HomeMy WebLinkAboutCorrespondence PLATINUM PROPERTIES MANAGEMENT CO., LLC.
9757 Westpoint Drive, Suite 600
Indianapolis, IN 46256 ' -
Phone: 818-2900 Fax: 863-2055 J U L 1 5' 2019
Letter of Transmittal
To: City of Carmel Date: July 11, 2019
Department of Community Services ATTN: Angie Conn
One Civic Square Project: Hampstead Garden
Carmel, Indiana 46032 RE: Plat Filing Fee
From: Ed Fleming
We are sending you ® attached ❑ under separate cover via personal delivery the documents as listed:
COPIES DESCRIPTION
1 Check #10869 for Filing Fee ($2,827.00)
1 Email of Filing Fee
these are transmitted for your action as indicated below:
❑ for your use and/or file ❑ returned for corrections
❑ for review & comment ❑ please sign &return original and copies
® as requested ❑ Retain one copy for your file
❑ approved as noted ❑
REMARKS:
copy to signed
If enclosures are not as noted,kindly notify us immediately.
URVEYOR'S OFFS
C
7�enton C. Ward, CYF7Vl
Surveyor of Namilton County
'h0ae (317) 776-9495
Fax (317) 776-9629
Hampstead Garden Developer LLC
ATTN: Tim Walter
9757 Westpoint Drive, Suite 600
Indianapolis, IN 46256
RE: Hampstead Garden Secondary Plat
Dear Mr. Walter
Suite r88
One .71-
amilton County Square
.Noblesville, Indiana 46o6o-223o
June 17, 2019
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on June 15th, 2019, for this project and have the following comments:
1. The project falls in the incorporated area and MS4 jurisdiction of the City of Carmel.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in the Williams Creek Watershed
4. A Petition will be needed to establish a new arm of the Williams Creek Regulated Drain.
5. With the construction plans, please submit the following procedural items: Petition for
Regulated Drain Subdivision, Subdivision Outlet Permit, engineer's estimate, and all
associated bonds for 120% of construction cost. The bonding includes storm sewers and
monumentation.
6. The Storm sewer design will need to comply with the Hamilton County Stormwater
Management Technical Standards Manual. (HCSMTSM)
7. There is evidence of a field tile running from the west side of the plat. There is currently
a build-up of water where this tile is located. At this time, the Office of the Surveyor
recommends installing a drain to intercept the water current flowing towards the defunct
tile drain. This will help avoid a drainage problem on lot 1.
8. Any private tile drains discovered during construction will need to be tied into regulated
drainage system. Please add a note to this effect to the plans.
9. A site visit will need to be conducted with the developer to determine appropriate vehicle
accessibility to the Clay Creek outlet for maintenance.
10. Please submit complete construction plans and drainage calculations to this office when
they become available.
11. A historic corner marker is located on this property and will need to be brought up to
current grade -level. For guidance on how to do this, you may contact Brian Rayt at 317-
776-8495 or survevor@hamiltoncounty.in.gov
Should you have any questions, I can be reached at samuel.clarlc@hamiltoncounty.in.gov
Sincerely,
Sam Clark
Plan Reviewer
CC: Jim Rinehart-V3 Properties
Tony Strickland-V3 Companies LLC
Alexia Lopez -Carmel Planning
Rachel Keesling-Carmel Planning
Alex Jordan -Carmel Engineering
John Thomas —Carmel Engineering
Angie Conn -Carmel DOCS
Daren Mindham-Carmel Urban Forestry