HomeMy WebLinkAboutC4.1 - 180622APPLY
E TO
SE
pH TO
L NEEDED
ING
SEEDED. APPILY(( 23 POIUNDS OF 12-12 12LAANNALYSS FERTIL01 ER RgRE EQUIVALENT PER
TEST. A1000 PPLICATA OFXI1MATELY 50 LBSL OF AMMONIUM000 POUNDS ER NITRATEE)OR BEON AREAS LIZE OW AIN CORDIORGAN� ETO
MATTER AND FERTIUTY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND UME INTO THE SOIL TO A DEPTH OF 2-3 INCHES
WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE
PERMANENT SEED MIXTURE CHART. WHILE CONSIDERING BEST SEEDING DATES.
IF PERMANENT SEEDING IS NOT P RMITTED USE TEMPORARY SEEDING
UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS
SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE
SEED TOLERANCE CHART.
SE
a
W
z-
pE�
W
V
(0
W
v
W%
SOIL
3U3
wy�
MEL'!
Ii
3U3
ay
to
�?
L93U3
og
rci
W Q
SOIL
more
sJ
LD�
�s�
CONDITION
S
ww
igw
pj
LOW
TOLERANCE
u�
��
LLz
33
w
WFT
NORM
DRY
v�i�
W2i
GEN.
SOIL
SPRAY
CREEPING RED FESCUE
2
1
2
1
1
1
MID.
1
20-25
12-18
7-21
S
FESTUCA RUBRA
KENTUCKY BLUEGRASS
2
1
2
1
1
1
MED.
1
20-35
12-18
10-20
MT
PDA PROTINSIS
TALL FESCUE
FESTUCA L. ARUNDINACEA
2
1
1
1
1
1
LOW
1
24-35
24-36
5-14
T
PERENNIAL RYEGRASS
2
1
2
-
1
2
MED.
2
15-20
12-18
5-10
MT
LOLLUM PERENNE
HIGH
CROWNVETCH
_
1
1
2
-
-
LOW
1
5-10
24
14-21
T
CORONILLA VARLA
RED CLOVER
TRIFOLIUM PROTENSE
-
1
-
2
-
-
MED.
1
7-10
18
5-10
S
S
WHEAT OR RYE
OATS
ANNUAL RYEGRASS
NON -IRRIGATED'
RANKING;
SALT TOLERANCE (TO BOTH SOIL SALTS & SPEW
IRRIGATED
1 GOOD
T TOLERANCE
FERTILIZER NOTE
DORMANT
2 MEDIUM
MT MEDIUM TOLERANCE
SEEDING "
- NOT TOLERANT
S SLIGHT TOLERANCE
DO NOT USE P112RHOfROUS CONTAINING FERTILIZERS
SEED TOLERANCE
IS UNLESS SOIL TESTS SHOW A PHOSPHOROUS DEFICIENCY.
SPECIES
SEEDING RATE
SUITABLE PH
SITE SUITABILITY
LBS/ACRE
L85�1000
S FT.
DROUGHTY
WELL
DRAINED
WET
LEVEL AND SLOPING, OPEN AREAS
1. TALL FESCUE
35
.e
5.5-8.3
2
1
2
2. TALL FESCUE1
25
.6
1 5.5-8.3
1
RED CLOVER
1 5
.12
3. KENTUCKY BLUEGRASS
1 1
.4
1 5.8-7.52
1
CREEPING RED FESCUE
1 15
1 .4
STEEP BANKS AND CUTS
4. TALL FESCUE
1 15
1 .4
1 5.8-7.5
1 2
1
2
KEW CKY BLUEGRASS
.6
5. TALL FESCUE
35
.8
5.5-8.3
2
1
EMERALD CROWNVETCH•"
1 10
1 .25
LAWNS AND HIGH MAINTENANCE AREAS
6. KEMUCKY BLUEGRASS1
40
1 .9
1 5.8-7.5
1 2
1
CREEPING RED FESCUE
40
UI
1. PERENNIAL RYEGRASS1
170
1 4.0
1 5.0-7.5
URF PE
8. TALL FESCUE
1 170
1 4.0
1 5.5-8F5
1 2
1 1
1 2
1 - PREFERRED 2 - WILL TOLERATE '• INOCULATE WITH SPECIFIC INOCULANT.
