Loading...
HomeMy WebLinkAbout190523 PURE Pharmacy Permit 17-M20SPLIT SYSTEM SCHEDULE MFR. AND MODEL N0. NOMINAL SA OSA COOLING CAPACITY HEATING CAPACITY ELECTRICAL A X. SENSIBLE TOTAL EER/SEER INPUT OUTPUT EVAP. FAN COMPRESSORS CONDENSER FAN MINCIRCUIT MARK TONS CFM CFM OPWETR. REMARKS VOLT PH. HP UFC RLA URA OLT. HE FDA AMPS FURNACE/CU EVAPORATOR COIL ( ) (MBH) (MBH) (MBH) USE F-1 YORK _ - 1655 400 - - -/13.3 120.0 116.0 115 1 1.0 - - - - - - 16.6 156 OOOO TM9V120D20MP11 CU-1 YORK CM60DBAA1 5 - - 42.0 56.5 1L5/1375 - - 208 3 - 1 15.9 110.0 1 1/4 1.3 212 250/98 COO© TCD6OB31S F-2 YORE TORE100C20M P11 _ - 1380 400 - - -/14.3 100.0 95.0 115 1 .75 - - - - - - 10.9 145 OOOO CU-2 YORK CM48CBAA1 4C - - 33.6 47.0 12.5/15.0 - - 208 3 - 1 13.7 83.1 1 1/4 1.3 18.4 200/60 COO© CD48831S O1 LOW AMBIENT CONTROL TO 0' O PROVIDE 5 YEAR COMP. WARRANTY O PROVIDE 1" THICK THROWAWAY FILTERS O4 PROVIDE VIBRATION ISOLATORS FOR SUSPENDED OR FLOOR MOUNTING (AS REQUIRED) O SYSTEM RATED 0 AIR CONDITIONS 80' LEE, 67' EYJB, 95 AMBIENT O COMPLETE WITH ALL FACTORY SAFETY & OPERATING CONTROLS AS REQUIRED- MOUNTING OF UNITS SHALL BE AS REQUIRED W/MINIMAL IMPACT TO EXISTING STRUCTURE O LOW AMBIENT PRESSURE SWITCH, CRANKCASE HEATER, EVAPORATOR FREEZE THERMOSTAT, START ASSIST CAPACITOR AND RELAY, FOR OUTDOOR UNIT. STANDARD FILTER RACK KIT FOR INDOOR UNIT. AIR BALANCE SCHEDULE PLAN MARK EXHAUST INTAKE/MUA/FA EXHAUST 755 - F-1 - 350 F-2 - 500 NET EXHAUST 755 - NET SUPPLY - 850 GROSS SPACE PRESSURE +95 FAN SCHEDULE NI UNIT MANUFACTURER MODEL CF PRESSURE DROP DROP DRIVE WATTS RPM VOLTAGE CONTROL IBM, $ COMMENTS INCHES EF-1 GREENHECK G-075HP 285 1/4" DIRECT 300 VARIABLE 120 SWATCH WLL 128 RUNS CONTINUOUSLY -VGWALL EF-2 GREENHECK G-08GHP 410 1/4" DIRECT 400 VARIABLE 120 SWITCH 113 RUNS CONTINUOUSLY EF-3 GREENHECK V050 60 1/4" DIRECT 100 1550 120 WLL SWATCH 121 USED INTERMITTENTLY AIR DEVICE SCHEDULE MARK SERVICE TYPE MODULE FACE SIZE BACKPAN/ DUCT SIZE MFGR. & MOD. N0. BORDER TYPE PATTERN NOTES COMMENTS A SUPPLY SQUARE 24" X 24" 18" X 18" TITUS TDCA 3 - LAY -IN AS NOTED 2,4,7 B SUPPLY SQUARE 12" X 12" 9" X 9" TITUS TDCA 3 - LAY -IN AS NOTED 2,4,7 C SUPPLY SQUARE 24" X 24" 18" X 181, TITUS TDCA 1 - SURFACE AS NOTED 2,4,5,7 D SUPPLY SQUARE 12" X 12" 9" X 9" TITUS TDCA 1 - SURFACE AS NOTED 2,4,5,7 HP SUPPLY RECTANGLE 48" X 24" - PRICE LFDCSS - - _ PROVIDED BY OTHERS HEPA FILTRATION BORDER CORE AREA E RETURN/EXHAUST SQUARE 24" X 24" SEE PLAN TITUS 50F 3 - LAY -IN - 7,9 F RETURN/EXHAUST SQUARE 12" X 12" SEE PLAN TITUS 50F 3 - LAY -IN - 7,9 G RETURN/EXHAUST SQUARE 24" X 24" SEE PLAN TITUS DOE 1 - SURFACE - 7,9 H RETURN/EXHAUST SQUARE 12" X 12" SEE PLAN TITUS 5OF 1 - SURFACE - 7,9 LW RETURN SQUARE 12" X 4" SEE