Loading...
HomeMy WebLinkAboutM6.1 - 190204RE Rooftop Unit Schedule External Cooling Performance Heating Electrical Connection Air Outside Performance Nominal Static Supply Duct Return Duct Weight Mark Space Bryant Model Volume Air Net Net Remarks Tons Pressure Connection Connection (Ibs) CFM (CFM) ( CFM) EDB EWB LWB sensible LDB (°F) Total EDB LDB Gas Input Voltage Phase stayer MCA MOCP Disconnect (w g) (°F) (°F) (°F) Cooling Cooling (°F) (°F) (MBH) (V) (0) By: By: (MBH) (MBH) RTU -1 118(Basketball Court) 581JP09M224 7.5 3000 900 0.6 Horizontal Vertical 817 687 58.4 57.9 73.34 104.83 48.1 106.6 224 208 3 46 50 MFR MFR 925 1,2,3,4,5,6,8 RTU -2 Various 581JP07J150 5 2000 450 0.6 Vertical Vertical 81.7 68.7 58.2 57.1 49.34 74.52 48.1 105.3 150 208 3 37 50 MFR MFR 765 1,2,3,4,5,67 Notes: 1. Gas pressure regulator suitable for site gas pressure. Acceptable Manufacturers: 2. Provide Stainless Steel Heat Exchangers. 1. Bryant 3. Provide hot gas reheat for dehumidification cycle, and appropriate controls. 2. Carrier 4. Provide Demand Control Ventilation. Provide 002 sensors in each space for DCV control. 3. Trans 5. Provide digital 7-Day programmable, Witt enabled T-state with occupied and unoccupied cycles and hurridistat like Honewell Vson Pro 6000. 4. Aeon 6. Provide 14' full parameter roof curb. 5. Johnson Controls 7. Vertical supply and return for unit. 6. catkin B. Horizontal supply and vertical return for unit. Notes: 1. DCV option included for code compliance. 2. Schedule describes only RTU types and not RTU count. Refer to plans for quantities and locations Dedicated Outdoor Air System ernal External DX Cooling Performance Heating Performance Hot Electrical Connection Outside Gas Reheat Coil Nominal Static Weight Net Net Mark Space AAON Model Air Remarks Tons Pressure Ibs (CFM) EWB OF) e EDB LDB Gas Voltage Phase Starter Disconnect (w g) fO� F) (° (F) Cooling Cooling 9 (°) (°) BHut ( ) (MBH) ( ) LDB (°F) O (0) MCA MOCP By: By: (MBH) (MBH) DOAS-1 All BIN - 015 - 8 - 0 - E A 0 15 2400 0.75 95 78 54.89 54.30 98.62 184.59 -3 87.3 292.5 41 70 208 3 74 90 MFR MFR 1884 See Notes 9-30B Notes: foam insulation. Acceptable Manufacturers: 1. R410A Refrigerant. 8. Stainless steel drain pan. 1. Aeon 2. Direct Drive fan with VFD. 9. Provide remote, wall mounted 2. Addison 3. Gas pressure regulator suitable for system manager. 3. Dailtin/McQuay site gas pressure. 10. O/A Temp reset. 4. Trans Horizon 4. 14- roof curb. 5. 10:1 Modulating, stainless steel, natural gas fired furnace. 6. 2' Pleated, MERV 7 filters. T Double wall construction with RI Ductless Split Air Conditioner Electrical Connection Mark Cooling Heating Indoor Outdoor Nominal Airflow Area Served Manufacturer Capacity Capacity MCA MocP Disconnect Remarks Model Model Tons (CFM) voyage (v) Phase (o) outdoor (BTU/hr) (BTU/hr) (Amps) (Amps) mdoorunh wh FCD-110 DSHP-110 Olfice(110) Bryant 40MBC009 38MAO 9000 10W0 3/4 320 20B 1 9 15 MFR 2,3,4,5 FCD-111 DSHP-111 fTStorage Bryant 619PE0018 38MAO 10000 17OW 1.5 600 20B 1 18 25 MFR See Notes Notes: Acceptable Manufacturers: 1. Provide integral drain pan mounted condensate pump. 1. Bryant 2. Provide flooded drain pan interlock. 2. Dal 3. Line voltage to outdoor unit. 3. Trans 4. Provide locking disconnect. 4. Johnson Controls 5. Follow manufacturers instructions on installation Terminal Outlets Mark Function Price Model Airflow Range (CFM) Face Size (in.) Neck Size (in.) Color Remarks PD-1 Plaque off user SPD 50-180 24x 24 so White 1,2,3 PD-2 Plaque Diffuser SPD 181300 24x 24 BO White 1,2,3 PD-3 Plaque Diffuser SPD 301450 24x 24 100 White 1,2,3 SR-1 Supply Register 520S 0-100 7a%x 73/ 6x6 White 1,2,3 ER-1 I Exhaust Register 1 530 1 0-100 1 7a%x73/ 6x6 I White 1,2,3 RG-1 Return Grille 535 15013500 39 Yi x 27 Yi 36x 24 White 1,2,3 RG-2 Return Grille 535 101-450 13%x 13J 12x 12 White 1,2,3 ECR-2 Eggcrate Return 80 1 1501 -2000 1 24 x 24 22 x 22 White 1,2,3 Notes: Acceptable Manufacturers: 1. Provide factory extended panel for any diffuser which is smaller than the grid in which his 1. Price installed. 