HomeMy WebLinkAboutP40-00PLUMBING SYSTEMS PIPING
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR DOMESTIC WATER
SYSTEMS.
2.1 PIPING MATERIALS
A. POTABLE-WATER PIPING AND COMPONENTS SHALL COMPLY WITH NSF 14 AND NSF 61 -
G. PLASTIC PIPING COMPONENTS SHALL BE MARKED WITH "NSF-PW.", WITH SOLDER
JOINTS.
2.2 COPPER TUBE AND FITTINGS - FOR DOMESTIC WATER SYSTEMS
A. HARD COPPER TUBE: ASTM B 88, TYPE L ASTM B 88M, TYPE B WATER TUBE, DRAWN
TEMPER.
B. SOLDER FILLER METALS: ASTM B 32, LEAD -FREE ALLOYS.
C. FLUX: ASTM B 813, WATER FLUSHABLE.
D. SAFETY VALVES: ASME BOILER AND PRESSURE VESSEL CODE: SECTION VIII,
"PRESSURE VESSELS," CONSTRUCTION; NATIONAL BOARD CERTIFIED, LAB ELED, AND
FACTORY SEALED
1. PRESSURE SETTINGS: HIGHER THAN DISCHARGE PRESSURE AND SAME OR
LOWER THAN RECEIVER PRESSURE RATING.
2.3 CPVC PIPE AND FITTINGS - FOR DOMESTIC WATER SYSTEMS
A. CPVC PIPE: ASTM F 441/F 441M, SCHEDULE 80.
B. CPVC SOCKET FITTINGS: ASTM F 439 FOR SCHEDULE 80.
C. CPVC THREADED FITTINGS: ASTM F 437, SCHEDULE 80.
3.1 PIPING INSTALLATION
A. ALL PLUMBING AND PIPING SYSTEMS SHALL BE INSTALLED PER THE LOCAL AND STATE
PLUMBING CODE, WITH NO EXCEPTIONS.
B. INSTALL COPPER TUBING ACCORDING TO CDA'S "COPPER TUBE HANDBOOK."
C. INSTALL ALL FIXTURES, DRAINS AND EQUIPMENT COMPLETE TO CREAT E A COMPLETE
AND OPERATIONAL SYSTEM. THIS CONTRACTOR SHALL PROVIDE AND INS TALL ALL
MATERIALS AND ACCESSORIES AS REQUIRED AS PART OF THIS CONTRACT.
D WHEN INSTALLING PIPING ADJACENT TO EQUIPMENT AND MACHINES, ALLOW SPACE
FOR SERVICE AND MAINTENANCE.
E. CONNECT DOMESTIC WATER PIPING TO WATER -SERVICE PIPING WITH S HUTOFF
VALVE; EXTEND AND CONNECT TO THE FOLLOWING:
1. WATER HEATERS: COLD -WATER INLET AND HOT -WATER OUTLET PIPIN G IN SIZES
INDICATED, BUT NOT SMALLER THAN SIZES OF WATER HEATER CONNECTIONS..
2. PLUMBING FIXTURES: COLD - AND HOT -WATER -SUPPLY PIPING IN SI ZES
INDICATED, BUT NOT SMALLER THAN THAT REQUIRED BY PLUMBING COD E.
3. EQUIPMENT: COLD - AND HOT -WATER -SUPPLY PIPING AS INDICATED, BUT NOT
SMALLER THAN EQUIPMENT CONNECTIONS. PROVIDE SHUTOFF VALVE AN D UNION
FOR EACH CONNECTION. USE FLANGES INSTEAD OF UNIONS FOR NPS 2-1/2 AND
LARGER.
3.2 FIELD QUALITY CONTROL
A. PERFORM FIELD TESTS AND INSPECTIONS.
B. TESTS AND INSPECTIONS:
1. PIPING LEAK TESTS: TEST NEW AND MODIFIED PARTS OF EXISTING PIPING. CAP
AND FILL WITH WATER AT A PRESSURE OF 50 PSIG ABOVE SYSTEM OPE RATING
PRESSURE, BUT NOT LESS GREATER THAN 125 PSIG. ISOLATE TEST S OURCE AND
LET STAND FOR THIRTY MINUTES; HOLD FOR TWO HOURS WITH NO DROP IN
PRESSURE.
2. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.
STORM, SANITARY WASTE AND VENT SYSTEMS PIPING
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR SANITARY WASTE AND
VENT AND STORM WATER DRAINAGE SYSTEMS.
1.2 PERFORMANCE REQUIREMENTS
A. COMPONENTS AND INSTALLATION SHALL BE CAPABLE OF WITHSTANDING THE
FOLLOWING MINIMUM WORKING PRESSURE UNLESS OTHERWISE INDICATED:
1. SOIL, WASTE, AND VENT PIPING: 10 -FOOT HEAD OF WATER
1.3 QUALITY ASSURANCE
A. PIPING MATERIALS SHALL BEAR LABEL, STAMP, OR OTHER MARKINGS OF SPECIFIED
TESTING AGENCY.
B. COMPLY WITH NSF/ANSI 14, "PLASTICS PIPING SYSTEMS COMPONENTS AND RELATED
MATERIALS," FOR PLASTIC PIPING COMPONENTS. INCLUDE MARKING WI TH "NSF-DWV"
FOR PLASTIC DRAIN, WASTE, AND VENT PIPING AND "NSF-SEWER" FOR PLASTIC SEWER
PIPING.
2.1 PVC PIPE AND FITTINGS
A. SOLID -WALL PVC PIPE: ASTM D 2665, DRAIN, WASTE, AND VENT.
B. CELLULAR -CORE PVC PIPE: ASTM F 891, SCHEDULE 40.
C. PVC SOCKET FITTINGS: ASTM D 2665, MADE TO ASTM D 3311, DRAI N, WASTE, AND VENT
PATTERNS AND TO FIT SCHEDULE 40 PIPE.
D. ADHESIVE PRIMER: ASTM F 656.
3.2 PIPING INSTALLATION
A. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOC ATION AND
ARRANGEMENT OF PIPING SYSTEMS. INSTALL PIPING AS INDICATED UN LESS
DEVIATIONS TO LAYOUT ARE REQUIRED BY BUILDING CONSTRUCTION. INDICATE
DEVIATIONS ON COORDINATION DRAWINGS. SUBMIT AS -BUILT DRAWINGS TO CUSTOM
LIVING OWNER PRIOR TO CERTIFICATE OF OCCUPANCY.
B. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS OTHERWISE INDICATED AND
EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS.
C. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND
SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL
RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE.
D. INSTALL PIPING TO PERMIT VALVE SERVICING.
E. INSTALL PIPING AT INDICATED SLOPES.
F. INSTALL PIPING FREE OF SAGS AND BENDS.
G. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH CONNECTIONS.
H. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
I. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VE NT PIPING
USING APPROPRIATE BRANCHES, BENDS, AND LONG-SWEEP BENDS. SANI TARY TEES
AND SHORT-SWEEP 1/4 BENDS MAY BE USED ON VERTICAL STACKS IF CH ANGE IN
DIRECTION OF FLOW IS FROM HORIZONTAL TO VERTICAL. USE LONG-TU RN, DOUBLE Y-
BRANCH AND 1/8 -BEND FITTINGS IF TWO FIXTURES ARE INSTALLED BAC K TO BACK OR
SIDE BY SIDE WITH COMMON DRAIN PIPE. STRAIGHT TEES, ELBOWS, AND CROSSES
MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MO RE THAN 90
DEGREES. USE PROPER SIZE OF STANDARD INCREASERS AND REDUCERS IF PIPES OF
DIFFERENT SIZES ARE CONNECTED. REDUCING SIZE OF DRAINAGE PIPI NG IN
DIRECTION OF FLOW IS PROHIBITED.