SEED TOLERANCE CHART
SEEDING DETAIL
TEMPORARY SEEDING DATES
FLEXSTORM CATCH -IT FILTERS FOR TEMPORARY INLET PROTECTION
PRODUCT SELECTION AND SPECIFICATION DRAWING
®®®®®®®®®®®®
� " ■■
■■■®®■■■■■■■
■■■■e�.oeee�
PERMANENT SEEDING DATES
®®®®®®®®®®®®
IRRIGATION NEEDED DURING THIS PERIOD. TO CONTROL
EROSION AT TIMES OTHER THAN IN THE SHADED AREAS.
USE MULCH.
' LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS
IF MULCH IS APPLIED.
INCREASE SEEDING APPUCATION BY 50%.
TEMPORARY SEEDINGS
TYPE OF SEED
1000 SQ.
FT. ACRE
REMARKS
WHEAT OR RYE
3.5 LBS.
2 BID.
COVER
SEED
1- TO 1 1/2" DEEP
SPRING OATS
2.3 CBS.
3 BU.
COVER
SEED
1" DEEP
ANNUAL RYEGRASS
1 LB.
40 U3.
COVER
SEED
1 4" DEEP
' NOT NECESSARY WHERE MULCH IS APPLIED.
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
AS NEEDED
PRIOR TO CLEARING AND GRADING
SILT FENCE
WEEKLY, AFTER
STORM
EVENTS PAID
AS
NEEDED
PRIOR
TO CLEARING AND GRADING
EXISTING INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND
AS
NEEDED
PRIOR TO CLEARING AND GRADING
TREE PROTECTION
WEEKLY, AFTER
STORM
EVENTS PAID
AS
NEEDED
PRIOR
TO CLEARING AND GRADING
TEMPORARY DWERSIONS
WEEKLY, AFTER
STORM
EVENTS AND
AS
NEEDED
ALONG
WITH ROUGH GRADING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER
ROUGH GRADING
PERMANENT SEEDING
WATER AS NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLETION
EROSION CONTROL MATTING
WEEKLY, AFTER
STORM
EVENTS AND
AS
NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLETION
ROCK CHECK DAM
WEEKLY, AFTER
STORM
EVENTS AND
AS
NEEDED
AFTER
FINISH GRADING - AS SOON AS PRACTICAL
UPON COMPLETION
INLET PROTECTION
WEEKLY, AFTER
STORM
EVENTS AND
AS
NEEDED
AFTER
EACH INLET IS PLACED
REMOVAL OF TREE PROTECTION
N/A
AFTER
PERMANENT SEEDING
REMOVAL OF STRAW BALES
N/A
AFTER
ALL AREAS DRAINING TO THESE AREAS ARE
STABILIZED
REMOVAL OF INLET PROTECTION
N/A
AFTER
ALL AREAS DRAINING TO THESE AREAS ARE
STABIUZED
REMOVAL OF SILT FENCE
N/A
AFTER
ALL AREAS DRAINING TO THESE AREAS ARE
STABILIZED
EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS
1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY
EROSION BELOW THE BIANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET
COVERING IT, ADD SOIL. RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABUSHMENT. CHECK THE TREATED AREA PERIODICALLY.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS:
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOP DRESS WITH CLEAN STONE AS NEEDED.
RELEASED FOR CONSTRUCTION SHOULD ONLY BE USED FOHEUWLATERR ISDS
1SIN.
Subject to compliance WRh all regulations MEDWTELY.
"a c1..1..."d I"...a P.A..
City of Camlel (�
�MY�V'�13atiYWML_
DATE: \ 06/17/19
SILT FENCE
mum
BEEHIVE INLET OR
DRAINAGE COVER
SILT FENCE EXTENDS
8" BELOW FINISHED GRADE
NOTE:
1. SEE SILT FENCE DETAIL
FOR MATERIAL SPECIFICATIONS.
