Loading...
HomeMy WebLinkAboutP30-5U.C. WineWine7 8 A B 2" V 2" V 2" V 2" V 2" V 2" V 2" V 2" S 2" S 2" S 2" V 2" V 3" S 2" S 1 1/2" S 3" S 3" S 3" S 4" S 4" S 3" S 3" V 2" V2" V 1 1/2" V 1 1/2" V 2" V 2" V 2" S 2" S 2" S 2" S 2" V 2" S 2" V 2" V 3" S 3" S 2" S 2" V 2" V 2" S 3" S 3" S 3" S 3" S 1 1/2" S 3" S 2" V 2" V 2" V 2" V 2" V 2" S 3" S 2" V 2" S 2" V 3" S 3" V 2" S 3" S 2" S 2" S 2" V 2" V 2" V 2" V 3" S 1 1/2" S 2" V 2" V 2" V 2" V 1 1/2" V 2" V 2" V 2" V 2" V 2" V 2" V 1 1/2" S 1 1/2" S 1 1/2" S 2" V 1 1/2" V 1 1/2" S 1 1/2" V 1 1/2" S 2" V 2" V TOILET LAV LAV TUB SHOWER LAV TOILET FLOOR DRIAN SINK WASHER BOX LAV TOILET KITCHEN SINK AIR ADMITTANCE VALVE FLOOR DRSIN SHOWER TOILT LAV 2" S FLOOR DRIAN 2" S ARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 400 INDIANAPOLIS, INDIANA 46204 BLACKLINESTUDIO.NET 317.803.790 M.E.P. GENESIS ENGINEERING GROUP 91 SOUTH MAIN STREET, SUITE 200 ZIONSVILLE, IN 46077 GENESIS-ENGINEERING.COM 317.927.8307 STRUCTURAL SCHWARZ ENGINEERING GROUP WWW.SCHWARZINC.COM 317.850.5133 - - ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. CERTIFICATION: CHECKED: DRAWN: C:\Users\wmaltby\Documents\Custom Living Monon on Main Town Homes GEG R18_wmaltby@genesis-engineering.com.rvt 4/4/2019 9:15:54 AM P30-5COPYRIGHT 2018 PLUMBING FOURTH FLOOR PLANMonon & Main Brownstones Monon & Main St., Carmel INWAMWAM Monon and Main Brownstone Interior Remodel –Unit 30 04/05/2019 Lot 30 -ERNST RESIDENCE 1/4" = 1'-0"1 FOURTH FLOOR SANITARY - LOT 30 2 SANITARY RISER DIAGRAM LOT 30 INSTALL EXTERIOR HOSE BIB # REVISION Date 05/02/19 Mike Sheeks