HomeMy WebLinkAboutE6.1 - 190204C
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
DATE: 06/17/19
•-20AMP
1 Pole
rm■■rr
mr4■�mmlllllll■m_IIIIIII■IIIIIII■IIIIIII■
rr�l■
0
mlll�lll®III��_III�III�
�mlllllll■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■
a®S!_!III®III�III�III�III�
--
�IIIIIW19W01III1111010I�M;
.-
■■■■■■®rmLi■
mmmMMMMKim--•...
•...
.:
■■■■■■m
mmmm
fin
mmmm
mm
fin
IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■®Mr
Illl�llll�llll�llll�lll�llll�mr`ai■wm������
IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIIII■IIIIII■®�1■
mlllllll■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■
IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIIII■IIIIII■m�mlllllll■IIIIIII■�IIIIIII■IIIIIII■IIIIIII■
IIIIIII■IIIIIII■IIIIIII■_IIIIIII■IIIIIII■IIIIIII■_Imi
Imlllllll■III_IIIIIII■IIIIIII■II�_IIIIIII■
- - - - - - --Ilm;m•��®�tl�l��il�l�
Il�tll���ll�tlll����llllllll�m/allm;�a
�•_ ��
Calculated +
MWE
N.
=mlII
TOMll
ON
FedFrom
�
Total Demand
■■■MINK■
_U _U _U
Voltage: 12MOB Notes: Main: Main Lug Only
Amps: 225 =GFClcircuitbreaker Panel "P4" Bus: Capper
Phase: 3 = HACR circuit beaker Mounting: Surface
Wire: 4 Location: Utility 121
Remarks
<Loatl (KW)>
Cir.
No.
20AMP
1 Pole
U.O.N.
Cir.
No.
<Loatl (KW)>
Remarks
Light
Red.
Heat
A/C
Equip.
Other
Other
Equip.
A/C
Heat
Red.
Light
Side Lighting
.5
1
2
1.1
Gym Lighting
Exterior Building Lighting
.2
3
4
1.2
Gym Lighting
Scoreboard
1.8
5
6
1.2
Gym Lighting
A/V Cabinet
1.8
7
B
1.2
Gym Lighting
Receptacle
1D
9
10
1.2
Gym Lighting
Receptacle
1.0
11
12
1.0
FACP
Receptacle
1D
13
14
Spare
Receptacle
1.0
15
16
Spare
Spare
17
18
Spare
Spare
19
20
Spare
Spare
21
22
Spare
Spare
23
24
Spare
Spare
25
26
Spare
Spare
27
28
Spare
Spare
29
30
Spare
Space
31
32
Space
Space
33
34
Space
Space
35
36
Space
Space
37
38
Space
Space
39
40
Space
Space
41
42
1
1
1
1
1 Space
4.0
1
1
3.6
1 Connected load (KW)
.]
4.0
3.6
Demand load(KW)
1.0
5.9
Legend
Total Demand (KW)
Feeder
Calculated i
= 1 Pole
= 2 Pgle
= 3Pole
Light
Red.
Heat
I NC
Equip.
Other
I Total
Had From: -
-
yCo Conduit:
DokAIC:
kAIC: -
Total Demand Amps = 43±
6.6
4.0
4.6
1S2
srD
Existing
CT
Cabinet O
service
Utility Room -121
2 sets of
(4#350MCM,WC.)
(on root her one lighting)(PE) (PE)(on roof for erred or building lighting)
4#4/o,1#4,216'C,
TS
Panel'PF
TS Panel'P4'
Man
120/208V.,
120/208V.,
Distribution
30,4W.
30,4W.
Panel
'MDP2"
120/208V.,
30,4W.
225 Amp
225 Amp
M.L.O.
M.L.O.
600 Amp
M.C.B.
w/SPD
4#a0,14b4,2varo.
Grounding per
NEC, refer to
detail 1/E7.1
ELECTRICAL RISER DIAGRAM I
NO SCALE
CT
Cabinet
\: J
Main
Distribution Panel "MDP2"
120/208V.5 3 PI 4 W,
Mains: 600 Amp
Main Breaker:
600 Amp w/SPD
Branch Breaker
Load Sewed
Notes
Desig.
Poles
Size
MDP-1
3
225
Perri
MDP-2
3
90
DOAS-1
MDP-3
3
50
RTU-1
MDP-4
3
50
RTU-1
MDP-5
3
50
RTU-2
MDP-6
3
50
RTU-2
MDP-7
3
225
Panel'P5'
MDP-8
3
1
200
Space
Bus: Copper
2 sets of
Extedor r(4#350MCM,3"C.)
Note:
Coordinate electrical service with local utility company poor to bid.
Include all work in bid not perlormed by utility company.
Contact.
Clint Thompson
DUKE ph: 317.776.5348
ENERGY email.' �'.hoomson@duke-energy.wm
Pad Mounted
Transformer
Pon by EC per
Duke's
specifications
Grade
CURRAN
ARCHITECTURE
5719 LAWTON LOOP E. DR. #212
INDIANAPOLIS, IN 46216
O :: 317.288.0681
F :: 317. 288.0753
k
GGS,LARC
1.1
$G
p
F
ti
w
-
w
-
No.
10100E
STATE OF
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTMIECTIML PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN ARCHITECTURE.
® CWW 20MCJRPANARCMiERINf
PLAYSCHOOL
AT LEGACY
GYM ADDITION
14454 COMMUNITY DRIVE
CARMEL, INDIANA 46032
REVIEW SET 11.16.18
BID SET 11.26.18
PERMIT SET 02.04.19
1Q ADDENDUM 01 02.04.19
170299
ELECTRICAL RISER
DIAGRAM & SCHEDULES
He