2. SILT FENCE SHALL BE
PREASSEMBLED BY SUPPLIER.
oz SILT FENCE INLET
PRnTFCTInN
NOT TO SCALE
ROCK CHECK DAM MAINTENANCE REQUIREMENTS:
1. INSPECT ROCK CHECK DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY
SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN,
TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES.
2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION
ACTIVITIES AND REPAIR IMMEDIATELY.
3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ALL
ROCK CHECK DAMS AND SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT.
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRAD, AND STABILIZE.
�_7_1 u m.vasssmcss <w,77
1L
MN
r..�.wN..
MMIRD
aE
59
UAW
I°
MERKOLAwwo
18
WWI
n a."n.r , ..a., m411N10 r.. MIN
Amy
UP
2!2
ft
rail
ftl�
C
1 42
�
MOVES.
1. ALL FRAMING Is corvsTRllcTEo OF
CORPOSON RESISTANT STEEL (ZINC
PIAtED OR GALVANIZED) FOR ] YEAR
MINIMUM SERVICE LIFE.
2. UPON ORDERING CONFlflM61V10N BE THE
DOT (OCCULT, PRECAST OR CASTING
MAKE AND MODEL, OR DETNIED
DIMEN90NAL FORMS MUST BE PROVIDED
TO CONFIGURE µ0 ASSEMBLE YOUR
CUSTOMUED RF]ISTORM INLET BYTE.
PART NUMBER ALONE IS NOT SUPICIENT.
3. FOR WRITTEN SPECIRCATONS AMID
MN MAKES GUIDELINES AST
MWW.INLEIFlLIFAS.COM
HSTMI.TDN.
1. REMOVE GRATE
�
2. DROP FLEMSTORM INLET
FILTER ONTO LOAD BEWIXC
ALL PRODUCES MANUFACTURED
BY INLET A PIPE PROTECTION. INC
UP OF CASTING
A WEIGH OF ADS, INC.
CONCHES STRUCTURE
WWN.INIETBLTERS.COM
Xal 2B]-e855 PH
3. REPLACE GRATE
a.TD ass-Un F
F INLETELTERS.roM
C PPF _W:m$yHiF[ffiO
\\\\BGC ROAD
8Q.
\\
#2 COARSEN
AGGREGATE
GEOTEXTILE FABRIC TO
FOUNDATION (ESPECIALLY
WHERE WETNESS IS AP
03 TEMPORARY CONSTRUCTION ENTRANCE
NOT TO SCALE
10' MIN.
tI
B B
w - -
a
I I I I I I I I
10 MIL PLAN
PLASTIC LINING TYPE "ABOVE GRADE"
WITH STRAW BALES
REVISION RECORD
DATE
DESCRIPTION
IDES
BY
I APP
BY
6- FACE OF ♦%8 STONE
OVER RIP -RAP STONE.
2:1 SIDE SLOPE FILTER FABRIC
OR FLATTER
9" LOWER THAN
TOP OF BANKS
OF SWALE
2:1 SIDE SLOPET
OR FLATTER \
6" FACE OF#8 STONE
OVER RIP- P STONE.
FILTER FABRIC
01 ROCK CHECK DAM
C4.1 NOT TO SCALE
1. PLACE THE END POST OF THE SECOND FENCE
ST INSIDE THE END POST OF THE FIRST FENCE.
2. ROTATE BOTH POSTS AT LEAST 180' IN A
CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL
WITH THE FABRIC MATERIAL.
3. DRIVE BOTH POSTS A MINIMUM OF 18" INTO THE
GROUND AND BURY THE FLAP.
JOINT DETAIL
EXTEND FSABR�C ����������� PNOS 5 SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
IN SURFACE �/ /\ SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
BE OF \ DURING INSTALLATIONANDFFICIENT TH TO 0 SUPPORT A PLIED
2• FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
CONSISTING OF STRONG, ROT RESISTANT,
1 /8" DOA. MATERIALS RESISTANT TO DETERIORATION FROM
STEEL WIRE < ULTRAVIOLET AND HEAT EXPOSURE.
(TYIP) os SILT FENCE CONSTRUCTION
STAPLE DETAIL NOT TO SCALE
BALE (TYP.)
