Loading...
HomeMy WebLinkAboutP-2 Plumbing Notes and Details-SS-082318ASSUMED EXISTING IHi" WATER SERVICE IA ... __. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 06/05/19 \O SCA_E SEE ALSO 1/1=-I PLUMBING NOTES GENERAL NOTES A. PLUMBING CONTRACTOR IS TO FURNISH AND INSTALL ALL PLUMBING FIXTURES COMPLETE AS LISTED IN "PLUMBING FIXTURE SCHEDULE". B. ALL HANDICAP PLUMBING FIXTURES SHALL BE INSTALLED TO COMPLY WITH STATE AND LOCAL CODES. PLUMBING CONTRACTOR 5HALL FURNISH AND INSTALL CODE COMPLIANT TRAP WRAP ON ALL EXPOSED WATER 4 WASTE LINES FOR ALL HANDICAP ACCESSIBLE LAVATORIES. C. PLUMBING CONTRACTOR SHALL PROVIDE AS -BUILT DRAWINGS TO THE GENERAL CONTRACTOR PRIOR TO FINAL PAYMENT. D. ALL WOW SHALL BE INSTALLED TO COMPLY WITH LOCAL AND STATE PLUMBING CODE REQUIREMENTS, AND PER LOCAL HEALTH DEPARTMENT REQUIREMENTS. E. ALL PIPE PENETRATIONS IN EXTERIOR WALLS SHALL BE SEALED WATER -TIGHT WITH SILICONE CAULK F. PROVIDE FIRE STOPPING IN ALL PENETRATIONS OF FIRE RATED WALLS. G. PLUMBING CONTRACTOR SHALL COORDINATE ROUTING OF PLUMBING PIPING WITH MECHANICAL CONTRACTOR AND MECHANICAL DRAWINGS TO AVOID CONFLICT. Lu,i AND VENT PIPING A PLUMBING CONTRACTOR SHALL USE SCHEDULE 40 POLYVINYL CHLORIDE PIPE FOR ALL SOIL, WASTE AND VENT PIPING WHERE PERMITTED BY LOCAL CODES. WHERE PVC PIPING IS NOT PERMITTED BY LOCAL CODES, USE STANDARD WEIGHT CAST IRON PIPING. Al PIPING ABOVE GRADE MAY HAVE HUBLESS FITTINGS. PLASTIC PIPING SHALL NOT BE USED N RETURN AIR PLENUM. COORDINATE THIS REQUIREMENT WITH H.VA.C. CONTRACTOR PRIOR TO INSTALLATION. B. CONTRACTOR SHALL FIELD VERIFY INVERT ELEVATIONS OF ALL NEW AND EXISTING SANITARY SEWERS PRIOR TO ROUGH -IN. C. ELEVATION OF ALL FLOOR DRAINS SHALL BE HELD 142" BELOW FINISH FLOOR TILE. D. ALL CLEANOUTS SHALL BE INSTALLED FLUSH WITH FINISHED GRADE/FINISHED FLOORS. E. HOLD ALL PLUMBING VENTS A MINIMUM OF Ill FROM OUTSIDE AIR INTAKES. WHERE STATE OR LOCAL CODES REQUIRE MORE SEPARATION, PLUMBING CONTRACTOR SHALL OFFSET TO MEET THE MORE STRINGENT CODE ON H.VA.C. EQUIPMENT. COORDINATE LOCATION WITH H.VA.C. CONTRACTOR LuXi PIPING A. ALL WATER PIPING BELOW GRADE SHALL BE TYPE "L" SOFT TEMPERED COPPER AND ALL WATER PIPING ABOVE GRADE SHALL BE TYPE "L" HARD TEMPERED COPPER B. INSTALL I" FOAM RUBBER INSULATION ON ALL HOT AND COLD WATER PIPING BELOW AND ABOVE GRADE. ALL JOINTS IN INSULATION ARE TO BE TAPED. C. ALL DOMESTIC WATER PIPING SHALL BE DISINFECTED PRIOR TO USE BY BUILDING OCCUPANT. PLUMBING CONTRACTOR SHALL DISINFECT PER REQUIREMENTS OF LOCAL HEALTH DEPT., STATE/LOCAL PLUMBING CODE. D. ALL PLUMBING HOSE BIB65 OR VALVES WITH THREADED CONNECTIONS SHALL BE PROVIDED WITH VACUUM BREAKERS AND APPROVED MEANS OF BACKFLOW PREVENTION AS REQUIRED BY STATE AND LOCAL CODES. E. PROVIDE SHUT-OFF VALVES ON ALL EQUIPMENT AND STOP COCKS IN HOT AND COLD WATER PIPING TO ALL PLUMBING FIXTURES. F. PLUMBING CONTRACTOR SHALL PROVIDE DIELECTRIC UNIONS AT ALL PIPING CONNECTIONS WHERE DISSIMILAR METAL PIPING IS JOINED. G. ALL HOT AND COLD WATER, WASTE, AND VENT PIPING TO BE SUPPORTED PER LOCAL PLUMBING CODE. NATURAL GAS PIPING A CONTRACTOR SHALL COORDINATE INSTALLATION OF GAS METER WITH LOCAL GAS CO. REQUIREMENTS PRIOR TO INSTALLATION. B. GAS PIPING OPERATING AT PRESSURES HIGHER THAN I LB, WHERE INSTALLED IN BUILDING SHALL HAVE WELDED JOINTS, PIPING BELOW I LB. PRESSURE SHALL HAVE THREADED CONNECTIONS. C. ALL GAS PIPING SHALL BE STANDARD WEIGHT SCHEDULE 40 BLACK STEEL PIPE. PIPE SHALL BE THREADED OR WELDED AS DIRECTED BY LOCAL GAS CO. AND STATE/LOCAL PLUMBING CODES. D. PROVIDE ALL GAS PIPING COMPLETE WITH ALL REQUIRED FITTINGS, STRAPS, HANGERS, SUPPORTS, ETC. OBTAIN ALL REQUIRED INSPECTIONS AND APPROVALS. ALL GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF NFPA 54 AND ANY APPLICABLE STATE OR LOCAL CODES OR REGULATIONS. E. ALL GAS PIPING, WHERE ROUTED ON ROOF, SHALL BE SUPPORTED BY ROOF PIPE SUPPORT 10'-0" O.C_ F. PAINT Al GAS PIPING EXPOSED TO WEATHER WITH (2) COATS OF "RIUSTOLEUM" OR EQUAL PAINT. COLOR TO BE SELECTED BY OWNER OR GENERAL CONTRACTOR G. PLUMBING CONTRACTOR TO MAKE FINAL CONNECTION TO ALL GAS FIND EQUIPMENT. PROVIDE GAS SHUT-OFF VALVE AND 6" DIRT LEG AT EACH CONNECTION. H. PLUMBING CONTRACTOR SHALL PAINT GAS PIPING EXPOSED INSIDE BELOW CEILING GRID (COORDINATE COLOR w/ OWNER). AuB.akxs St E, , 5142 Madison Avenue, Suite 4 Indianapolis, IN 46227 (317) 783-2343 s TE, No. II_p ROBERT E. BEAMAN R AR00033778 PROJECT NO.: 1801 A DRAWN BY: bai CHK. BY: DATE: AUGUST 10, 2018 REVISIONS: Pw1111111111112