Loading...
HomeMy WebLinkAboutE6.1 - 190204C RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 06/17/19 •-20AMP 1 Pole rm■■rr mr4■�mmlllllll■m_IIIIIII■IIIIIII■IIIIIII■ rr�l■ 0 mlll�lll®III��_III�III� �mlllllll■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■ a®S!_!III®III�III�III�III� -- �IIIIIW19W01III1111010I�M; .- ■■■■■■®rmLi■ mmmMMMMKim--•... •... .: ■■■■■■m mmmm fin mmmm mm fin IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■®Mr Illl�llll�llll�llll�lll�llll�mr`ai■wm������ IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIIII■IIIIII■®�1■ mlllllll■IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIII■ IIIIIII■IIIIIII■IIIIIII■IIIIIII■IIIIIIII■IIIIII■m�mlllllll■IIIIIII■�IIIIIII■IIIIIII■IIIIIII■ IIIIIII■IIIIIII■IIIIIII■_IIIIIII■IIIIIII■IIIIIII■_Imi Imlllllll■III_IIIIIII■IIIIIII■II�_IIIIIII■ - - - - - - --Ilm;m•��®�tl�l��il�l� Il�tll���ll�tlll����llllllll�m/allm;�a �•_ �� Calculated + MWE N. =mlII TOMll ON FedFrom � Total Demand ■■■MINK■ _U _U _U Voltage: 12MOB Notes: Main: Main Lug Only Amps: 225 =GFClcircuitbreaker Panel "P4" Bus: Capper Phase: 3 = HACR circuit beaker Mounting: Surface Wire: 4 Location: Utility 121 Remarks <Loatl (KW)> Cir. No. 20AMP 1 Pole U.O.N. Cir. No. <Loatl (KW)> Remarks Light Red. Heat A/C Equip. Other Other Equip. A/C Heat Red. Light Side Lighting .5 1 2 1.1 Gym Lighting Exterior Building Lighting .2 3 4 1.2 Gym Lighting Scoreboard 1.8 5 6 1.2 Gym Lighting A/V Cabinet 1.8 7 B 1.2 Gym Lighting Receptacle 1D 9 10 1.2 Gym Lighting Receptacle 1.0 11 12 1.0 FACP Receptacle 1D 13 14 Spare Receptacle 1.0 15 16 Spare Spare 17 18 Spare Spare 19 20 Spare Spare 21 22 Spare Spare 23 24 Spare Spare 25 26 Spare Spare 27 28 Spare Spare 29 30 Spare Space 31 32 Space Space 33 34 Space Space 35 36 Space Space 37 38 Space Space 39 40 Space Space 41 42 1 1 1 1 1 Space 4.0 1 1 3.6 1 Connected load (KW) .] 4.0 3.6 Demand load(KW) 1.0 5.9 Legend Total Demand (KW) Feeder Calculated i = 1 Pole = 2 Pgle = 3Pole Light Red. Heat I NC Equip. Other I Total Had From: - - yCo Conduit: DokAIC: kAIC: - Total Demand Amps = 43± 6.6 4.0 4.6 1S2 srD Existing CT Cabinet O service Utility Room -121 2 sets of (4#350MCM,WC.) (on root her one lighting)(PE) (PE)(on roof for erred or building lighting) 4#4/o,1#4,216'C, TS Panel'PF TS Panel'P4' Man 120/208V., 120/208V., Distribution 30,4W. 30,4W. Panel 'MDP2" 120/208V., 30,4W. 225 Amp 225 Amp M.L.O. M.L.O. 600 Amp M.C.B. w/SPD 4#a0,14b4,2varo. Grounding per NEC, refer to detail 1/E7.1 ELECTRICAL RISER DIAGRAM I NO SCALE CT Cabinet \: J Main Distribution Panel "MDP2" 120/208V.5 3 PI 4 W, Mains: 600 Amp Main Breaker: 600 Amp w/SPD Branch Breaker Load Sewed Notes Desig. Poles Size MDP-1 3 225 Perri MDP-2 3 90 DOAS-1 MDP-3 3 50 RTU-1 MDP-4 3 50 RTU-1 MDP-5 3 50 RTU-2 MDP-6 3 50 RTU-2 MDP-7 3 225 Panel'P5' MDP-8 3 1 200 Space Bus: Copper 2 sets of Extedor r(4#350MCM,3"C.) Note: Coordinate electrical service with local utility company poor to bid. Include all work in bid not perlormed by utility company. Contact. Clint Thompson DUKE ph: 317.776.5348 ENERGY email.' �'.hoomson@duke-energy.wm Pad Mounted Transformer Pon by EC per Duke's specifications Grade CURRAN ARCHITECTURE 5719 LAWTON LOOP E. DR. #212 INDIANAPOLIS, IN 46216 O :: 317.288.0681 F :: 317. 288.0753 k GGS,LARC 1.1 $G p F ti w - w - No. 10100E STATE OF THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTMIECTIML PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. ® CWW 20MCJRPANARCMiERINf PLAYSCHOOL AT LEGACY GYM ADDITION 14454 COMMUNITY DRIVE CARMEL, INDIANA 46032 REVIEW SET 11.16.18 BID SET 11.26.18 PERMIT SET 02.04.19 1Q ADDENDUM 01 02.04.19 170299 ELECTRICAL RISER DIAGRAM & SCHEDULES He