CONCRETE WASHOUT
SIGN DETAIL
(OR EQUIVALENT)
BLACK LETTERS
6" HEIGHT
0.5" LAG
SCREWS
WOOD POST
3"X 3"X 8'
STAPLES
10 MIL
BINDING WIRE
(2 PER BALE)
PLASTIC LINING
NOTES:
1. ACTUAL LAYOUT DETERMINED
IN FIELD.
2. THE CONCRETE WASHOUT SIGN
STRAW BALE
SHALL BE INSTALLED WITHIN
SECTION B-B
30 FT. OF THE TEMPORARY
NATIVE MATERIAL
WOOD OR METAL
CONCRETE WASHOUT FACILITY.
(OPTIONAL)
STAKES (2 PER BALE)
oa CONCRETE WASHOUT BMP
C4.1 NOT TO SCALE
TYPE
I LONGEVITY
MAX. SLOPE
APPLICATION
S75
10 MONTHS
3'.1
LOW FLOW SWALES
R575
60 DAYS
3.1
LOW FLOW SWALES
S150
10 MONTHS
2'.1
MODERATE DISCHARGE SWALES
DS150
60 DAYS
2a
MODERATE DISCHARGE SWALES
SC150
2 YEARS
1.1
MEDIUM DISCHARGE SWATS
C125
3 YEARS
>1.1
HIGH DISCHARGE SWALES
1
THE EDGES OF THE BLANKET SHOULD BE
BUTTED AGAINST EACH OTHER THE EDGES OF
THE SCC225 SHOULD BE OVERLAPPED 2.
3
THE BLANKET SHOULD NOT BE
STRETCHED BUT ALLOWED To
wY LOOSELY ON THE SOIL
SURFACE TO ACHIEVE MAMMON
BANKER TO SOIL CONTACT.
2
ON SLOPE APPLICATIONS, THE
TOP OF THE BLANKET SHOULD
BE "SLOTTED IN' ABOVE THE
BREAK OF THE SLOPE OR AT A
MINIMUM. STAPLED IN PLACE
WITH STAPLES 6 APART ON THE
ENO OF THE BUNKLT.
4
ON LONG SLOPES, THE
ENDS OF THE
BLANKETS SHOULD BE
OVERAPPED 4 - 6" IN
A "SHINGLE EFTECT'.
6
PREPARATION OF THE SEED
BED. INCLUDING APPLICATION
OF LIME. FERTILIZER AND
SEED SHOULD BE CONDUCTE
AS NORMAL PRIOR To
INSTALLATION OF BLANKET.
- s
111K`
IN HIGH VELOCITY CHANNEL
t
APPLICATIONS, CHECK SLOTS SHOULD
BE ESTABLISHED EVERY 35 ID 4By
AC
THE SHOU BE ET SIDE Er
SHOULD
DEEP WITH B STAPLED
6' DEEP THE EHE
06 EROSION BLANKET INSATLLATION
IN THE BOTTOM OF THE SLOT. THEN
07 S
B4CKFlLLED µD sEEOEO.
NITO SCALE
U
z
z
z
IL
_IL
UE]
❑
O
a
1,0
ED
CA�
OI
00
O
W
v
N
w+>�
x
I-Y
' N 0 o
LL
U5
O
Ur)
rA
�ll
L0
�O
a
E
�C)000
a
z
y�o�
W
d3 M
x
�C)
VDO a
,i '11SE,AC�QOGT,��•
teY' moo••
i1
NO
PE10910647 •: Lf
.D :•
STATE OF Q,
46 AM;
N
,WW,,W�
11111L\ W,,,,,
LAS
DATE:
06/22/2018
DWN
BY:
KPB
CHKD. BY:
BSC
SCALE:
N/A
DATE:
06 22/18
of
N�N
�I
1�
O
Q
/U/
W
O
^
W
m
GM
I19
/w\
I>
a
F-I
y
M
�5
F
O
\
���..II
O�
L�-I
1--1
24
xL0
a
/U/�/�
VL
N"I
W
W
L�/
H�F-I
-4�/�
�x
`
V1
PROJECT NUMBER
TPS.007
DRAWING NUMBER
C41a 1
SHEET 7 OF 16