1=112(LC 2), 3=112(LC 2), 4=178(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V12
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:17 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-YDnNwx4Tli2JZy6JEsY_ETI24iXpf3h5esDDcszWJR8
Scale = 1:8.8
T1 T1
B1
1
2
3
2x4
3x4
2x4
0-0-5
0-0-5
3-2-11
3-2-5
1-7-5
1-7-5
3-2-11
1-7-5
0-0-4
1-2-8
0-0-4
9.00 12
Plate Offsets (X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.02
0.06
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 7 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-2-11 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=83/3-2-0 (min. 0-1-8), 3=83/3-2-0 (min. 0-1-8)
Max Horz 1=23(LC 13)
Max Uplift1=-12(LC 16), 3=-12(LC 17)
Max Grav 1=94(LC 2), 3=94(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V13
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:18 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-0PLl7G55W?AAB6hVoZ3Dngq9U5rWOW5EtWyn9IzWJR7
Scale = 1:23.7
T1 T1
B1
ST1
1
2
3
4
5
6
7
8
9
10
2x4
4x4
2x41.5x4
0-0-5
0-0-5
9-3-0
9-2-11
4-7-8
4-7-8
9-3-0
4-7-8
0-0-4
3-5-10
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.30
0.15
0.05
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 26 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=163/9-2-5 (min. 0-1-8), 3=163/9-2-5 (min. 0-1-8), 4=267/9-2-5 (min. 0-1-8)
Max Horz 1=-82(LC 12)
Max Uplift1=-45(LC 16), 3=-56(LC 17)
Max Grav 1=187(LC 2), 3=187(LC 2), 4=297(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) 0-5-4 to 3-5-4, Interior(1) 3-5-4 to 4-7-8, Exterior(2) 4-7-8 to 7-7-8 zone;
cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V14
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:19 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-Ucv8Lc6jHJI1oGGhLHbSKuNMqVC17yjO6AiKhkzWJR6
Scale = 1:17.6
T1 T1
B1
ST1
1
2
3
4
2x4
4x4
2x41.5x4
0-0-5
0-0-5
6-7-0
6-6-11
3-3-8
3-3-8
6-7-0
3-3-8
0-0-4
2-5-10
0-0-4
9.00 12
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.13
0.07
0.03
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 18 lb FT = 20%
GRIP
185/144
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
OTHERS 2x4 SPF Stud
BRACING-
TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=111/6-6-5 (min. 0-1-8), 3=111/6-6-5 (min. 0-1-8), 4=182/6-6-5 (min. 0-1-8)
Max Horz 1=56(LC 13)
Max Uplift1=-31(LC 16), 3=-38(LC 17)
Max Grav 1=127(LC 2), 3=127(LC 2), 4=202(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks
DE Job # 65047-W1
Dansco Engineering, LLC
Date: 3/29/19
WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!!
This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing
requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of
the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and
TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information.
Job
1903535-12T
Truss
V15
Truss Type
Valley
Qty
1
Ply
1
1903535-12T DWH Woodside at W.C. 17
Job Reference (optional)
Run: 8.200 s Apr 7 2018 Print: 8.200 s Apr 7 2018 MiTek Industries, Inc. Thu Mar 28 20:07:20 2019 Page 1
ID:?kBZNna9Me1?QphcfV33moyQFve-yoTWYy7L2dQuQPruv_6hs5wZ4vYusPRXKqRtDBzWJR5
Scale = 1:10.1
T1 T1
B1
1
2
3
2x4
3x4
2x4
3-10-11
3-10-11
3-11-0
0-0-5
1-11-8
1-11-8
3-11-0
1-11-8
0-0-4
1-5-10
0-0-4
9.00 12
Plate Offsets (X,Y)-- [2:0-2-0,Edge]
LOADING (psf)
TCLL
TCDL
BCLL
BCDL
20.0
10.0
0.0
10.0
SPACING-
Plate Grip DOL
Lumber DOL
Rep Stress Incr
Code
2-0-0
1.15
1.15
YES
IBC2012/TPI2007
CSI.
TC
BC
WB
Matrix-P
0.03
0.10
0.00
DEFL.
Vert(LL)
Vert(TL)
Horz(TL)
in
n/a
n/a
0.00
(loc)
-
-
3
l/defl
n/a
n/a
n/a
L/d
999
999
n/a
PLATES
MT20
Weight: 9 lb FT = 20%
GRIP
185/148
LUMBER-
TOP CHORD 2x4 HF/SPF No.2
BOT CHORD 2x4 HF/SPF No.2
BRACING-
TOP CHORD Structural wood sheathing directly applied or 3-11-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing.
MiTek recommends that Stabilizers and required cross bracing
be installed during truss erection, in accordance with Stabilizer
Installation guide.
REACTIONS. (lb/size) 1=108/3-10-5 (min. 0-1-8), 3=108/3-10-5 (min. 0-1-8)
Max Horz 1=30(LC 13)
Max Uplift1=-15(LC 16), 3=-15(LC 17)
Max Grav 1=122(LC 2), 3=122(LC 2)
FORCES. (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.
NOTES-
1) Unbalanced roof live loads have been considered for this design.
2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp C; enclosed;
MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60
3) TCLL: ASCE 7-10; Pr=20.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pg=20.0 psf (ground snow); Pf=15.4 psf (flat
roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.1
4) Unbalanced snow loads have been considered for this design.
5) Gable requires continuous bottom chord bearing.
6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.
7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3.
8) This truss is designed in accordance with the 2012 International Building Code section 2306.1 and referenced standard ANSI/TPI 1.
LOAD CASE(S) Standard
04/08/19
Mike Sheeks