Loading...
HomeMy WebLinkAbout190523 PURE Pharmacy Permit 03-A10DEMOLITION SYMBOL LEGEND EXISTING WALLS TO BE DEMOLISHED ADJACENT SUITE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel O O 70 3 7 6 6 3 7 12 — EXISTING WALLS TO REMAIN :k, F EXISTING DOOR TO BE DEMOLISHED ,T) wa� EXISTING DOOR TO REMAIN DEMOLITION GENERAL NOTES A. THE DEMOLITION DRAWINGS SHOWN AS PART OF THIS SET ARE INTENDED TO SHOW THE GENERAL SCOPE AND EXISTING CONDITIONS OF THE PROJECT AND THE GENERAL EXTENTS OF THE DEMOLITION. IT IS NOT THE INTENT OF THE DRAWINGS TO BE ALL INCLUSIVE OF ALL DEMOLITION NECESSARY FOR NEW CONSTRUCTION AND ARE MEANT TO AID THE CONTRACTOR IN EVALUATION OF THE EXTENT OF DEMOLITION. THE CONTRACTOR(S) ARE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS, COORDINATING ALL NECESSARY REQUIREMENTS AND PERFORMING ALL DEMOLITION REQUIRED FOR NEW CONSTRUCTION WHETHER SHOWN OR NOT, B. FIELD INSPECT DEMOLITION SCOPE PRIOR TO REMOVAL. INSURE REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF EXISTING STRUCTURE TO REMAIN. IF FIELD INSPECTION INDICATES STRUCTURAL INTEGRITY MAY BE IMPAIRED, CONTRACTOR(S) SHALL NOTIFY ARCHITECT I STRUCTURAL ENGINEER AND OWNER IMMEDIATELY AND TAKE IMMEDIATE ACTION TO ENSURE SAFETY OF STRUCTURE WHILE PERMANENT SOLUTION IS DEVELOPED. C. DO NOT SCALE ANY DRAWINGS. FIELD VERIFY ALL EXISTING CONDITIONS. REPORTANY DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION. D. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK AMONG ALL TRADES. E. VERIFY ALL EXISTING WALL, FLOOR,CEILING, AND ROOF CONSTRUCTION TO DETERMINE EXTENT AND METHODS OF DEMOLITION REQUIRED FOR NEW CONSTRUCTICN. F. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND CONDUITS, CHASES, AND SOIL CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION G. MAINTAIN ALL EXISTING EXITS AND EGRESS FOR THE DURATION OF THE CONSTRUCTION. H. EXISTING BUILDING SHALL BE MAINTAINED WATER TIGHT AND DUST FREE THROUGHOUT ENTIRE PROJECT. PORTIONS OF THE BUILDING WILL REMAIN OCCUPIED AND N OPERATION DURING CONSTRUCTION PROCESS. I. IF HAZARDOUS MATERIALS ARE UNCOVERED DURING DEMOLITION OR CONSTRUCTION NOTIFY THE ARCHITECT AND OWNER IMMEDIATELY J. OWNER WILL REMOVE FURNISHINGS AND LOOSE EQUIPMENT PRIOR TO DEMOLITION. K. REMOVE AND/OR DEMOLISH ITEMS INDICATED. THE OWNER HAS THE RIGHT OF FIRST REFUSAL ON EXISTING MATERIALS AND EQUIPMENT REMOVED FROM THE SITE. VERIFYWITH OWNER ALL EXISTING MATERIAL, CASEWORK, EQUIPMENT, LIGHT FIXTURES, SYSTEM FURNISHINGS, DOORS, OR FRAMES WHICH SHALL BE SALVAGED PRIOR TO REMOVAL. TURN OVER SALVAGE MATERIALS TO OWNER AND/OR STORE ON SITE AS INDICATED BY THE OWNER. CONTRACTOR SHALL PROPERLY DISPOSE OF REMAINING ITEMS AND REMOVE FROM THE SITE IMMEDIATELY L. REFER TO PROJECT MANUAL FOR ADDITIONAL DEMOLITION REQUIREMENTS. M. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION, DEMOLITION WORK, AND COORDINATION REQUIREMENTS. N. FOR NFILLING ALL PLUMBING TRENCHES N CONCRETE, TIE NEW AND EXISTING CONCRETE TOGETHER USING p4 REBAR @ 16" O.C. TYP. 0. REMOVE ALL EXISTING WINDOW TREATMENTS MINNS UNDS, ETC) AND PATCH WINDOW JAMBS OR HEADS AS REQUIRED. P. ALL CASEWORK TO BE REMOVED THROUGHOUT. O DEMOLITION KEYNOTES II 1. REMOVE ALL EXISTING SUSPENDED CEILING TILE, GRID, AND DIFFUSERS THROUGHOUT 2, REMOVE EXISTING PLUMBING FIXTURE IN ITS ENTIRETY; REFER TO PLUMBING DRAWINGS FOR MORE INFORMATION. 3, REMOVE ALL EXISTING LOOSE CASEWORK IN ITS ENTIRETY 4, DEMOLISH PORTION OF EXISTING FLOOR FOR NEW PLUMBING FIXTURE, COORDINATE WITH PLUMBING PLANS ON EXACT LOCATION. 5, REMOVE PORTION OF WALL FOR NEW DOOR I OPENING. REFER TO ARCHITECTURAL PLAN &DOOR SCHEDULE FOR INFORMATION. 6. REMOVE EXISTING WALL & FLOOR FINISHES THROUGHOUT. PREP SURFACES AS REQUIRED FOR APPLICATION OF NEW FINISHES. 7. DEMOLISH PORTION OF EXISTING WALL FOR NEW PASS THRU BOX. REFER TO ARCHITECTURAL PLAN FOR EXACT LOCATION. 8. EXISTING ELECTRICAL PANEL TO BE RELOCATED; REFER TO ARCHITECTURAL AND ELECTRICAL PLANS FOR NEW LOCATION. 9. DEMOLISH EXISTING DOOR AND FRAME IN ITS ENTIRETY AND PREP FOR INFILL; REFER TO ARCHITECTURAL PLAN FOR INFO ON WALL INFILL CONSTRUCTION. 10. VERIFY EXISTING WALL CONSTRUCTION AND DETERMINE IF EXISTING EXTERIOR LAYERS CAN BE REMOVED FROM THIS SIDE, AND NOTIFY ARCHITECT OF ANY FINDINGS. 11. REMOVE EXISTING DOOR FRAME IN ITS ENTIRETY, OPENING TO REMAIN. PREP SURFACES FOR GYP FINISH. SEE ARCHITECTURAL PLAN FOR MORE INFORMATION. 12. DEMOLISH EXISTING WALL, DOORS AND FRAMES IN ITS ENTIRETY. EXTENTS ARE INDICATED BY RED DASHED LINES ON THIS PLAN. M.D. ARCHITECTS, PC 9084 TECHNOLOGY DRIVE FISHERS, IN 4EIGS TEL:317658.28M FAX 317.558.2827 www.mdarchi ecls cam LU a D a 0 12 % �I 3 —1 6 \ u I I II 4 II II - 3 s II II T w zz I R I a _ z II O o II E w 0 O II 5 a 0 DEMOLITION PLAN N A7.0 1/4' = 1' 0" i N M O Z J w 3- ry Q U Ni m LLI 5 U) LO Z Q fy LLI 5- 0 J O N N V N O IN Z J a Z O J 0 W 0 DATE: 05/30/19