HomeMy WebLinkAboutM-2 Schedules Notes and Details-SS-082318H.v.A.C. UNIt SCHEDULE OU-1 / AHU-I 01.1-2 / AHU-2 CU-3 / AHU-3 MANUFACTURER TEMPSTAR (5 TON) TEMPSTAR (5 TON) TEMPSTAR (5 TON) MODEL NO. CU-1-N4H46OAK5100 CU-2-N41146OAK5100 CU-3-N4446OAK5100 AHU-I-FEM4X6000AT AHU-2-FEM4X6000AT AHU-3-FEM4X600CAT BTUH OUTPUT (MIN.) 35,400 35,400 35,400 BTUH OUTPUT (MAX.) 51000 51000 51000 TOTAL COOLING CAPACITY 51500 51,500 51500 LINE VOLTAGE CU-1-20SA0160 CU-2-20SA0160 0U-3-208/10/60 AHU-1-208/10/60 A411-2-208/10/60 AHU-3-208/10/60 SUPPLY AIR CFM 1000 Iwo low RETURN AIR CFM ldl Ib50 Ib50 OUTSIDE AIR CR1 150 150 150 ESP. 05" 05" 05" NOTE: I. REFERENCE ELECTRICAL DRAWINGS FOR DUCT MOUNTED SMOKE DETECTOR LOCATIONS. 2. NEW UNITS TO HAVE A MINIMUM MID E.EUR. / 140 S.E.EJR. 3. UNITS TO HAVE AN ECONOMIZER, WHERE APPLICABLE. 4. UNITS WILL BE SUPPLIED WITH PROGRAMMABLE THERMOSTATS. 5. AIR HANDLERS TO BE FURNISHED WITH U EHK25AKNI, 25KW ELECTRIC HEATER w/ SINGLE POINT WIRING KIT, EACH. AIR BALANCE SCHEDULE ITEM OA. R.A. SA EA. PRESSURE CU-1 / AHU-I 150 1650 U800 ---- .150 CU-2 / AHU-2 150 11 1000 ---- .150 CU-3 / AHU-3 150 Ill IAA ---- +150 EF-I (EX) ---- ---- ---- -100 -100 Er-2 (EX) ---- ---- ---- -100 -100 -0TAL5 450 4,950 5,400 -200 +250 ;AN SCHEDULE MARK MFR. MODEL SERVICE Ow S.P HP VOLTAGE EF-1 (EX) EF-2 (EX) EXISTING ------- EXISTING - ... --- RR EXHAUST RR EXHAUST 100 ---- ----------------- 100 ---- ----------------- RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 06/05/19 H.v.A.C. GENERAL NOtES: A. NEW H.VAC. UNITS TO HAVE MOTORIZED OUTSIDE AIR DAMPER OUTSIDE AIR DAMPER TO CLOSE AUTOMATICALLY IN UNOCCUPIED MODE. B. ALL NEW SUPPLY, RETURN DUCTS AND OUTSIDE AIR DUCTS INSIDE BUILDING SHALL BE INSULATED EXTERNALLY WITH 1 1/2" THICK F15ERSLASS WITH A DENSITY OF 15 POUNDS PER CUBIC FOOT AND BE COMPLETE WITH VAPOR BARRIER JACKET. ALL DUCT INSULATION, TAPE COVERINGS, AND FLEXIBLE CONNECTORS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM ES4. ALL SAlRAJO. A. DUCT INSULATION SHALL HAVE A MINIMUM "R" VALUE EQUAL OR GREATER THAN "R-6" FOR DUCTS N CONDITIONED SPACES (R-8 FOR UNCONDITIONED SPACES). ALL INSULATION SHALL MEET REQUIREMENTS OF STATE AND LOCAL CODES AND MECHANICAL CODES. H.VAC. CONTRACTOR TO VERIFY EXISTING DUCT INSULATION. C. ANY NEW FLEXIBLE DUCTS SHALL BE METAL FLEX CLASS I TYPE 500 AIR DUCT AND SHALL BE U.L. LISTED AND HAVE 1" THICK FIBERGLASS INSULATION ENCASED IN A VAPOR BARRIER OF SEAMLESS, NON-COMBUSTIBLE, CO -POLYMER PLASTIC. ALL NEW FLEX DUCT INSULATION SHALL BE EQUAL TO R-6 OR GREATER D. ALL NEW FLEXIBLE DUCTS SHALL BE CONNECTED TO EXISTING TRUNK OR BRANCH DUCTS WITH A MINIMUM OF THREE SHEET METAL SCREWS AT EACH CONNECTION AND BE TAPED TO PROVIDE AN AIR TIGHT SEAL. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 5'-011 . E. NEW FLEXIBLE DUCT HANGER STRIPS, IF NEEDED, SHALL BE MINIMUM 2" WIDE BY 22 GAUGE GALVANIZED METAL. F. ANY NEW DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE MOST RECENT PUBLISHED 5MACNA STANDARDS FOR LOW -VELOCITY, LCW-PRESSURE DUCTS. G. ALL NEW CONTROL WIRING SHALL BE FURNISHED AND INSTALLED BY H.VA.C. CCNTRACTOR H. EXISTING WATER HEATER TO REMAIN. J. PROVIDE NEOPRENE FLEXIBLE CONNECTIONS AT SUPPLY t RETURN DUCT CONNECTIONS ON AIR HANDLER UNITS. K. H.VAC. CONTRACTOR SHALL RE -BALANCE H.VAC. SYSTEM TO AIR QUANTITIES