Loading...
HomeMy WebLinkAboutCivil Plans 4.8.19 410 1 9 7 6 4 2 SWPPP FOR CONSTRUCTION SITES: 1. 14 DIGIT WATERSHED HYDROLOGIC UNIT CODE: 05120201090030 2. NAME OF ALL RECEIVING WATERS IF THE DISCHARGE IS TO A MUNICIPAL SEPARATE STORM SEWER. IDENTIFY THE ULTIMATE RECEIVINGWATER: COOL CREEK -GRASSY BRANCH/LITTLE COOL CREEK 3. ESTIMATE OF PEAK DISCHARGE FOR POST CONSTRUCTION CONDITONS(10-YEAR): S70cls 4. LOCATIONS OF SPECIFIC POINTS WHERE STORMWATER DISCHARGE WILL LEAVE THE SITE: BE CORNEROF THE SITE INTO CITY STORM SEWER. 5. LOCATIONS WHERE STORMWAMR MAY BE DIRECTLY DISCHARGED INTO GROUNDWATER, SUCH AS ABANDONED WELLS OR SINKHOLES: N/A 6. SOILS MAP OF THE PREDOMINANT SOIL TYPES INCLUDING: 8. SOIL LEGEND WITH DESCRIPTIONS OF EACH SOIL TYPE: THIS SHEET U. BRIEF DESCRIPTION OF HOW THE SITE HAS ACCOMMODATED THE EXISTING SOIL LIMITATIONS Z DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THE CONSTRUCTION ACTIVITIES: POTENTIAL POLLUTANTS FROM CONSTRUCTION ACTIVITY SUCH AS ASPHALT FROM PAVING; CONCRETE FROM CURBING, SIDEWALKS. OIL, GREASE, ANTIFREEZE, GASOLINE AND DIESEL FUEL FROM CONSTRUCTION EQUIPMENT: SOIL EROSION: FERTILIZER AND PESTICIDES FROM LANDSCAPING AND TRASH SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND/OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM. 8. TEMPORARY AND PERMANENT STORMWATER QUALITY MEASURES: ONLY TEMPORARY SWPPP MEASURES PROVIDED FOR THS PROJECT. THIS INCLUDES SILT FENCE, INLET PROTECTION, ROCK CHECK DAMS, TEMP AND PERMANENT SEEDING. REFER TO SHEETS C100, C101, ANO CUM FOR ALL DETAILS. 9. GENERAL CONSTRUCTION SEQUENCE. a. A PRECONSTRJCTION MEETING WITH THE CITY OF CARMEL IS REQUIRED PRIOR TO THE COMMENCEMENT OF ANY EARTH WORK. ADDITIONALLY. IDEM IS REQUIRED TO BE CONTACTED AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. A . CONSTRUCTION ENTRANCEREMOVEEXISTING ASPHALT AND STRIP TOPSOIL AND PLACE STONE AT ACCESS POINT ALONG GRAND BOULEVARD. INSTALL SILT FENCING AND ALL OTHER EROSION CONTROL MEASURES DESCRIED MY EARTH MOVING. d EARTHWORK - STRIP TOPSOIL, BEGIN ROUGH GRADING AND PREPARE BUILDING PAD AND ROUGH GRADE. e. SANITARVSEWER- INSTALL SANITARY SEWER SYSTEM I. STORMSEWER- INSTALL STORM SEWER SYSTEM AND CORRESPONDING INLET PROTECTION 9, UTILITIES - COORDINATE INSTALLATION OF ALL UTILITIES. N FINISH GRADING AND PERMANENT EROSION CONTROL -FINISH GRADE AND PERMANENTLY SEED ALL PROPERTY PERIMETER AREAS. 1. PAVEMENT - INSTALL STONE, BASE COURSES AND FINISHED GRADES FOR ENTRY DRIVE. 1. CLEANUP - CONTRACTOR SHALL SPOIL ALL EXCESS MATEFi REGRADE AND STABILIZE ALL AREAS DISTURBED BY UTILITY INSTALLATIONS AND RESEED. k. FINAL LANDSCAPING -INSTALL FINAL LANDSCAPING. 10. LOCATION OF PROPOSED SOIL STOCKPILES BORROW ANDIORDISPOSALAREAS: STOCKPILES WILL BEGENERALLY ON THE SOUTH PORTION OF T HE SITE SINCE MOST OF THE SITE WILLBE IN CUT. 11. TEMPORARYAND PERMANENT SURFACE STABILIZATION METHODS APPROPRIATE FOR EACH SEASON. PROVIDE APPLICATION RATES FOR SOIL AMENDMENTS AND SEED MIXTURES, AS WELL AS, THE TYPE AND APPLICATION RATE FORMULCH: SEEDING CHART SHOWN ON THIS SHEET. SEEDING DETAILS SHOWN ONC103. 