HomeMy WebLinkAboutM-2 Schedules Notes and Details-SS-082318H.v.A.C. UNIt SCHEDULE
OU-1 / AHU-I
01.1-2 / AHU-2
CU-3 / AHU-3
MANUFACTURER
TEMPSTAR (5 TON)
TEMPSTAR (5 TON)
TEMPSTAR (5 TON)
MODEL NO.
CU-1-N4H46OAK5100
CU-2-N41146OAK5100
CU-3-N4446OAK5100
AHU-I-FEM4X6000AT
AHU-2-FEM4X6000AT
AHU-3-FEM4X600CAT
BTUH OUTPUT (MIN.)
35,400
35,400
35,400
BTUH OUTPUT (MAX.)
51000
51000
51000
TOTAL COOLING CAPACITY
51500
51,500
51500
LINE VOLTAGE
CU-1-20SA0160
CU-2-20SA0160
0U-3-208/10/60
AHU-1-208/10/60
A411-2-208/10/60
AHU-3-208/10/60
SUPPLY AIR CFM
1000
Iwo
low
RETURN AIR CFM
ldl
Ib50
Ib50
OUTSIDE AIR CR1
150
150
150
ESP.
05"
05"
05"
NOTE:
I. REFERENCE ELECTRICAL
DRAWINGS FOR DUCT MOUNTED SMOKE DETECTOR LOCATIONS.
2. NEW UNITS TO HAVE A MINIMUM MID E.EUR. / 140 S.E.EJR.
3. UNITS TO HAVE AN ECONOMIZER, WHERE APPLICABLE.
4. UNITS WILL BE SUPPLIED WITH PROGRAMMABLE THERMOSTATS.
5. AIR HANDLERS TO BE FURNISHED WITH U EHK25AKNI, 25KW ELECTRIC HEATER w/
SINGLE POINT WIRING KIT, EACH.
AIR BALANCE SCHEDULE
ITEM
OA.
R.A.
SA EA.
PRESSURE
CU-1 / AHU-I
150
1650
U800 ----
.150
CU-2 / AHU-2
150
11
1000 ----
.150
CU-3 / AHU-3
150
Ill
IAA ----
+150
EF-I (EX) ---- ---- ---- -100 -100
Er-2 (EX) ---- ---- ---- -100 -100
-0TAL5 450 4,950 5,400 -200 +250
;AN SCHEDULE
MARK
MFR. MODEL
SERVICE
Ow S.P HP VOLTAGE
EF-1 (EX)
EF-2 (EX)
EXISTING -------
EXISTING - ... ---
RR EXHAUST
RR EXHAUST
100 ---- -----------------
100 ---- -----------------
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 06/05/19
H.v.A.C. GENERAL NOtES:
A. NEW H.VAC. UNITS TO HAVE MOTORIZED OUTSIDE AIR DAMPER OUTSIDE AIR DAMPER TO CLOSE
AUTOMATICALLY IN UNOCCUPIED MODE.
B. ALL NEW SUPPLY, RETURN DUCTS AND OUTSIDE AIR DUCTS INSIDE BUILDING SHALL BE INSULATED
EXTERNALLY WITH 1 1/2" THICK F15ERSLASS WITH A DENSITY OF 15 POUNDS PER CUBIC FOOT AND BE
COMPLETE WITH VAPOR BARRIER JACKET. ALL DUCT INSULATION, TAPE COVERINGS, AND FLEXIBLE
CONNECTORS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED
RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM ES4. ALL SAlRAJO. A. DUCT INSULATION SHALL
HAVE A MINIMUM "R" VALUE EQUAL OR GREATER THAN "R-6" FOR DUCTS N CONDITIONED SPACES
(R-8 FOR UNCONDITIONED SPACES). ALL INSULATION SHALL MEET REQUIREMENTS OF STATE AND
LOCAL CODES AND MECHANICAL CODES. H.VAC. CONTRACTOR TO VERIFY EXISTING DUCT INSULATION.
C. ANY NEW FLEXIBLE DUCTS SHALL BE METAL FLEX CLASS I TYPE 500 AIR DUCT AND SHALL BE U.L.
LISTED AND HAVE 1" THICK FIBERGLASS INSULATION ENCASED IN A VAPOR BARRIER OF SEAMLESS,
NON-COMBUSTIBLE, CO -POLYMER PLASTIC. ALL NEW FLEX DUCT INSULATION SHALL BE EQUAL TO
R-6 OR GREATER
D. ALL NEW FLEXIBLE DUCTS SHALL BE CONNECTED TO EXISTING TRUNK OR BRANCH DUCTS WITH A
MINIMUM OF THREE SHEET METAL SCREWS AT EACH CONNECTION AND BE TAPED TO PROVIDE AN
AIR TIGHT SEAL. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 5'-011
.
E. NEW FLEXIBLE DUCT HANGER STRIPS, IF NEEDED, SHALL BE MINIMUM 2" WIDE BY 22 GAUGE
GALVANIZED METAL.
F. ANY NEW DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE MOST RECENT PUBLISHED
5MACNA STANDARDS FOR LOW -VELOCITY, LCW-PRESSURE DUCTS.
G. ALL NEW CONTROL WIRING SHALL BE FURNISHED AND INSTALLED BY H.VA.C. CCNTRACTOR
H. EXISTING WATER HEATER TO REMAIN.
J. PROVIDE NEOPRENE FLEXIBLE CONNECTIONS AT SUPPLY t RETURN DUCT CONNECTIONS ON
AIR HANDLER UNITS.
