HomeMy WebLinkAboutM40-2U.C.
Wine7 6
A
B
6"ø
BEDROOM 2
BEDROOM 1
GUEST BATH
HALL
MST CLOSET
MST. BATH
MASTER BEDROOM
LIFT
8
8
FSR2- 125 FSR1- 90
10"x4"
8"x4"
6"ø 6"ø
6"ø
2 2
SR1- 40
SR1- 20
4"ø
4"ø SR1- 20
3
EG1- 30
EG1- 30
4"ø
2
2
SR1- 150 SR1- 100
6"ø
6"ø
6"ø
8"ø 10"ø 10"x12" 8"x14"8
14"x12" UP TO F-2-40
ON FOURTH FLOOR.
14"x12"
T F-2-40
76
A
B
FSR2- 125 FSR1- 100
ACCU-2-40
5
20 CFM
14"x14"
EF-1-40
EG1-30
6
6
6
4"ø
4"ø
4"ø
4"ø
6"ø
14
T
F-2-40
F-2-40
ACCU-1-40
LOFT AREA
W.I.C.
MECH 2
BATH
LIFT
FSR1- 40
FSR1- 70
13
ARCHITECT
BLACKLINE
1 N MERIDIAN ST, SUITE 400
INDIANAPOLIS, INDIANA 46204
BLACKLINESTUDIO.NET
317.803.790
M.E.P.
GENESIS ENGINEERING GROUP
91 SOUTH MAIN STREET, SUITE 200
ZIONSVILLE, IN 46077
GENESIS-ENGINEERING.COM
317.927.8307
STRUCTURAL
SCHWARZ ENGINEERING GROUP
WWW.SCHWARZINC.COM
317.850.5133
-
-
ALL INFORMATION CONTAINED IN THIS DOCUMENT IS
CONSIDERED TO BE BOTH CONFIDENTIAL AND
PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE
STUDIO AND SHALL NOT BE COPIED, REPRODUCED,
DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT
PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO.
UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT
PERMITTED.
CERTIFICATION:
CHECKED:
DRAWN: C:\Users\jfakes\Documents\Custom Living Monon on Main Town Homes GEG R18_jfakes.rvt
4/12/2019 2:00:46 PM M40-2COPYRIGHT 2018 MECHANICAL THIRD AND FOURTH FLOOR PLANSMonon & Main Brownstones
Monon & Main St., Carmel INChecker
Author
Monon and Main Brownstone
Interior Remodel – Unit 40
04/12/2019
Lot 40 -HALLETT RESIDENCE
PLAN NOTES
(ALL NOTES MAY NOT BE USED ON THIS SHEET)
1 GAS FLUE & COMBUSTION AIR UP.
2 12"x4" UP TO SUPPLY REGISTER IN FLOOR ABOVE.
3 12"x4" UP TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ABOVE. COORDINATE LOCATION WITH
FURNITURE PLAN.
4 12"x6" DUCT UP TO SUPPLY REGISTER IN FLOOR ABOVE.
5 12"x4" SUPPLY FROM BELOW TO TOE KICK SUPPLY REGISTER (BY OTHERS) IN CABINET ON THIS FLOOR.
COORDINATE LOCATION WITH FURNITURE PLAN.
6 4'Ø EXHAUST DOWN.
7 GAS FLUE & COMBUSTION AIR INTAKE THROUGH WALL. TERMINATE WITH CONCENTRIC VENT KIT.
8 4"Ø EXHAUST UP.
9 KITCHEN HOOD EXHAUST THROUGH WALL. TERMINATE WITH EXHAUST LOUVER SIZED FOR MINIMUM 700 FT/MIN
THROUGH OPENING.
10 KITCHEN VENT HOOD BY OTHERS. DUCT CONNECTION BY MC. DUCT SHALL BE APPROPRIATE FOR
GREASE-LADEN VAPORS.
11 4"Ø DRYER VENT THROUGH WALL. TERMINATE WITH WALL CAP.
12 4"Ø DRYER VENT DOWN TO DRYER.
13 GAS FLUE & COMBUSTION AIR INTAKE UP THROUGH ROOF. TERMINATE WITH CONCENTRIC VENT KIT.
14 6"Ø EXHAUST UP THROUGH ROOF. TERMINATE WITH ROOF VENT CAP.
15 FIREPLACE VENT DUCT DOWN. VERIFY DUCT CONNECTION SIZE AND LOCATION WITH MANUFACTURER.
16 FIREPLACE VENT THROUGH WALL. TERMINATE WITH WALL CAP.
17 GAS FLUE AND COMBUSTION AIR DOWN.
18 4"Ø EXHAUST DUCT FROM THIRD FLOOR, TRANSITION TO 6"x3", UP IN WALL TO EXHAUST GRILLE.
19 4"Ø DRYER VENT DOWN TO SECOND FLOOR CEILING SPACE BELOW.
20 4"Ø DRYER VENT DUCT UP TO DRYER ON THIRD FLOOR.
21 PROVIDE DRYER EXHAUST BOOSTER FAN SIMILAR TO FANTECH DBF 4XL.
22 12"X10" DUCT DOWN THROUGH FLOOR.
23 12"X10" DUCT UP THROUGH FLOOR.
24 12"x10" UP TO SUPPLY REGISTER IN FLOOR ABOVE.
25 6"Ø EXHAUST DOWN.
26 6"Ø EXHAUST UP.
27 DUCT MOUNT SUPPLY GRILLE OFF SUPPLY DUCT PLENUM.
1/4" = 1'-0"1 THIRD FLOOR MECHANICAL PLAN - LOT 40
1/4" = 1'-0"2 FOURTH FLOOR MECHANICAL PLAN - LOT 40
# REVISION Date
05/02/19
Mike Sheeks