HomeMy WebLinkAbout190523 PURE Pharmacy Permit 03-A10DEMOLITION SYMBOL LEGEND
EXISTING WALLS TO BE DEMOLISHED
ADJACENT SUITE
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
O
O
70
3
7 6
6
3 7
12 —
EXISTING WALLS TO REMAIN
:k, F EXISTING DOOR TO BE DEMOLISHED
,T)
wa� EXISTING DOOR TO REMAIN
DEMOLITION GENERAL NOTES
A. THE DEMOLITION DRAWINGS SHOWN AS PART OF THIS SET ARE INTENDED TO SHOW THE
GENERAL SCOPE AND EXISTING CONDITIONS OF THE PROJECT AND THE GENERAL EXTENTS OF
THE DEMOLITION. IT IS NOT THE INTENT OF THE DRAWINGS TO BE ALL INCLUSIVE OF ALL
DEMOLITION NECESSARY FOR NEW CONSTRUCTION AND ARE MEANT TO AID THE CONTRACTOR
IN EVALUATION OF THE EXTENT OF DEMOLITION. THE CONTRACTOR(S) ARE RESPONSIBLE FOR
VERIFYING ALL EXISTING CONDITIONS, COORDINATING ALL NECESSARY REQUIREMENTS AND
PERFORMING ALL DEMOLITION REQUIRED FOR NEW CONSTRUCTION WHETHER SHOWN OR
NOT,
B. FIELD INSPECT DEMOLITION SCOPE PRIOR TO REMOVAL. INSURE REMOVAL DOES NOT IMPAIR
STRUCTURAL INTEGRITY OF EXISTING STRUCTURE TO REMAIN. IF FIELD INSPECTION INDICATES
STRUCTURAL INTEGRITY MAY BE IMPAIRED, CONTRACTOR(S) SHALL NOTIFY ARCHITECT I
STRUCTURAL ENGINEER AND OWNER IMMEDIATELY AND TAKE IMMEDIATE ACTION TO ENSURE
SAFETY OF STRUCTURE WHILE PERMANENT SOLUTION IS DEVELOPED.
C. DO NOT SCALE ANY DRAWINGS. FIELD VERIFY ALL EXISTING CONDITIONS. REPORTANY
DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION.
D. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK AMONG ALL TRADES.
E. VERIFY ALL EXISTING WALL, FLOOR,CEILING, AND ROOF CONSTRUCTION TO DETERMINE
EXTENT AND METHODS OF DEMOLITION REQUIRED FOR NEW CONSTRUCTICN.
F. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND CONDUITS, CHASES, AND SOIL
CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION
G. MAINTAIN ALL EXISTING EXITS AND EGRESS FOR THE DURATION OF THE CONSTRUCTION.
H. EXISTING BUILDING SHALL BE MAINTAINED WATER TIGHT AND DUST FREE THROUGHOUT
ENTIRE PROJECT. PORTIONS OF THE BUILDING WILL REMAIN OCCUPIED AND N OPERATION
DURING CONSTRUCTION PROCESS.
I. IF HAZARDOUS MATERIALS ARE UNCOVERED DURING DEMOLITION OR CONSTRUCTION NOTIFY
THE ARCHITECT AND OWNER IMMEDIATELY
J. OWNER WILL REMOVE FURNISHINGS AND LOOSE EQUIPMENT PRIOR TO DEMOLITION.
K. REMOVE AND/OR DEMOLISH ITEMS INDICATED. THE OWNER HAS THE RIGHT OF FIRST REFUSAL
ON EXISTING MATERIALS AND EQUIPMENT REMOVED FROM THE SITE. VERIFYWITH OWNER ALL
EXISTING MATERIAL, CASEWORK, EQUIPMENT, LIGHT FIXTURES, SYSTEM FURNISHINGS, DOORS,
OR FRAMES WHICH SHALL BE SALVAGED PRIOR TO REMOVAL. TURN OVER SALVAGE
MATERIALS TO OWNER AND/OR STORE ON SITE AS INDICATED BY THE OWNER. CONTRACTOR
SHALL PROPERLY DISPOSE OF REMAINING ITEMS AND REMOVE FROM THE SITE IMMEDIATELY
L. REFER TO PROJECT MANUAL FOR ADDITIONAL DEMOLITION REQUIREMENTS.
M. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION, DEMOLITION WORK, AND COORDINATION REQUIREMENTS.