2. Thus 2. Sound baffle by Sheet Metal Contractor. 3. Naicor 3. Provide plaster frame for riffusers, registers and grilles installed in gypsum board. 4. Metalaire Electric Wall LEASED Heater Schedule Electrical Connection Mark Area Type Disconnect Remarks SewedModel Power(Wa16) EWH-1 Vedas wal R0 Series 3 a Seri Wall Heater 1500 120 1 12.5 MFR 1,2 Acceptable Manufacturers: Notes: 1. Raywall FOR CONSTRUCTION 2. coa 3. Madcaell rbiectto compliance Whh all tabulations of State and Local Codes City of Carmel \\ ` mt,-blbi DATE: 06/17/19 Sequence of Operations DOAS-1 The DOAS shall run continuously when the building is occupied. Heating Mode: Stage 1: • Modulating Heat pump shall be enabled when O/A temperature is <60 F(adj) and >40 (adj). • Dischargw air temperature shall be adjustable between 55 F and 85 F. • Refer to Stage 2 for operation below 40 F O/A temperature. • Enable Stage 1 heat at 45 F when O/A temperature is increasing. Stage 2: • Shall be enabled when O/A temperature is below 40 F (adj). • Modulating natural gas furnace shall utilize full modulation to maintain desired discharge air temperature. • The discharge air temperature shall be adjustable from 55 F to 85 F. • Disable stage 2 heat at 45 F when O/A temperature is increasing Cooling mode: • Refrigerant compressors shall be enabled when O/A temperature is >63 F (adj). When coolly Is enabled the O/A should be cooled to 55 F utilizing a digital scroll compressor for load 9 9 9 P matching and shall supply it using the following supply air reset schedule. The unit shall use modulating hot as reheat to reheat supply air as needed. (Supply Air Reset curve shall initially be linear). 9 PP Y ( PP Y Y ) A. If CIA temperature is 63 F (adj), reheat supply to 70 F (adj). B. If CIA temperature is 90 F (adj), reheat supply to 55 F (adl Monitoring points The following monitoring points shall be visible from the DOAS-1 controller. • Supply Air Temperature (DB) • Outdoor Air Temperature(DB) • Outdoor Air Humidity (RH) DOAS shall have a remote mounted (coordinate mounting location with engineer prior to installation) equipment controller provided by the equipment manufacturer must be capable of meeting the sequence of Operations, with occupied/unoccupied cycles, and 7 day programmability. RTU-1, 2 RTUs shall operate when there is a call for heating or cooling from the thermostat. See plans for locations of thermostats _ . - - - - - - _ _ _ _ _ EF-1 The exhaust fan shall operate from timer and will run continuously when the building is occupied DSFCU-111 This unit will operate via wall mounted thermostat. See plans for location of thermostat. DSFCU-110 This unit will operate via wall mounted thermostat. See plans for location of thermostat. 120------r---T--�--- L--J--J---IL 100 -(b b ag--- ---I--T--T---T--T 60_-------+--�--- w a `m E 9_J---L_-J < 40 20 r -20 0 20 40 60 w 1( Outdoor Air Temperature (°F) D A DOAS S/A Reset Temperature Graph M 6.1 Scale: None CURRAN ARCHITECTURE 5719 LAWTON LOOP E. DR. #212 INDIANAPOLIS, IN 46216 O :: 317. 288. 0681 F :: 317. 288.0753 G01,LABOROff 1.1 �G p F C w - w - 11561 STATE OF THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCWSIVE INTELLECTUAL PROPERTY OF CURRAN AACHITEC E, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. o C0fWJCM301ACAeANARCMTERINE PLAYSCHOOL AT LEGACY GYM ADDITION 14454 COMMUNITY DRIVE CARMEL, INDIANA 46032 REVIEW SET 11.16.18 BID SET 11.26.18 PERMIT SET 02.04.19 1Q ADDENDUM 01 02.04.19 170299 M691