PLAN PRICE _ - - PROVIDED BY OTHERS NOTES: 1, PROVIDE WITH AG-35-AA OPPOSED BLADE VOLUME DAMPER (RECT. 272RL & 23RL) 2, PROVIDE WITH MODEL EG EQUALIZING GRID 3, PROVIDE WITH MODEL AG-95 OPPOSED BLADE VOLUME DAMPER (SQUARE) 4. PROVIDE WITH MODEL AG-75 OPPOSED BLADE VOLUME DAMPER (ROUND) 5. PROVIDE WITH TRM PLASTER FRAME 6. PROVIDE WITH RUSKIN MODEL CFD FIRE DAMPER /. LIMIT FLEXIBLE DUCT CONNECTION TO 5'-0" MAXIMUM 8. PROVIDE PREFAB PLASTER FRAME FOR MOUNTING 9. PROVIDE WITH MODEL AG-15-AA VOLUME DAMPER (RETURN RECT. 50F) DIFFUSER A 400 6"m AIR QUANTITY CFM FLEXIBLE DUCT CONNECTION SIZE REGISTER TYPE D 1200 16X16 AIR QUANTITY (CFM) CORE AREA SONICU MONITORING HARDWARE MARK HARDWARE DETAILS QUANTITY COMMENTS A MVP GATEWAY ETHERNET W/ CELL FAILOVER 1 DATA GATEWAY DEVICE FOR REMOTE SENSORS 90OMHZ TO LOCAL ETHERNET WITH CELLULAR 4G FAILOVER ROOM CONDITION MONITOR W/ INTEGRATED VISUAL DISPLAY. REQUIRES 12VDC. WALL ADAPTER AND B ARC 440-900 4 HAS INTERNAL RECHARGEABLE BATTERY FOR BACKUP POWER. 4 PORTS FOR DIGITAL PROBES. C MODULUS CABLE (ARC TO HMI SCREEN) 4 PROBE: DIGITAL PRESSURE DIFFERENTIAL W/ D EST CALIBRATION CERTIFICATE 4 PRESSURE WALL/CEILING SENSOR W/ E 8' PVC TUBING 8 F PROBE: DIGITAL TMEP & HUMIDITY SENSOR W NIST CALIBRATION CERTIFICATE 4 G LOW VOLTAGE CABLE: 25' EXTENTION 8 H POWER ADAPTER EXTENTION CABLE: 12' 4 POWER WALL ADAPTER: 12VDC 5 CLASS 2, UL RATED. NOTES: 1. BIOLOGICS MODULAR TO PROVIDE ALL HARDWARE LISTED ABOVE. 2. BIOLOGICS MODULAR TO INSTALL ALL HARDWARE LISTED ABOVE. 3. CONTRACTOR TO COORDINATE ALL LOW VOLTAGE INSTALLATION WITH BIOLOGICS MODULAR AND SONICU HARDWARE. 4. CONTACT JULIAN KARRAS, VP OF OPERATIONS AT BIOLOGICS MODULAR, FOR ANY AND ALL INFORMATION PERTAINING TO SONICU HARDWARE. (317-456-9191). RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City offCannel �Nq�\D.WMWA� MAIN SUPPLY DUCT ADJUSTABLE METAL ROD OR UNKAGE VOLUME EXTRACTOR; ADJUSTABLE FROM FULLY CLOSED POSITION TO CAN NOTED ON FLOOR PLANS TOP REGISTER MAIN SUPPLY DUCT 114 W OMM) MIN. PROVIDE VOLUME DAMPER P WHEN SHOWN ON FLOOR PLANS I PUN MEY BRANCH DUCT TAKE -OFT SEE FLOOR PW4 FOR SPLIT MAIN SUPPLY PROVIDE VOLUME DAMPER DUCT WHEN SHOWN ON FLOOR PLANS TURNING VANES SQUARE ELBOW SHOWN. SUPPLY REGISTER OR BRANCH DUCT PROVIDE ROUND ELBOW WHEN SHOWN ON FLOOR PLANS PUN MEW AIR SPLIT DUCT TAKE -OFF DESIGNER'S NOTES 1. THE SUPPLY REGISTER TAKE -OFF MAY BE USED FOR UP UP TO 25% OF THE MAIN DUCT CFM. THE BRANCH DUCT TAKE -OFF MAY BE USED FOR UP TO 15% OF THE MAN DUCT CFM ANYTIME AND UPTO 40% WHEN THE MAIN DUCT VELOCITY IS 1060 TAM 05 M/S) OR LESS- THE AIR SPLIT DUCT TAKE -OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT ANYTIME. 