HomeMy WebLinkAboutP40-1W D76 A B 3" V 3" V 4" S 4" S 4" S 4" S 2" S 3" S 3" S 3" S 2" V 3" S 2" S 2" S 2" S A. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS) ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ALL CONFLICTS SHALL BE BROUGHT TO THE ARCHITECTS OR ENGINEERS ATTENTION IN ORDER TO ALLOW A CLARIFICATION TO BE ISSUED. ANY WORK COMPLETED WITHOUT THE CLARIFYING INFORMATION IS AT THE CONTRACTORS FINANCIAL RISK. B. THE CONTRACTOR SHALL PROVIDE AND FURNISH ALL MATERIALS AND ACCESSORIES TO CREATE A FULLY OPERATIONAL, CODE COMPLIANT AND TESTED SYSTEM. ALL MATERIALS AND ACCESSORIES REQUIRED TO CREATE THE FULLY OPERATIONAL SYSTEM SHALL BE INCLUDED IN THE COST OF THIS PROJECT. C. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR MAY AT THEIR OPTION MODIFY THE PIPE ROUTING IN ORDER TO CREATE A SYSTEM THAT MEETS THE INTENT OF THIS SET OF CONSTRUCTION DOCUMENTS. D. THE CONTRACTOR SHALL INCLUDE ALL ITEMS THAT ARE REQUIRED TO ENSURE THAT THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH THE APPLICABLE CODES, AND MANUFACTURES INSTALLATION RECOMMENDATIONS AND OR REQUIREMENTS. E. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS AND/OR STRUCTURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTION SYSTEMS SHALL BE PROVIDED AS PART OF THE SCOPE OF THIS PROJECT. F. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY WAY WITHOUT THE STRUCTURAL ENGINEERS REVIEW AND PRIOR WRITTEN APPROVAL. G. PROVIDE FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS. FIRE STOPPING MATERIALS AND METHODS SHALL BE PER LOCAL AND STATE CODES AND REQUIREMENTS. H. ALL PLUMBING SYSTEMS SHALL BE INSTALLED PER THE CURRENT PLUMBING CODE FOR THE LOCATION OF THE WORK BEING INSTALLED. I. ALL PLUMBING EQUIPMENT, PIPING, FIXTURES, AND PIPE ACCESSORIES SHALL BE NSF 61, ANNEX G COMPLIANT. J. ALL PIPING LOCATED WITHIN A RETURN AIR PLENUM SHALL COMPLY WITH A 25/50 FLAME SMOKE RATING. ANY EXISTING PIPING DISCOVERED WITHIN A RETURN AIR PLENUM THAT DOES NOT COMPLY WITH THIS REQUIREMENT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR FURTHER CLARIFICATION. K. ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WATER AND WEATHER TIGHT BY THE APPROPRIATE TRADE COMPETENT IN COMPLETING THIS WORK. THE COST OF THIS WORK SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT. L. ALL VENT THROUGH ROOF (VTR) LOCATIONS SHALL BE FIELD VERIFIED IN REGARDS TO ANY OUTDOOR INTAKE. LOCATION OF VTR SHALL BE NO LESS THAN AS REQUIRED BY THE LOCAL OR STATE CODES. M. DO NOT ATTACH ANY CONSTRUCTION TO THE ROOF DECK JOIST BRIDGING, JOIST CROSS BRACING, PIPING, CONDUIT, DUCTWORK OR ANY OTHER NON-STRUCTURAL ITEM. N. DO NOT WELD OR DRILL INTO STRUCTURAL STEEL OR JOIST; INSTEAD USE CLAMPS, TIE WIRE, THRU - BOLTS WITH WASHERS O. DO NOT USE ANY PVC, PLASTIC, ETC. IN PLENUM OR DEMISING WALLS UNLESS FIRE WRAPPED. ALL WOOD