J. LAY BURIED BUILDING DRAINAGE PIPING BEGINNING AT LOW POINT O F EACH SYSTEM.
INSTALL TRUE TO GRADES AND ALIGNMENT INDICATED, WITH UNBROKEN CONTINUITY
OF INVERT. PLACE HUB ENDS OF PIPING UPSTREAM. INSTALL REQUIRED GASKETS
ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LU BRICANTS,
CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. MAINTAIN SWAB IN PIPING AND
PULL PAST EACH JOINT AS COMPLETED.
K. INSTALL SOIL AND WASTE DRAINAGE AND VENT PIPING AT THE FOLLO WING MINIMUM
SLOPES UNLESS OTHERWISE INDICATED:
1. BUILDING SANITARY DRAIN: 2 PERCENT DOWNWARD IN DIRECTION O F FLOW FOR
PIPING NPS 3 AND SMALLER; DOWNWARD IN DIRECTION OF FLOW FOR P IPING
NPS 4 AND LARGER.
2. HORIZONTAL SANITARY DRAINAGE PIPING: 2 PERCENT DOWNWARD IN DIRECTION
OF FLOW.
3. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT O R TOWARD
VENT STACK.
L. INSTALL ABOVEGROUND PVC PIPING ACCORDING TO ASTM D 2665.
M. INSTALL UNDERGROUND PVC PIPING ACCORDING TO ASTM D 2321.
N. DO NOT ENCLOSE, COVER, OR PUT PIPING INTO OPERATION UNTIL IT IS INSPECTED
AND APPROVED BY AUTHORITIES HAVING JURISDICTION.
O. INSTALL SLEEVES FOR PIPING PENETRATIONS OF WALLS, CEILINGS, AND FLOORS.
COMPLY WITH REQUIREMENTS FOR SLEEVES SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING."
P. INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF CONCRETE WALLS AND SLABS.
COMPLY WITH REQUIREMENTS FOR SLEEVE SEALS SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING." INSTALL ESCUTCHEONS FOR
PIPING PENETRATIONS OF WALLS,.
3.3 JOINT CONSTRUCTION
A. JOIN COPPER TUBE AND FITTINGS WITH SOLDERED JOINTS ACCORDING TO
ASTM B 828. USE ASTM B 813, WATER -FLUSHABLE, LEAD -FREE FLUX AND ASTM B 32,
LEAD -FREE -ALLOY SOLDER.
B. PLASTIC, NONPRESSURE-PIPING, SOLVENT-CEMENT JOINTS: CLEAN AND DRY JOINING
SURFACES. JOIN PIPE AND FITTINGS ACCORDING TO THE FOLLOWING:
1. COMPLY WITH ASTM F 402 FOR SAFE -HANDLING PRACTICE OF CLEANERS,
PRIMERS, AND SOLVENT CEMENTS.
2. PVC PIPING: JOIN ACCORDING TO ASTM D 2855 AND ASTM D 2665 APPENDIXES.
3.4 HANGER AND SUPPORT INSTALLATION
A. COMPLY WITH REQUIREMENTS FOR PIPE HANGER AND SUPPORT DEVICES AND
INSTALLATION SPECIFIED IN DIVISION 22 SECTION "HANGERS AND SUP PORTS FOR
PLUMBING PIPING AND EQUIPMENT."
1. INSTALL CARBON-STEEL PIPE HANGERS FOR HORIZONTAL PIPING IN
NONCORROSIVE ENVIRONMENTS.
2. INSTALL CARBON-STEEL PIPE SUPPORT CLAMPS FOR VERTICAL PIPIN G IN
NONCORROSIVE ENVIRONMENTS.
3. VERTICAL PIPING: MSS TYPE 8 OR TYPE 42, CLAMPS.
4. INSTALL INDIVIDUAL, STRAIGHT, HORIZONTAL PIPING RUNS:
A. 100 FEET AND LESS: MSS TYPE 1, ADJUSTABLE, STEEL CLEVIS H ANGERS.
B. LONGER THAN 100 FEET: MSS TYPE 43, ADJUSTABLE ROLLER HANGERS.
B. SUPPORT VERTICAL PIPING AND TUBING AT BASE AND AT EACH FLO OR.
B. INSTALL HANGERS FOR CAST -IRON SOIL PIPING WITH THE FOLLOWING MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1 -1/2 AND NPS 2: 60 INCHES WITH 3/8-INCH ROD.