2. SHOW VOLUME DAMPERS ON FLOOR PLANS. SUPPLY DUCTWORK TAKE -OFFS NOT TO SCALE 1. PULL OUTER INSULATION JACKET BACK AND SLIDE INNER LINE OVER SHEETMETAL COLLAR INSULATION JACKET SHEETMETAL BOOT COLLAR DUCT LINER SUPPLY DIFF RETURN AIR 2.. TAPE INNER -LINER TO SHEETMETAL COLLAR WITH SILVER DUCT TAPE. DUCT TAPE SHOULD BE WRAPPED AROUND SHEETMETAL COLLAR TWO FULL TURNS SHEETMELAL BOOT COLLAR SUPPLY DIED RETURN NR I JTER INSULATION JACKET VER DUCT LINER JOT TAPE 3. PULL OUTER INSULATION HACKET OVER SHEETMETAL COLLAR AND PLACE A METAL DRAW BAND OVER THE OUTER INSULATED JACKET BELOW THE SHEETMETAL COLLAR BEAD SHEETMETAL BOOT COLLAR SUPPLY DIFFU: RETURN AS GI JTER INSULATION JACKET VER DUCT LINER IETAL DRAW BAND 4. CUT EXCESS METAL DRAW BAND OFF AND WRAP METAL DRAW BAND WITH SILVER DUCT TAPE. SHEETMETAL BOOT COLLAR SUPPLY DIFFU RETURN AIR G UIaaN49111_11N71/.M lal NER DUCT LINER DUCT TAPE WRAPPED )VER METAL DRAW BAND MECHANICAL WORK NOTES = AIR FILTERS 1, ON THE DAY OF SPACE CONSTRUCTION COMPLETION/TURNOVER, THE AIR CONDITIONING EQUIPMENT FILTERS, IF ANY, (WHETHER NEW CONSTRUCTION OR EXISTING) SHALL BE REPLACED WITH NEW FILTERS. ADDED BLOCKING AS REO'D LAG BOLT 60" MAX IRIfNI HANGER DETAIL FOR DUCTS LESS THAN 46" WIDE HANGER SIZE DUCT SIZE HANGER SIZE UP TO 2 SQ, FE 1" X 1/16" 2 TO 8 SQ. BE 1" X 1/8" OVER 8 SO, FE 1" X 1/8" ROOF OR SUBFLOORING LAG BOLT SCREWS FUNCTION OF DUCT HEIGHT HANGER DETAIL FOR DUCTS OVER 48" WIDE HANGER SPACING DUCT SIZE MAX SPACING UP TO 4 SO, FT, 8'-0" 4 TO 10 SO. U. 6'-0" OVER 10 SO, FT, 4'-0" NOTES: 1. ALL SUPPLEMENTARY STEEL OR ANGLE TO BE EITHER GALVANIZE OR BLACK 2, DUCTS OVER 60" TO TRAPEZE WITH ROD AND ANGLE AS PER SMACNA. 3. DUCT SEALANT: UNITED DUCT SEALER, OR EQUAL. PROVIDE A NON -HARDENING, NON -MIGRATING, MASTIC OR LIQUID ELASTIC SEALANT OF A TYPE AS RECOMMENDED BY THE MANUFACTURER SPECIFICALLY FOR SEALING JOINTS AND SEAMS IN SHEET METAL DUCTWORK. ALL DUCTWORK SHALL HAVE SEALED LONGITUDINAL AND TRANSVERSE JOINTS. WHERE SLIP AND DRIVE JOINTS ARE MADE, A SEALER SHALL BE APPLIED OVER THE ENTIRE JOINT AFTER THE DRIVE IS IN PEACE. APPLY A SECONDARY LAYER OF SEALER AT THE CORNERES AFTER THE DRIVE ENDS ARE CRIMPED IN PEACE. ALL LONGITUDINAL SEAMS SHALL BE COVERED WITH A SEALING MASTIC. ALL SLIP JOINTS SHALL BE MADE AND COATED, THEN INSERTED INTO THE DUCT OR COLLAR AND SECURED WITH SHEET METAL SCREWS. COVER THE ENTIRE OUTER JOINT AND SCREWS WITH MASTIC. COVER JOINTS AROUND ALL SPIN -IN FITTINGS. INTERNALLY CLEAN DUCTWORK OF DUST AND DEBRIS DUCT HANGING DETAILS FOR EXISTING STRUCTURE FLEX DUCT CONNECTION TO DIFFUSERS, GRILLES AND SHEETMETAL PLENUM COLLARS NOT TO SCALE MECHANICAL WORK NOTES - GENERAL 1, MECHANICAL WORK SHALL BE COMPLETE IN EVERY DETAIL AND ALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARY TO COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLY IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCLUDED IN THE CONTRACT. CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO THE WORK WHERE REQUESTED BY THE TENANT, WHEN SUCH ADJUSTMENTS ARE NECESSARY TO PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT. 2. MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND VIEW ALL EXISTING CONDITIONS BEFORE SUBMITTING A PROPOSAL FOR THE WORK AS DESCRIBED AND SHOWN. NO EXTRAS WILL BE ENTERTAINED FOR FAILURE TO MAKE THIS VISIT. 3, MECHANICAL CONTRACTOR SHALL ACCEPT SOLE AND COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. 4. CONFORM TO GENERAL CONTRACTOR'S SCHEDULE AND INSTRUCTIONS THROUGHOUT THE DURATION OF THE PROJECT AS REQUIRED TO COMPLY IN EVERY WAY NECESSARY. 5, CONTRACTOR SHALL NOTIFY THE ARCHITECT AND/OR ENGINEER OF ERRORS, OMMISSIONS OR DISCREPENCIES BEFORE CONSTRUCTION OR FABRICATION OF AFFECTED WORK, OR, FAILING SUCH NOTICE, SHALL BE RESPONSIBLE FOR CORRECTING SAME WITHOUT COST TO TENANT, ARCHITECT OR ENGINEER. 6, ORDER EQUIPMENT ON A TIMELY BASIS (WITHIN 5 DAYS OF RECEIPT OF CONTRACT) TO MAINTAIN CONSTRUCTION SCHEDULE. 7. SUBMIT ELECTRONIC COPIES OF SHOP DRAWINGS OF ALL EQUIPMENT FOR REVIEW BY ENGINEER. ONLY FURNISH SYSTEMS, EQUIPMENT AND MATERIAL IN COMPLIANCE WITH APPROVED SHOP DRAWINGS. 8, WORK SHALL INCLUDE STARTUP OF ALL SYSTEMS, FURNISHING OF OPERATING AND MAINTENANCE INSTRUCTIONS, WARRANTEE FOR ALL EQUIPMENT AND ONE YEAR GUARANTEE OF ALL WORKMANSHIP, COMMENCING ON DATE OF ACCEPTANCE BY THE TENANT. 9, WORK SHALL ALSO INCLUDE FULL ONE (1) YEAR MAINTENANCE, PARTS AND SERVICE CONTRACT FOR ALL EQUIPMENT FURNISHED UNDER THE CONTRACT. 10, ON ALL AIR CONDITIONING EQUIPMENT WHICH INCLUDES COMPRESSORS (ROOFTOP, SPLIT SYSTEMS, ETC.), INCLUDE AN EXTENDED FOUR (4) YEAR WARRANTY FOR THE COMPRESSOR. 11, VOLUME DAMPERS, SPUTTERS AND DEFLECTORS SHALL BE INSTALLED IN ALL DUCTS TO PERMIT ACCURATE BALANCING OF SYSTEM. THE DAMPERS, SPUTTERS AND DEFLECTORS SHALL BE ADJUSTED TO SATISFY THE HVAC REQUIREMENTS OF THE CONDITIONED SPACE AND LOCKED IN PLACE AS REQUIRED. 12, WORK SHALL ALSO INCLUDE TESTING AND BALANCING OF A.C. SYSTEM BY A CERTIFIED BALANCING CONTRACTOR. CONTRACTOR SHALL SUBMIT COPIES OF TEST AND BALANCE REPORTS SHOWING DETAILED RESULTS OF WORK, INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: FLOW READINGS, STATIC PRESSURES, TEMPERATURE READINGS, MOTOR AMPERAGE, BALANCING OF AIR QUANTITIES TO PLAN REQUIREMENTS, ETC. AS REQUIRED. MAKE ALL ADJUSTMENTS AS REQUIRED TO PROVIDE DESIGN AIR FLOW. 13. FURNISH ALL EQUIPMENT MANUALS AND WARRANTIES TO TENANT AT THE COMPLETION OF THE PROJECT. 