HomeMy WebLinkAboutWSB 094 - Sewer10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913244
Permit Type Final Subdivision Woods at Shelborne
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
ENGS42014 Section Number
Woods at Shelborne Sec 1 Lot Number
HHM Enterprises, LLC Address Number
16 Zionsville Presbyterian Station Address 2
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
CTRWD WWTP Street
0.34 City
310
Zip Code
County
0.00
Builder
0.00
150.00
Phone Number
1908.00
Owner
0.00
phone Number
0.00
2058.00
Occupant
Phone Number
1
94
3370
Shade Oak Court
Carmel
46032
Hamilton
Pulte Group
317-575-2350
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID: WAS711-WAS710
Grease Trap Slab Foundation USMH WAS -711 WAS -710 DSMH
Grease Interceptor Crawl Space Manhole IDs
Grit Interceptor Basement YES Lid Elevation 910.75 909.26
Grinder Station First Floor Elevation
915.10 V 915.10 ✓
Water Service City of Carmel Basement Elevation 905.30 905.30
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor I 4.35 C 5.84 Ft.
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only
TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached 1/1 Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
Th erns of the conditional permit, if any, are listed below.
Plans have been submitted.
All fees have been paid.
No certificate of insurance required.
No additional permits required.
No manhole core permit required.
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am fami iar with
Builder/ Owner Signature � 1
Printed Name
Approved By
Ryan
Engineer
and agree to accept responsibility for all work done under this permit.
�> Phone Numb
Permit is valid for ONEIYEAR from the date issued. Permit valid only with TriCo
I