K. H.VAC. CONTRACTOR SHALL RE -BALANCE H.VAC. SYSTEM TO AIR QUANTITIES INDICATED. PROVIDE
TYPED WRITTEN REPORT TO OWNER UPON COMPLETION.
L. H.VA.C. CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID TO VERIFY ALL EXISTING CONDITIONS,
AND VERIFY STRUCTURAL LOADS PRIOR TO INSTALLATION OF NEW EQUIPMENT. CONSULT STRUCTURAL
ENGINEER AS NEEDED.
M. H.VAC. CONTRACTOR SHALL FIELD VERIFY DUCT CLEARANCE/ SPACE FOR ROUTING DUCTS PRIOR
TO SUBMITTING BID. CONTRACTOR MAY ALTER DUCT SIZING TO ACCOMODATE CLEARANCES ABOVE
CEILINGS, BUT MIDST MAINTAIN SAME EFFECTIVE DUCT AREA
N. ALL WORK SHALL BE FURNISHED AND INSTALLED TO COMPLY WITH ALL STATE AND LOCAL CODES.
O. H.VAC. CONTRACTOR SHALL PROVIDE AS -BUILT DRAWINGS TO GENERAL CONTRACTOR PRIOR TO
FINAL PAYMENT.
P. SMOKE DETECTORS WHERE REQUIRED BY MECHANICAL CODE SHALL BE FURNISHED AND INSTALLED
BY THE ELECTRICAL CONTRACTOR REFER TO ELECTRICAL DRAWINGS.
SHEET METAL SARRA/OA/EA DUCTWORK, IF USED, SHALL COMPLY WITH THE FOLLOWING GAUGES:
DIMENSION Of SHEET METAL
LONGEST SIDE DUCT DIAMETER GAUGES STEEL
THRIJ 12" 0"-12" 26
13" TO 30" 13" TO 18" 24
R. ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS, AND CONNECTIONS IN DUCTWORK MUST BE
SECURELY SEALED USING WELDMENTS: MECHANICAL FASTENERS WITH SEALS, GASKETS, OR MASTICS:
MESH AND MASTIC SEALING SYSTEMS: OR TAPES. TAPES AND MASTICS MUST BE LISTED AND
LABELED IN ACCORDANCE WITH UL 181A OR UL 1815. TAPES AND MASTICS USED TO SEAL DUCTWORK
LISTED AND LABELED IN ACCORDANCE WITH UL 181A SHALL BE MARKED "ISIA-P" FOR PRESSURE -
SENSITIVE TAPE. "181A-M" FOR MASTIC OR 981A-14" FOR HEAT -SENSITIVE TAPE. TAPES AND MASTICS
USED TO SEAL FLEXIBLE AIR DUCTS AND FLEXIBLE AIR CONNECTORS SHALL COMPLY WITH UL 1815
AND SHALL BE MARKED "1815-FX" FOR PRESSURE -SENSITIVE TAPE OR "016-11" FOR MASTIC. DUCT
CONNECTIONS TO FLANCsES OF AIR DISTRIBUTION SYSTEM EQUIPMENT SHALL BE SEALED AND
MECHANICALLY FASTENED. MECHANICAL FASTNERS FOR USE WITH FLEXIBLE NONMETALLIC AIR
DUCTS SHALL COMPLY WITH UL 1818 AND SHALL BE MARKED ISIB-C. UNLISTED DUCT TAPE IS NOT
PERMITTED AS A SEALANT ON ANY METAL DUCTS. H.VA.C. CONTRACTOR TO VERIFY CONNECTIONS
IN EXISTING DUCTWORK AND REPAIR / REPLACE AS NEEDED.
S. MECHANICAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE USED WHEN CONNECTING
DUCTS TO FANS OR OTHER AIR DISTRIBUTION EQUIPMENT, INCLUDING MULTIPLE -ZONE.
T. OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE OWNER THAT INCLUDES
AT LEAST THE FOLLOWING INFORMATION:
a.) EQUIPMENT CAPACITY (INPUT AND OUTPUT) AND REQUIRED MAINTENANCE ACTIONS.
bJ EQUIPMENT OPERATION AND MAINTENANCE MANUALS.
e.) H.VAC. SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING
SCHEMATICS, AND CONTROL DRAWINGS, AT CONTROL DEVICES, OR FOR DIGITAL CONTROL
SYSTEMS, IN PROGRAMMING COMMENTS.
dJ COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE.
U. EACH EXISTING SUPPLY AIR OUTLET OR DIFFUSER TO HAVE ITS OWN BALANCING DEVICE. H.vA.C.
CONTRACTOR TO FIELD VERIFY ACCEPTABLE BALANCING DEVICES INCLUDE ADJUSTABLE DAMPERS
LOCATED WITHIN THE DUCTWORK, TERMINAL DEVICES, AND SUPPLY AIR DIFFUSERS.
v. THE BACK SIDE OF ALL DIFFUSERS SHALL BE INSULATED BY H.VA.C. CONTRACTOR
G
&Ao4 h AP . s if ti.
Xda 9� Ems,
5142 Madison Avenue, Suite 4
Indianapolis, IN 46227
)317) 783-2343
No.
ROBERT E. BEAMAN N AROD033778
PROJECT NO.:
1801 A
DRAWN BY:
bad
CHK. BY:
DATE:
AUGUST 21, 2018
REVISIONS:
0 9Y1 'r. 1 a
Miiiiiiiiiiiiiw 2