N. FOR NFILLING ALL PLUMBING TRENCHES N CONCRETE, TIE NEW AND EXISTING CONCRETE
TOGETHER USING p4 REBAR @ 16" O.C. TYP.
0. REMOVE ALL EXISTING WINDOW TREATMENTS MINNS UNDS, ETC) AND PATCH WINDOW JAMBS
OR HEADS AS REQUIRED.
P. ALL CASEWORK TO BE REMOVED THROUGHOUT.
O DEMOLITION KEYNOTES II
1. REMOVE ALL EXISTING SUSPENDED CEILING TILE, GRID, AND DIFFUSERS THROUGHOUT
2, REMOVE EXISTING PLUMBING FIXTURE IN ITS ENTIRETY; REFER TO PLUMBING DRAWINGS FOR MORE
INFORMATION.
3, REMOVE ALL EXISTING LOOSE CASEWORK IN ITS ENTIRETY
4, DEMOLISH PORTION OF EXISTING FLOOR FOR NEW PLUMBING FIXTURE, COORDINATE WITH
PLUMBING PLANS ON EXACT LOCATION.
5, REMOVE PORTION OF WALL FOR NEW DOOR I OPENING. REFER TO ARCHITECTURAL PLAN &DOOR
SCHEDULE FOR INFORMATION.
6. REMOVE EXISTING WALL & FLOOR FINISHES THROUGHOUT. PREP SURFACES AS REQUIRED FOR
APPLICATION OF NEW FINISHES.
7. DEMOLISH PORTION OF EXISTING WALL FOR NEW PASS THRU BOX. REFER TO ARCHITECTURAL PLAN
FOR EXACT LOCATION.
8. EXISTING ELECTRICAL PANEL TO BE RELOCATED; REFER TO ARCHITECTURAL AND ELECTRICAL
PLANS FOR NEW LOCATION.
9. DEMOLISH EXISTING DOOR AND FRAME IN ITS ENTIRETY AND PREP FOR INFILL; REFER TO
ARCHITECTURAL PLAN FOR INFO ON WALL INFILL CONSTRUCTION.
10. VERIFY EXISTING WALL CONSTRUCTION AND DETERMINE IF EXISTING EXTERIOR LAYERS CAN BE
REMOVED FROM THIS SIDE, AND NOTIFY ARCHITECT OF ANY FINDINGS.
11. REMOVE EXISTING DOOR FRAME IN ITS ENTIRETY, OPENING TO REMAIN. PREP SURFACES FOR GYP
FINISH. SEE ARCHITECTURAL PLAN FOR MORE INFORMATION.
12. DEMOLISH EXISTING WALL, DOORS AND FRAMES IN ITS ENTIRETY. EXTENTS ARE INDICATED BY RED
DASHED LINES ON THIS PLAN.
M.D. ARCHITECTS, PC
9084 TECHNOLOGY DRIVE
FISHERS, IN 4EIGS
TEL:317658.28M
FAX 317.558.2827
www.mdarchi ecls cam
LU
a
D
a
0
12 %
�I 3
—1 6
\ u I I
II
4 II
II -
3 s II
II T w zz
I R
I a _ z
II O
o II E
w 0
O II 5 a
0 DEMOLITION PLAN N
A7.0 1/4' = 1' 0"
i
N
M
O
Z
J
w
3-
ry
Q
U
Ni
m
LLI
5
U)
LO
Z
Q
fy
LLI
5-
0
J
O
N
N
V
N
O
IN
Z
J
a
Z
O
J
0
W
0
DATE: 05/30/19