HomeMy WebLinkAboutSmock Fansler/Eng/CO #3/3,270/Gray Road Improvements – Project #16-ENG-16 CITY OF CARMEL TO: Jeremy Kashman CONTRACT CHANGE ORDER NO: 3 City Engineer DATE: 5-6-19 City of Carmel PROJECT NAME:Gray Rd 16-ENG-16.54,55 One Civic Square CITY REQ. NO: Carmel, IN 46032 CITY PO NO: CITY PO DATE: I. You are directed to make the following changes in this Contract: 4qR°tit, Additional large tree removal and stump grinding at easternmost property along new Masonry wall at 1260'& Gray �C1t ITEM AMOUNT SCHEDULED ADJUSTMENT f+)OR(-)DAYS II. The following referenced documents further describe the changes outlined in paragraph I, and are to be considered a part of this Change Order R.F.P.: W.D.C. NO: Other: See contract change request No.003 The changes result in the following adjustment of Contract Price and Contract Time: Contract price prior to this change order $861..360.50 Contract price will be increased/decreased by this Change Order $3.270.00 New Contract Price including this Change Order $864,630.50 Contract Time prior to this Change Order Days Completion Date Net increased/decreased resulting from this Change Order Days Current Contract Time including this Change Order Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and Time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved Recommended Accepted L Dan Greskamp Smock Fansler 61 4 1 - V `ll — ENGINEER CONTRACTOR ames Brainard, Mayor One Civic Square 2910 W. Minnesota St. ADDRESS ADDRESS ere • - •:n, gine Carmel, IN 46032 Indpls, IN 46241 //______ ir City/Stat /Zip City/State/Zip Ma • Burke, r. ber By: By: � Dan Gre m e Davee V.P. tori Wat-:(, Member Phone: 3/7--7/4- ✓6 Phone: 3t7`tyi.'-s31 f . -61i • / • �Date: 5 9//9 Date: ���( ��q Ch stine Pauley,Clerk-Treasurer I?-OQc CITY OF CARMEL TO: City of Carmel CONTRACT CHANGE REQUEST NO.: 003 Engineering Department DATE: April 25, 2018 One Civic square PROJECT NAME: 16-ENG-16,54,55 Gray Road Roundabouts Carmel, IN 46032 FROM: IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE REFERENCED CONTRACT. I. SCOPE OF WORK(USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER CONTRACTS INVOLVED.) Additional large tree removal and stump grinding at easternmost property along new Masonry Wall at 126th & Gray 2. REASON FOR CHANGE: Resident at this property made arrangements with the City to remove one large pine tree and grind down the stump. 3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: Add $3,270.00 4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE THE CHANGE IN WORK SCOPE? -YES X -NO -(CALENDAR DAYS) 5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE THE CHANGE IN WORK SCOPE? x -YES -NO IF NO,TRADE(S): Tree Removal Subcontractor NO. OF PERSONNEL: 3 DURATION: 1 day each for removal and stump grinding 6. IDENTIFICATION OF ATTACHMENTS: DATE: DATE: PREPARED REVIEWED BY: Smock Fansler REVIEWED BY: ENGINEER Comments and Recommendation: AR-5 Version 2016-08-31