Loading...
HomeMy WebLinkAbout19030064 State Release MEPELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm. This on-line filing is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans. Use Internet Browser to View this report, other browsers are not compatible to view this report Page 1/2 CONSTRUCTION DESIGN RELEASE State Form 41191 (R9/5-98) Report Printed on:March 25, 2019 Project number Release date 406563 03/12/19 Construction type Occupancy classification Scope of release V-A, SPK R-1, B Type of release Project name Street address City County ARCH ELEC MECH PLUM STR Standard Home2 Carmel, IN 12845 Old Meridian St CARMEL HAMILTON To: Owner / Architect / Engineer Base4 Ricardo Javier Muniz-Guillet AR11700161 2901 Clint Moore Road Ste 114 Boca Raton FL 33496 Note :(A1A & A1B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000. The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions listed below. THIS IS NOT A BUILDING PERMIT. All required local permits and licenses must be obtained prior to beginning construction work. All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with and released by this Office before any work is altered. This release may be suspended or revoked if it is determined to be issued in error, in violation of any rules of the Commission or if it is based on incorrect or insufficient information. This release shall expire by limitation, and become null and void, if the work authorized is not commenced within one (1) year from the above date. CONDITIONS: 14B A2L 14B1600 14B11012 14B09072111 14B1008198 14B101842 4G0603AE 14B0907 This project has been reviewed under the 2014 Indiana Building Code. A lift installation permit shall be obtained from the Elevator Safety Division in accordance with IESC (675 IAC 21-1-1). Please visit: http://www.in.gov/dhs/2374.htm Buildings, or portions thereof, shall be designed and constructed to sustain all dead, live, and environmental loads in accordance with Chapter 16, IBC (675 IAC 13-2.6). Buildings and facilities shall be designed and constructed to be accessible in accordance with Section 1101.2, IBC (675 IAC 13-2.6) and ICC standard A117.1 2009 edition (675 IAC 13-2.6). Smoke alarms shall be installed in Group R-1 occupancies in accordance with Section 907.2.11.1, IBC (675 IAC 13-2.6). Entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed and operate in accordance with items 1 through 6, in accordance with Section 1008.1.9.8, IBC (675 IAC 13-2.6). In occupancies in Groups B, E, F, I-1, M, R-1, R-2, R-4, S and U, where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1, the length of dead-end corridors shall not exceed 50 feet in accordance with Section 1018.4, Exception 2, IBC (675 IAC 13-2.6). Detailed plans and specifications of the fire suppression system shall be filed with the required application and appropriate fees in accordance with 675 IAC 12-6-3(a), 675 IAC 12-6-7(g)(17), and 675 IAC 13-1-8. (N.F.P.A. 13) The fire alarm system shall be designed as specified in Section 907, IFC, and N.F.P.A. 72, in accordance with Section 907, IBC (675 IAC 13-2.6). Indiana Department of Homeland Security DIVISION OF FIRE & BUILDING SAFETY PLAN REVIEW DIVISION 402 W. Washington St., Room E245 Indianapolis, IN 46204 Fax & e-mail: SUPPORT HOOSIER SAFETY Available At Your Local Licence Branch In accordance with Section 19 of the General Administrative Rules (675 IAC 12-6-19) a complete set of plans and specifications that conform exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a copy of the design release. 0000000000, rick@base-4.com ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm. This on-line filing is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans. Use Internet Browser to View this report, other browsers are not compatible to view this report Page 2/2 14W09077 14B10099 14B100916 9E2108 9E51112 9E01C 4G0603AP AREL Upon completion of the installation of the fire alarm system, a satisfactory test of the entire system shall be made. All functions of the system or alteration shall be tested in accordance with Section 907.7, IFC (675 IAC 22-2.5). All stairways shall be built of materials consistent with types permitted for the type of construction of the building, except that wood handrails shall be permitted for all types of construction in accordance with Section 1009.9, IBC (675 IAC 13-2.6). In buildings located four or more stories in height above grade plane, one stairway shall extend to the roof surface, unless the roof has a slope steeper than 4 units vertical in 12 units horizontal (33 percent slope) in accordance with Section 1009.16, IBC (675 IAC 13-2.6). Commercial bathrooms, kitchens, and rooftops shall be provided with GFCI protection in accordance with Section 210.8, IEC (675 IAC 17-1.8). Where electrical portable hand tools or portable lighting is used GFCI protection shall be provided in accordance with Section 511.12, IEC (675 IAC 17-1.8). Note: The electrical release includes the fire alarm system. This release does not include pool installations in accordance with 675 IAC 12-6-7(19) and 8(a)(b). NOTE: The release does not include the kitchen fixture installation. Pursuant to 675 IAC 12-6-21, the issuance of a design release does not relieve the owner from required compliance with all applicable rules of the commission, even if noncompliant conditions appear in the plans and specifications that have been filed with the division. The owner is responsible for correcting any and all areas of noncompliance even if they are discovered subsequent to the issuing of this design release. Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above - stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will be final, and you must comply with its requirements. Code review official Address (name,title of local official,street,city,state and ZIP code DAUDA ISHOLA-GBENLA JIM BLANCHARD ONE CIVIC SQUARE CARMEL,IN 46032 DEPT OF COMMUNITY SERVICE Fax & e-mail: 3175712499, jblanchard@carmel.in.gov Director, Division of Fire and Building Safety dishola-gbenla@dhs.in.gov