INDICATED. PROVIDE TYPED WRITTEN REPORT TO OWNER UPON COMPLETION. L. H.VA.C. CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID TO VERIFY ALL EXISTING CONDITIONS, AND VERIFY STRUCTURAL LOADS PRIOR TO INSTALLATION OF NEW EQUIPMENT. CONSULT STRUCTURAL ENGINEER AS NEEDED. M. H.VAC. CONTRACTOR SHALL FIELD VERIFY DUCT CLEARANCE/ SPACE FOR ROUTING DUCTS PRIOR TO SUBMITTING BID. CONTRACTOR MAY ALTER DUCT SIZING TO ACCOMODATE CLEARANCES ABOVE CEILINGS, BUT MIDST MAINTAIN SAME EFFECTIVE DUCT AREA N. ALL WORK SHALL BE FURNISHED AND INSTALLED TO COMPLY WITH ALL STATE AND LOCAL CODES. O. H.VAC. CONTRACTOR SHALL PROVIDE AS -BUILT DRAWINGS TO GENERAL CONTRACTOR PRIOR TO FINAL PAYMENT. P. SMOKE DETECTORS WHERE REQUIRED BY MECHANICAL CODE SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR REFER TO ELECTRICAL DRAWINGS. SHEET METAL SARRA/OA/EA DUCTWORK, IF USED, SHALL COMPLY WITH THE FOLLOWING GAUGES: DIMENSION Of SHEET METAL LONGEST SIDE DUCT DIAMETER GAUGES STEEL THRIJ 12" 0"-12" 26 13" TO 30" 13" TO 18" 24 R. ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS, AND CONNECTIONS IN DUCTWORK MUST BE SECURELY SEALED USING WELDMENTS: MECHANICAL FASTENERS WITH SEALS, GASKETS, OR MASTICS: MESH AND MASTIC SEALING SYSTEMS: OR TAPES. TAPES AND MASTICS MUST BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A OR UL 1815. TAPES AND MASTICS USED TO SEAL DUCTWORK LISTED AND LABELED IN ACCORDANCE WITH UL 181A SHALL BE MARKED "ISIA-P" FOR PRESSURE - SENSITIVE TAPE. "181A-M" FOR MASTIC OR 981A-14" FOR HEAT -SENSITIVE TAPE. TAPES AND MASTICS USED TO SEAL FLEXIBLE AIR DUCTS AND FLEXIBLE AIR CONNECTORS SHALL COMPLY WITH UL 1815 AND SHALL BE MARKED "1815-FX" FOR PRESSURE -SENSITIVE TAPE OR "016-11" FOR MASTIC. DUCT CONNECTIONS TO FLANCsES OF AIR DISTRIBUTION SYSTEM EQUIPMENT SHALL BE SEALED AND MECHANICALLY FASTENED. MECHANICAL FASTNERS FOR USE WITH FLEXIBLE NONMETALLIC AIR DUCTS SHALL COMPLY WITH UL 1818 AND SHALL BE MARKED ISIB-C. UNLISTED DUCT TAPE IS NOT PERMITTED AS A SEALANT ON ANY METAL DUCTS. H.VA.C. CONTRACTOR TO VERIFY CONNECTIONS IN EXISTING DUCTWORK AND REPAIR / REPLACE AS NEEDED. S. MECHANICAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE USED WHEN CONNECTING DUCTS TO FANS OR OTHER AIR DISTRIBUTION EQUIPMENT, INCLUDING MULTIPLE -ZONE. T. OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE OWNER THAT INCLUDES AT LEAST THE FOLLOWING INFORMATION: a.) EQUIPMENT CAPACITY (INPUT AND OUTPUT) AND REQUIRED MAINTENANCE ACTIONS. bJ EQUIPMENT OPERATION AND MAINTENANCE MANUALS. e.) H.VAC. SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING SCHEMATICS, AND CONTROL DRAWINGS, AT CONTROL DEVICES, OR FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING COMMENTS. dJ COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. U. EACH EXISTING SUPPLY AIR OUTLET OR DIFFUSER TO HAVE ITS OWN BALANCING DEVICE. H.vA.C. CONTRACTOR TO FIELD VERIFY ACCEPTABLE BALANCING DEVICES INCLUDE ADJUSTABLE DAMPERS LOCATED WITHIN THE DUCTWORK, TERMINAL DEVICES, AND SUPPLY AIR DIFFUSERS. v. THE BACK SIDE OF ALL DIFFUSERS SHALL BE INSULATED BY H.VA.C. CONTRACTOR G &Ao4 h AP . s if ti. Xda 9� Ems, 5142 Madison Avenue, Suite 4 Indianapolis, IN 46227 )317) 783-2343 No. ROBERT E. BEAMAN N AROD033778 PROJECT NO.: 1801 A DRAWN BY: bad CHK. BY: DATE: AUGUST 21, 2018 REVISIONS: 0 9Y1 'r. 1 a Miiiiiiiiiiiiiw 2