BLOCKING AND NAILERS, CONCEALED OR NOT SHALL BE FIRE RETARDANT TREATED. P. DO NOT PENETRATE BUILDING WALLS FOR ANY DUCTING OR VENTING; ROUTE THROUGH ROOF USING LANDLORDS ROOFING CONTRACTOR. Q. VENT THROUGH ROOF INSTALLATION; ALL ROOFING WORK SHALL BE COMPLETED BY THE LANDLORDS ROOFING CONTRACTOR. THE COST SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT. R. PIPING BELOW GROUND SHALL BE SERVICE-WEIGHT CAST IRON OR SCHEDULE 40 PVC. NO -HUB PIPING OR FERNCO CONNECTIONS ARE NOT PERMITTED BELOW GRADE. S. DOMESTIC WATER PIPING ABOVE GRADE SHALL BE TYPE "L" WATER TUBE. T. ALL PIPING SHALL BE PROPERLY SUSPENDED BY THE STRUCTURE PER THE LOCAL CODES. U. NO SANITARY WASTE OR VENT, HOT OR COLD WATER SHALL BE ALLOWED TO BE INSTALLED IN THE DEMISING WALLS. V. ALL PIPING INSULATED SHALL BE WITH PLENUM RATED MATERIALS. W. FLOOR DRAINS SHALL BE PROVIDED WITH TRAP PRIMERS. X. GAS PIPING SUPPORTED ON THE ROOF SHALL BE PROVIDED FREE FLOATING PREFABRICATED SUPPORTS OR EQUIPMENT SUPPORTS WITH ROLLER ASSEMBLIES. WOOD SUPPORTS WILL NOT BE PERMITTED. Y. ALL GAS PIPING SHALL BE PROVIDED PIPE LABELS IDENTIFYING THE GAS PRESSURE. Z. ALL GAS PIPING SHALL BE INSTALLED PER THE LOCAL CODES FOR MATERIALS AND INSTALLATIONS REQUIREMENTS. AA. ALL SHUT -DOWN OF UTILITIES AND FIRE PROTECTION SYSTEMS SHALL BE ARRANGED WITH NO LESS THAN SEVEN (7) DAYS NOTICE TO THE LANDLORD. WORK MAY NOT COMMENCE UNLESS WRITTEN APPROVAL IS PROVIDED BY THE OWNER. BB. ALL DOMESTIC WATER BRANCH PIPES SERVING FIXTURES OR EQUIPMENT WITH FAST ACTING OR ELECTRONIC VALVES SHALL BE PROVIDED WATER HAMMER ARRESTORS. CC. ALL BRANCH PIPES FROM DOMESTIC WATER MAINS SHALL BE PROVIDED QUARTER TURN FULL PORT BALL VALVES ON THE BRANCH PIPE JUST ADJACENT TO THE MAIN. GENERAL NOTES (REQUIRED TO COMPLETE THE SCOPE OF WORK) ARCHITECT BLACKLINE 1 N MERIDIAN ST, SUITE 400 INDIANAPOLIS, INDIANA 46204 BLACKLINESTUDIO.NET 317.803.790 M.E.P. GENESIS ENGINEERING GROUP 91 SOUTH MAIN STREET, SUITE 200 ZIONSVILLE, IN 46077 GENESIS-ENGINEERING.COM 317.927.8307 STRUCTURAL SCHWARZ ENGINEERING GROUP WWW.SCHWARZINC.COM 317.850.5133 - - ALL INFORMATION CONTAINED IN THIS DOCUMENT IS CONSIDERED TO BE BOTH CONFIDENTIAL AND PROPRIETARY INTELLECTUAL PROPERTY OF BLACKLINE STUDIO AND SHALL NOT BE COPIED, REPRODUCED, DISTRIBUTED OR ASSIGNED TO A THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF BLACKLINE STUDIO. UNAUTHORIZED USE OF THESE DOCUMENTS IS NOT PERMITTED. CERTIFICATION: CHECKED: DRAWN: C:\Users\jfakes\Documents\Custom Living Monon on Main Town Homes GEG R18_jfakes.rvt 4/12/2019 2:00:58 PM P40-1COPYRIGHT 2018 PLUMBING FOUNDATION PLANMonon & Main Brownstones Monon & Main St., Carmel INWAMWAM Monon and Main Brownstone Interior Remodel – Unit 40 04/12/2019 Lot 40 -HALLETT RESIDENCE 1/4" = 1'-0"1 FOUNDATION SANITARY - LOT 40 # REVISION Date 05/02/19 Mike Sheeks