Loading...
HomeMy WebLinkAboutC6.0 - 180622•-.-. .- • . Asp L >vo�>•o QQr 4111 __ �i�7�lr�G�14.444.4.�44.4444�i >r�oE�r i �..:r7�.� ��I� .... ,. ipis,.....ii•,o�,...•..r..:.v..;,.�.0l,v..,►�t►`��►������ • ■J ................. - - • i ' .'�♦��„♦♦C♦♦�.'�♦.e�..'� i�OAF E : ' PROPOSED CONCRETE PAVEMENT SEE DETAIL 01/C7.0 • PROPOSED CONCRETE SIDEWALK PAVEMENT 1- - 1 DUN ASPHALT PAVEMENT - SEE DETAIL 02/N 1" - 30#/SYD. HMA BITUMINOUS SURFACE LATE 1 .0 3" - 330#/SYD. HMA BITUMINOUS INTERMEDIATE 19.Omm ON 8" COMPACTED AGGREGATE #53 BASE ON ENGR. APPROVED GEOGRID** ON COMPACTED SUBGRADE OR TREATED SUBGRADE. ** DESIGNATES CONSTRUCTION ALTERNATE UUU.DO PROPOSED CENTER-UNE GRADE 755.0 PROPOSED TOP OF CURB ELEVATION 754.5 PROPOSED CURB GUTTER ELEVATION PLAN NOTES: O 6-INCH STRAIGHT CONC. CURB, REFER TO CARMEL STD. DWG. 10-16 cQ COMBINED CURB & WALK. SEE DETAIL 04/C7.0 w 2-FOOT CONC. CHAIRBACK CURB Se GUTTER. REFER TO CARMEL STD. DWG. 10-14 O CONCRETE WALK. REFER TO CARMEL STD. DWG. 10-18 ® 2-FOOT CONC. DEPRESSED CURB & GUTTER. REFER TO CARMEL STD. DWG. 10-23 O INSTALL INDOT "ONE WAY SIDEWALK CURB RAMP. SEE INDOT STD. DWG. DETAIL E-604-SWCR-06 ON SHEET C7.1 TOPOGRAPHIC & BOUNDARY NOTE ALL EXISTING HORIZONTAL AND VERTICAL INFORMATION HAS BEEN SHOWN PER A TOPOGRAPHIC SURVEY, DATED 7/22/15 (JOB #: B36081) PREPARED BY MILLER SURVEYING, INC. CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF ACTUAL HORIZONTAL AND VERTICAL DATA IS DIFFERENT FROM THAT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH CONSTRUCTION. mmmw ALL CONCRETE PIPE JOINTS SHALL BE CONTINUOUS O-RING RUBBER GASKET CONFORMING TO ASTM C 443 1801OF VERTICAL SEPARATION MUST BE MAINTAINED FOR ALL UTILITY CROSSINGS. UTILITY LOCATE NOTE INDIANA 811 FAILED TO LOCATE ALL EXISTING UTILITIES ON Al SURROUNDING THE SUBJECT SITE; THEREFORE, CONTRACTOR IS RESPONSIBLE TO LOCATE AND FIELD VERIFY ANY EXISTING UTILITIES BEFORE COMMENCING WITH CONSTRUCTION. CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF THE PROPOSED IMPROVEMENTS INTERFERE WITH ANY EXISTING UTILITY INFORMATION NOT SHOWN ON THESE PLANS. i`'I Ax I I 1 1 Subject to compliance with all regulations of State and I not Cni e City of Cai �((�� mGU Uaws�(wA1,L DATE: \ 06/17/19 STREET PLAN EQUALITY BLVD. PROFILE 810 810 805 805 800 800 I I 1 - 755 755 750 750 745 1 1745 740 1 1 11 00 to 00 740 HORS ' ' SCALE: VERT.: 1 =5 Existing Grade New Grade SIDEWALK NOTE ALL SIDEWALKS CONSTRUCTED WITHIN THE PUBLIC RIGHT-OF-WAY SHALL COMPLY WITH STANDARD CITY OF CARMEL DETAILS. INFRASTRUCTURE NOTE ALL INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL GOVERNING AUTHORITY'S CONSTRUCTION STANDARDS. I I I ITBM #5048 BRASS PLUG FD. ELEV.=754.86' I I I PROFILE SCALE CARMEL ENGINEERING DEPT. NOTE 1 "=50' ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE -CONSTRUCTION MEETING TO REVIEW THE DEPARTMENTS CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. RMT-01i W-5 LOCAL Sa9:ET 0 5' S 1' 14' * $ U' *$ Y 6 5 O F L F x Q n TYPICAL SEC77ON LOCAL STREET U F WSW U PAVING NOTE o 0 w ** MIENT 19-1e51AAE. HIM aIFALT. rwF V. 1.5 mm M ALL PAVING IS TO BE DONE r - 220//Aa. HMA IN1B AE W 1'. 19.0 mm M U r-JMeVa.HMA9A9EMEV.2A9mmw DURING ONE PAVING SEASON. r GaP Aa T R3 M m9r mneaux rRAM .r 18aiG p M UN - SEE 91010Ae MAW 10-12 Maas Q 5011 - SEE STAHowe MAW 10-$a p mxvETE ale Ao RITIEN - # # rn Yiral oNMN ARM M SK WAKUAa GNAWING 19-13 cAMa cm mlRmoar• Rx1(cn w) ® MNG o U z o�Cn �o NOTE DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL MODIFICATIONS AND/OR LIME STABILIZATION MAY BE REQUIRED. SEE SHEET C9.0 FOR SPECIFICATIONS. GENERAL NOTES 1. TEMPORARY TRAFHC CONTROL DURING CONSTRUCTION TO CONFORM TO APPUCABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACWTY ON THIS SITE TO BE PERFORMED IN COMPUANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL EXISTING ELEVATIONS BEFORE CONSTRUCTION BEGINS. REVISION RECORD IREVI DATE I DESCRIPTION DES BY APP BY 1 08/08/18 REV. PER INITIAL TAC REVIEW COMMENTS KPB BSC V U n Z El CD 0 CD �3; =� awz Cal o�z zON N n � v x �in U/�rn ON�0 U) Lin Ui i o '�t�w•o o n LO �J V—v WE= d a—O E� W CO) U Rojo o � F' V a Is N 00 ft �# Na PE10910647 •: LA .G :• STATE OF iP� •'•.;DIP;;:' �cK�� N ATE 06/22/2018 DWN BY: KPB CHKD.BY: BSC SCALE: 1° = 20• DATE, O6 22 18 i•L•I O U C) C i/) > O W UQ� w a wz� ce r d w Q Cd �L)w ao O�v W a ~ � /U��/� V / /// ��� (''�j `/ /`V/jt/� Ci F•�•I x PROJECTNUMBER TPS.007 DRAWING NUMBER SHEET MO 10 OF 16