14, WHERE APPLICABLE, FURNISH AND INSTALL VIBRATION ISOLATION AS REQUIRED TO REDUCE, LIMIT OR REMOVE ALL VIBRATIONS FOR ALL MOVING EQUIPMENT. VIBRATION ISOLATION SHALL BE IN ACCORDANCE WITH ASHRAE RECOMMENDATIONS. 15, NATURAL GAS DISTRIBUTION PIPING SHALL BE SCHEDULE 40 BLACK PIPE WITH 150N MALLEABLE IRON FITTINGS. 16, ALL FABRICATED COMPONENTS (CONTRACTOR OR MANUFACTURER) OF THE OUTSIDE AIR, SUPPLY AIR, RETURN AIR AND EXHAUST AIR SYSTEMS SHALL BE CONSTRUCTED AND INSTALLED AIR TIGHT. THE INSTALLED SYSTEMS SHALL BE PRESSURE TESTED AS REQUIRED. 17, COPPER TUBING USED IN REFRIGERATING SYSTEMS SHALL BE BRAZED. SOLDERED JOINTS AND MECHANICAL JOINTS SHALL NOT BE USED, 18, FURNISH TWO (2) COPIES OF RECORD DRAWINGS OF THE A.C. SYSTEM TO THE OWNER FOR REVIEW AND APPROVAL, AND SUBMIT A LETTER TO THE OWNER CONFIRMING THAT THE SYSTEM WAS INSTALLED AS PER PLANS AND SPECIFICATIONS. DOCUMENTS WILL BE REQUIRED IN POP AND CAD FORMAT. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS, AND ANY CHANGES MADE DURING CONSTRUCTION THAT ARE NOT IN COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS SHALL BE RESUBMITTED FOR APPROVAL AS AN AMENDED SET OF CONSTRUCTION DOCUMENTS. 19. ALL WORK AND EQUIPMENT SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER BEFORE TURNING PROJECT OVER TO THE OWNER. GO SEAL ALL PENETRATIONS THROUGH WALLS, CEILINGS, FLOORS, ETC. SO THAT THEY ARE AIR, WATER AND FIRE TIGHT. 21. FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED EQUIPMENT, FIRE DAMPERS, PIPING VALVES, CLEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFICIENT SIZE TO PROVIDE ADEQUATE WORKING CLEARANCE AND ACCESS. 22, FURNISH ALL MATERIAL AND EQUIPMENT AS SPECIFIED, EXCEPT WHERE SPECIFIC APPROVAL FOR SUBSTITUTION IS GIVEN BY THE TENANT. 23, PROPOSAL SHALL BE BASED ON SPECIFIED MATERIAL AND EQUIPMENT. IN ORDER TO PROMOTE COMPETITION, HOWEVER, BIDDERS ARE ENCOURAGED TO SUBMIT ALTERNATE PROPOSALS ON ANY ALTERNATE MATERIALS AND/OR EQUIPMENT THEY WISH TO PROPOSE, INCLUDING ANY PRICE CHANGES EFFECTED BY ACCEPTANCE OF ALTERNATES. 24, COST OF ANY CHANGES REQUIRED BY OTHER TRADES DUE TO SUBSTITUTION OF ALTERNATE EQUIPMENT SHALL BE INCLUDED IN THE ALTERNATE PROPOSAL. 25. ALTERNATE PROPOSALS WILL BE ACCEPTED OR REJECTED BEFORE ISSUANCE OF CONTRACTS. NO CHANGES WILL BE ALLOWED AFTER THE CONTRACT IS SIGNED. ANY UNAUTHORIZED CHANGES TO THE DESIGN AND LAYOUT MAY BE REQUIRED TO BE REMOVED AT CONTRACTOR'S EXPENSE IF DEEMED NECESSARY BY THE ARCHITECT, ENGINEER OR OWNER'S REPRESENTATIVE. 26. VERIFY LOCAL CONDITIONS AT SITE. 27, COMPLY WITH ALL APPLICABLE CODES. 28, SECURE AND PAY FOR ALL REQUIRED PERMITS. 