2. NPS 3: 60 INCHES WITH 1/2 -INCH ROD.
3. NPS 4 AND NPS 5: 60 INCHES WITH 5/8-INCH ROD.
D. INSTALL HANGERS FOR COPPER TUBING WITH THE FOLLOWING MAXIMUM HORIZONTAL
SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1 -1/4: 72 INCHES WITH 3/8-INCH ROD.
2. NPS 1 -1/2 AND NPS 2: 96 INCHES WITH 3/8-INCH ROD.
3. NPS 2-1/2: 108 INCHES WITH 1/2 -INCH ROD.
4. NPS 3: 10 FEET WITH 1/2 -INCH ROD.
G. INSTALL SUPPORTS FOR VERTICAL PVC PIPING EVERY 48 INCHES.
H. SUPPORT PIPING AND TUBING NOT LISTED ABOVE ACCORDING TO MSS SP -69 AND
MANUFACTURER'S WRITTEN INSTRUCTIONS.
3.5 CONNECTIONS
A CONNECT DRAINAGE AND VENT PIPING TO THE FOLLOWING:
1. PLUMBING FIXTURES: CONNECT DRAINAGE PIPING IN SIZES INDICATED, BUT NOT
SMALLER THAN REQUIRED BY PLUMBING CODE.
2. PLUMBING FIXTURES AND EQUIPMENT: CONNECT ATMOSPHERIC VENT PIPING IN
SIZES INDICATED, BUT NOT SMALLER THAN REQUIRED BY AUTHORITIES HAVING
JURISDICTION.
3. PLUMBING SPECIALTIES: CONNECT DRAINAGE AND VENT PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN REQUIRED BY PLUMBING CODE.
4. INSTALL TEST TEES (WALL CLEANOUTS) IN CONDUCTORS NEAR FLOOR AND
FLOOR CLEANOUTS WITH COVER FLUSH WITH FLOOR.
3.6 IDENTIFICATION OF MAINS
A. IDENTIFY EXPOSED SANITARY WASTE AND VENT PIPING.
3.7 FIELD QUALITY CONTROL
A. DURING INSTALLATION, NOTIFY AUTHORITIES HAVING JURISDICTION AT LEAST 24
HOURS BEFORE INSPECTION MUST BE MADE. PERFORM TESTS SPECIFIED BELOW IN
PRESENCE OF AUTHORITIES HAVING JURISDICTION.
1. ROUGHING-IN INSPECTION: ARRANGE FOR INSPECTION OF PIPING BEFORE
CONCEALING OR CLOSING-IN AFTER ROUGHING-IN AND BEFORE SETTING
FIXTURES.
2. FINAL INSPECTION: ARRANGE FOR FINAL INSPECTION BY AUTHORITIES HAVING
JURISDICTION TO OBSERVE TESTS SPECIFIED BELOW AND TO ENSURE
COMPLIANCE WITH REQUIREMENTS.
B. REINSPECTION: IF AUTHORITIES HAVING JURISDICTION FIND THAT PIPING WILL NOT
PASS TEST OR INSPECTION, MAKE REQUIRED CORRECTIONS AND ARRANGE FOR
REINSPECTION.
C. REPORTS: PREPARE INSPECTION REPORTS AND HAVE THEM SIGNED BY AUTHORITIES
HAVING JURISDICTION.
D. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF
AUTHORITIES HAVING JURISDICTION. OR, IN ABSENCE OF PUBLISHED PROCEDURES,
AS FOLLOWS:
1. TEST FOR LEAKS AND DEFECTS IN NEW PIPING AND PARTS OF EXIST ING PIPING
THAT HAVE BEEN ALTERED, EXTENDED, OR REPAIRED. IF TESTING IS PERFORMED
IN SEGMENTS, SUBMIT SEPARATE REPORT FOR EACH TEST, COMPLETE WITH
DIAGRAM OF PORTION OF PIPING TESTED.
