Loading...
HomeMy WebLinkAboutM30-2W DU.C. Wine7 8 A B 8"ø 6"ø 12"x10" 6"ø 6"ø 6"ø 14"x12" 10"ø6"ø 8"ø (TYP. OF 3) 8 14"x12" UP TO F-2-30 SR1- 125 SR1- 125 2 SR1- 100 SR1- 55 EG1- 30 SR1- 100 SR1- 40 EG1- 30 2 19 24 T F-2-80 STUDY LAUNDRY LIFT MASTER CLOSET MASTER BATH MASTER BEDROOM 22 4"ø 6"ø 6 7 8 A B EF-2-30 F-2-30 ROOF DECK BONUS ROOM LIFT W.I.C. MECH 2 GUEST BATH FSR2- 125 FSR1- 100 FSR1- 40 FSR1- 70 13 T F-2-30 14 ACCU-1-30 ACCU-2-30 EG1- 30 4"ø 4"ø 4"ø 4"ø 6"ø 6 SR1- 40 ARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 400 INDIANAPOLIS, INDIANA 46204 BLACKLINESTUDIO.NET 317.803.790 M.E.P. GENESIS ENGINEERING GROUP 91 SOUTH MAIN STREET, SUITE 200 ZIONSVILLE, IN 46077 GENESIS-ENGINEERING.COM 317.927.8307 STRUCTURAL SCHWARZ ENGINEERING GROUP WWW.SCHWARZINC.COM 317.850.5133 - - ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. CERTIFICATION: CHECKED: DRAWN: C:\Users\trobinson\Documents\Custom Living Monon on Main Town Homes GEG R18_trobinson.rvt4/5/2019 7:04:44 PM M30-2COPYRIGHT 2018 MECHANICAL THIRD AND FOURTH FLOOR PLANSMonon & Main Brownstones Monon & Main St., Carmel INEECEEC Monon and Main Brownstone Interior Remodel – Unit 30 04/05/2019 Lot 30 -ERNST RESIDENCE 1/4" = 1'-0"1 THIRD FLOOR MECHANICAL PLAN - LOT 30 1/4" = 1'-0"2 FOURTH FLOOR MECHANICAL PLAN - LOT 30 PLAN NOTES (ALL NOTES MAY NOT BE USED ON THIS SHEET) 1 GAS FLUE & COMBUSTION AIR UP. 2 12"x4" UP TO SUPPLY REGISTER IN FLOOR ABOVE. 3 12"x4" UP TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ABOVE. COORDINATE LOCATION WITH FURNITURE PLAN. 4 12"x6" DUCT UP TO SUPPLY REGISTER IN FLOOR ABOVE. 5 12"x4" SUPPLY FROM BELOW TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ON THIS FLOOR. COORDINATE LOCATION WITH FURNITURE PLAN. 6 4'Ø EXHAUST DOWN. 7 GAS FLUE & COMBUSTION AIR INTAKE THROUGH WALL. TERMINATE WITH CONCENTRIC VENT KIT. 8 4"Ø EXHAUST UP. 9 KITCHEN HOOD EXHAUST THROUGH WALL. TERMINATE WITH EXHAUST LOUVER SIZED FOR MINIMUM 700 FT/MIN THROUGH OPENING. 10 KITCHEN VENT HOOD BY OTHERS. DUCT CONNECTION BY MC. DUCT SHALL BE APPROPRIATE FOR GREASE-LADEN VAPORS. 11 4"Ø DRYER VENT THROUGH WALL. TERMINATE WITH WALL CAP. 12 4"Ø DRYER VENT DOWN TO DRYER. 13 GAS FLUE & COMBUSTION AIR INTAKE UP THROUGH ROOF. TERMINATE WITH CONCENTRIC VENT KIT. 15 FIREPLACE VENT DUCT DOWN. VERIFY DUCT CONNECTION SIZE AND LOCATION WITH MANUFACTURER. 16 FIREPLACE VENT THROUGH WALL. TERMINATE WITH WALL CAP. 17 GAS FLUE AND COMBUSTION AIR DOWN. 18 4"Ø EXHAUST DUCT FROM THIRD FLOOR, TRANSITION TO 6"x3", UP IN WALL TO EXHAUST GRILLE. 19 4"Ø DRYER VENT DOWN TO SECOND FLOOR CEILING SPACE BELOW. 20 4"Ø DRYER VENT DUCT UP TO DRYER ON THIRD FLOOR. 21 PROVIDE DRYER EXHAUST BOOSTER FAN SIMILAR TO FANTECH DBF 4XL. 22 12"X10" DUCT DOWN THROUGH FLOOR. 23 12"X10" DUCT UP THROUGH FLOOR. 24 12"x10" UP TO SUPPLY REGISTER IN FLOOR ABOVE. # REVISION Date 05/02/19 Mike Sheeks