29. SEE REFLECTED CEILING PLAN FOR EXACT LOCATION OF CEILING GRID, LIGHT FIXTURES, ETC. 30. ALL INSULATION MATERIALS, INCLUDING, BUT NOT LIMITED TOO DUCT INSULATION AND PIPING INSULATION SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255 STANDARD METHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. 31. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILIAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BY A NYLON INSULATOR TO PREVENT CURRENT FLOW BETWEEN DISSIMILAR METALS. UNIONS SHALL BE SUITABLE FOR THE SYSTEM OPERATING PRESSURES AND TEMPERATURE WELD TYPE. ASTM A-234. TEMPERATURE CONTROL NOTES 1. TEMPERATURE CONTROL WORK SHALL BE A PART OF THE MECHANICAL CONTRACT. FURNISH AND INSTALL ALL THERMOSTATS. WIRING, ETC., REQUIRED FOR A COMPLETE SYSTEM. 2. ALL WIRING SHALL BE IN CONDUIT. 3, INSTALL IN THE LOCATION SHOWN. 4. VERIFY THE NUMBER OF CONTROL WIRES REQUIRED FOR A COMPLETE INSTALLATION. 5. INSTALLATION OF THE THERMOSTATS SHALL BE IN STRICT ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. 6. ON "DAY" CYCLE: A. SUPPLY FAN RUNS CONTINUOUSLY. B. THERMOSTAT SHALL ENERGIZE COOLING OR HEATING CYCLES IN THE A.C. UNIT AS REQUIRED. 7, ON NIGHT" CYCLE: A. SUPPLY FAN OFF. B. COOLING CYCLE INOPERATIVE. C. ON A CALL FOR HEATING FROM THE THERMOSTAT, FAN SHALL START AND HEATING CYCLE SHALL BE ENERGIZED; BOTH SHALL CONTINUE TO OPERATE UNTIL THE THERMOSTAT IS SATISFIED. 8, PROVIDE A MORNING WARMUP CYCLE WHICH SHALL HOLD THE PRIMARY AIR DAMPER CLOSED, START THE FAN AND ENERGIZE THE HEATING COIL UNTIL THE SYSTEM REACHES THE "DAY" THERMOSTAT SETTING. MECHANICAL GENERAL NOTES 1. FURNISH AND INSTALL NEW DIFFUSERS AND REGISTERS AS SHOWN AND SPECIFIED. FURNISH AND INSTALL VOLUME DAMPERS AT ALL NEW BRANC= TAKEOFFS. 2. TEMPERATURE CONTROLS, INCLUDING WIRING, SHALL BE PART OF THE MECHANICAL CONTRACT. 3- FIBERGLASS DUCTWORK 15 NOT PERMITTED. 4. FLEXIBLE DUCTWORK MAY BE USED FOR VERTICAL DIFFUSER CONNECTIONS ONLY AND SHALL BE LIMITED IN LENGTH TO 5'-0" MAX. 5. ALL DUCTWORK SHALL CONFORM TO THE LATEST EDITION OF SMACNA STANDARDS AND RECOMMENDATIONS. 6, DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSION AND SHALL BE ADJUSTED IF REQUIRED TO ACCOUNT FOR METHOD OF INSULATION. 7. FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED PARTITIONS (IF REQUIRED) IN STRICT ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. VERIFY EXACT METHOD OF FIRE AND MOISTURE CONTROL WITH LANDLORD AND/OR ARCHITECT. 8. A MINIMUM OF R-6 DUCT INSULATION SHALL BE INSTALLED ON ALL DUCTWORK. Ia .10. ARCHITECTS, PC a184 TECHNOLOGY DRIVE HSHERS, IN 4603B TEL 917556.2022 FAX S17.55B.2B27 rml.nderifinem.am SP_ NC=R �NGINEE2ING_ 1533 EAST NORTHFIELD DRIVE SUITE 400 BWWW SPENCOERMEP CON I U 5< I..I_ 2 'LLIJJ 11 No. 04C3982 STATE OF U) J_ a W 0 J a U_ Z a tU LU L o zw <W O i0 0 0 N aw lm DATE: 05/30/19