HomeMy WebLinkAboutA6.3 - 190204RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Carmel (�
yVT�tanRJN,aA�L
DATE: \ 06/17/19
107 108
LOUNI
KITCHEN WORK
AREA
2'-0"
11A .52•. 97"
�WRAP i" GYP.
ED. AT OPENING
IN WALL AS
SHOWN
PROVIDE 1"
FILLET AT
CORNER OF
SOLID SURFACE,
TYPICAL ALL 4
CORNERS.
SOLID SURFACE
PASS-THRU,
SS-3. SEE
ROOM FINISH
SCHEDULE
a
WALL BELOW >Z
KID'S COOKING
KITCHEN
'h^
2/A6.3
PLAN OF PASS-THRU I
314' = 1'-0"
2'-0'
HWALL BEYOND
x
SOLID SURFACE
PASS-THRU, SS-3,
OVER (2) LAYERS
I" PLYWOOD. SEE
ROOM FINISH
SCHEDULE
CURRAN
ARCHITECTURE
5719 LAWTON LOOP E. DR. #212
INDIANAPOLIS, IN 46216
O :: 317.288.0681
F :: 317. 288. 0753
,.cc- oksrrgrR
No. `y
• AR19600043'. •
nAX a _
WOOD STUD
WITH
'/'' V' •- 7 ✓��� WITH ONE LAYERGYP.
BD. EACH
�
SIDE EXPIRES /31/19
SIDE
THEI
THIS DRAWING AND THE IDEAS, DESIGNS
AND CCNCiTSCARE
THE O(CUBRAN AR PROP
:.F
OF CURRAN AR DARE O
ARCHITECTURE, AND ARE NOT
REPROTUC
4" RUBBER BASE. To 6E USED WHOLE OR
IN THE WRITTEN
,WITHOUT THE
SEE ROOM FINISH CONSENT CUR
CURRAN ARCHITECTURE.
CgJSENT A
RT
SCHEDULE, d CWMIGHi 3019. CUftPAN MMRECiUftE
SECTION THRU PASS-THRU 2
314' = 1'-0"
SOLID SURFACE
COUNTER, SS-3,
OVER (2) LAYERS 2
PLYWOOD. SEE
ROOM FINISH
SCHEDULE. DEPTH
OF COUNTER TO BE
1'-9".
SUPPORT BRACKET
SPACED AS SHOWN
6
BAR HEIGHT COUNTER ELEVATION 3
3l4" = E-0"
PLAYSCHOOL
AT LEGACY
GYM ADDITION
14454 COMMUNITY DRIVE
CARMEL, INDIANA 46032
REVIEW SCT 1.16.18
BID SET '1.26.18
PERMIT S-T 02.04.19
zLADDENDUM DI 02.04.19
7 9
NTERIOR
ELEVATIONS
A6.3