2. LEAVE UNCOVERED AND UNCONCEALED NEW, ALTERED, EXTENDED, OR
REPLACED DRAINAGE AND VENT PIPING UNTIL IT HAS BEEN TESTED AN D
APPROVED. EXPOSE WORK THAT WAS COVERED OR CONCEALED BEFORE IT WAS
TESTED.
3. ROUGHING-IN PLUMBING TEST PROCEDURE: TEST DRAINAGE AND VEN T PIPING
EXCEPT OUTSIDE LEADERS ON COMPLETION OF ROUGHING-IN. CLOSE O PENINGS
IN PIPING SYSTEM AND FILL WITH WATER TO POINT OF OVERFLOW, BU T NOT LESS
THAN 10 -FOOT HEAD OF WATER. FROM 15 MINUTES BEFORE INSPECTION STARTS
TO COMPLETION OF INSPECTION, WATER LEVEL MUST NOT DROP. INSP ECT
JOINTS FOR LEAKS.
4. FINISHED PLUMBING TEST PROCEDURE: AFTER PLUMBING FIXTURES HAVE BEEN
SET AND TRAPS FILLED WITH WATER, TEST CONNECTIONS AND PROVE THEY ARE
GASTIGHT AND WATERTIGHT. PLUG VENT -STACK OPENINGS ON ROOF AN D
BUILDING DRAINS WHERE THEY LEAVE BUILDING. INTRODUCE AIR INT O PIPING
SYSTEM EQUAL TO PRESSURE OF 1 -INCH WG. USE U-TUBE OR MANOMETER
INSERTED IN TRAP OF WATER CLOSET TO MEASURE THIS PRESSURE. AIR
PRESSURE MUST REMAIN CONSTANT WITHOUT INTRODUCING ADDITIONAL AIR
THROUGHOUT PERIOD OF INSPECTION. INSPECT PLUMBING FIXTURE
CONNECTIONS FOR GAS AND WATER LEAKS.
5. REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPI NG, OR
PORTION THEREOF, UNTIL SATISFACTORY RESULTS ARE OBTAINED.
6. PREPARE REPORTS FOR TESTS AND REQUIRED CORRECTIVE ACTION.
3.8 CLEANING AND PROTECTION
A. CLEAN INTERIOR OF PIPING. REMOVE DIRT AND DEBRIS AS WORK PR OGRESSES.
B. PROTECT DRAINS DURING REMAINDER OF CONSTRUCTION PERIOD TO AVOID
CLOGGING WITH DIRT AND DEBRIS AND TO PREVENT DAMAGE FROM TRAFF IC AND
CONSTRUCTION WORK.
C. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY AND WHEN WORK
STOPS.
ARCHITECT
BLACKLINE
1 N MERIDIAN ST, SUITE 400
INDIANAPOLIS, INDIANA 46204
BLACKLINESTUDIO.NET
317.803.790
M.E.P.
GENESIS ENGINEERING GROUP
91 SOUTH MAIN STREET, SUITE 200
ZIONSVILLE, IN 46077
GENESIS-ENGINEERING.COM
317.927.8307
STRUCTURAL
SCHWARZ ENGINEERING GROUP
WWW.SCHWARZINC.COM
317.850.5133
-
-
ALL INFORMATION CONTAINED IN THIS DOCUMENT IS
CONSIDERED TO BE BOTH CONFIDENTIAL AND
PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE
STUDIO AND SHALL NOT BE COPIED, REPRODUCED,
DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT
PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO.
UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT
PERMITTED.
CERTIFICATION:
CHECKED:
DRAWN: C:\Users\jfakes\Documents\Custom Living Monon on Main Town Homes GEG R18_jfakes.rvt
4/12/2019 2:00:55 PM P40-00COPYRIGHT 2018 PLUMBING SPECIFICATIONS
Monon & Main Brownstones
Monon & Main St., Carmel INWAMWAM
Monon and Main Brownstone
Interior Remodel –Unit 40
04/12/2019
Lot 40 -HALLETT RESIDENCE
# REVISION Date
05/02/19
Mike Sheeks