12. EROSION AND SEDIMENT CONTROL SPECIFICATIONS FOR INDIVIDUAL BUILDING LOTS: EROSION CONTROL SPECS ARE ON SHEET C100, C101, C102, AND CORN. 13. MATERIAL HANDLING, STORAGE, AND SPILL PREVENTION PLAN: a. LIST OF EXPECTED MATERIALS THAT MAYBE PRESENTON THE SITE DURING CONSTRUCTION OPERATIONS ASPHALT CONCRETE, OIL, GREASE, ANTIFREEZE. GASOLINE AND DIESEL FUEL, SOIL. FERTILIZER, PESTICIDES, STEEL. WOOD. A . WRITTEN DESCRIPTION OF HOW THESE MATERIALS WILL BE HANDLED TO MINIMIZE THE POTENTIAL OF ENTERING THE STORM SEWER SYSTEM: ALLMATERIALS WILL BE HANDLED -O MINIMIZE RISK OF SPILLS AND POLLUTION. C. PROCEDURES FOR THE CONTRACTOR TO TAKE IF ANY SPILLS OCCUR DURING CONSTRUCTION: IF THERE IS ASPILL FROM ONE OF THESE, IMMEDIATE CLEANUP SHOULD OCCJR, SOIL EROSION: FERTILIZER AND PESTICIDES FROM LANDSCAPING AND TRASH SHOULD BE PROPERLY ATTENDED TO TO REDUCE THE CONTAMINANTS FROM ENTERING THE STORM SYSTEM. TRASH SHOULD BE CLEANED UP TO REDUCE CLOGGING OF STORM SYSTEMS AND REDUCE POTENTIAL BACTERIA AND/OR OTHER BIOLOGICAL AGENTS FROM ENTERING IN THE STORM SYSTEM, AND SHALL MEET THE REQUIREMENTS OF IAC 2-8.1. FOLLOW MATERIAL SAFETY DATA SHEET (MSDS) GUIDELINES FOR CONTAMINANTS PRESENT ON SITE. 14. CONTACT INFORMATION FOR THE TRAINED INDIVIDUAL RESPONSIBLE FOR STORMWATER POLLUTION PREVENTION FOR THE PROJECT SITE NAME: FRED PARKER, CPESC b. ADDRESS: 10505 N. COLLEGE AVE., INDIANAPOLIS, IN 46280 TELEPHONE NUMBER: (317) 81 d E-MAILADDRESS PARKERFQWEIHENET e. LIST OF QUALIFICATIONS: CPESC 15. CURRENT REVISION DAMON ALL SHEETS: REFER TO TITLE BLOCK ON EACH SHEET SWPPP FOR POST -CONSTRUCTION: 1. DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THE PROPOSED LAND USE: OIL, GREASE, ANTIFREEZE, GASOLINE AND DIESEL FUEL, SOIL, FERTILIZER, PESTICIDES. 2. POST CONSTRUCTION STORMWATERGUALLY MEASURES: THIS SITE HAS BEEN INCLUDED ASA PART OF THE EXISTING DISTRICT FOR AND IS SERVED BY THE ALEXANORIA POND. EXISTING SOILS INCLUDE 2 DOWNSTREAM DEFENDERS AND AN EXTENDED WET DETENTION BASIN. 3. SEQUENCE DESCRIBING STORMWATER QUALITY MEASURE IMPLEIOENTA71ON DESCRIPTION OF WHEN THE PROPOSED POST CONSTRUCTION STOR ANATER QUALITY MEASURES WILL BE INSTALLED IN RELATION TO THE GENERAL CONSTRUCTION SEQUENCE: THIS SITE HAS BEEN INCLUDED ASA PART OF THE EXISTING DISTRICT PUD AND IS SERVED BY THE ALEXANDRIA POND. 4. STORMWATER QUALITY MEASURESTO BE IMPLEMENTED TO PREVENT OR MINIMIZE ADVERSE IMPACTS TO STREAM AND RIPARIAN HABITATS: THIS SITE HAS BEEN INCLUDED AS A PART OF THE EXISTING DISTRICT RED AND IS SERVED BY THE ALEXANDRIA POND. 5. AN OPERATION AND MAINTENANCE MANUAL FOR ALL POST- CONSTRUCTION STORMWATER QUALITY MEASURES: THISSITEHAS BEEN INCLUDED ASA PART OF THE EXISTING DISTRICT POD AND IS SERVED BY THE ALEXANDRIA POND. RELEASED FOR CONSTRUCTION Subject to compliance with all regulalions of State and meal Codes CiityUG�F Centel �VT�V1�0*tiYWM<_ DATE: \\ 06/17/19 9 NINA IIslas 1:11LIgo ;7:H91214va MIS KIM1:3somW CARMEL FIRE DEPARTMENT 317 571-2600 CARMEL POLICE DEPARTMENT 317 571-2500 INDIANA DEPT. OF NATURAL RESOURCES 612477-6773 INDIANA DEPT. OF ENVIRONMENTAL MANAGEMENT 317-233-7745 HAMILTON COUNTY COUNTY SOIL AND WATER 317 773-1406 CITY OF CARMEL ENGINEERING 317­571-2441 SECTION 2 MATERIAL HANDLING AND SPILL PREVENTION PLAN IN ORDER TO MINIMIZE THE RELEASE OF POTENTIAL POLLUTANTS DURING CONSTRUCTION THE CONTRACTORS SHALL IMPLEMENT THIS MATERIAL HANDLING AND SPILL PREVENTION PLAN. THE CONTRACTOR SHALL REVIEW THIS PLAN WITH ALL SUBCONTRACTORS AND REQUIRE THAT THEY IMPLEMENT THE PLAN AS WELL. L CONSTRUCTION EQUIPMENT A. FUELING, LUBRICATION AND FLUIDS: ALL OPERATIONS INVOLVING THE ADDITION OF FLUIDS TO EQUIPMENT SHOULD BE DONE IN ONE LOCATION, AS DESIGNATED BY THE CONSTRUCTION MANAGER. SO THAT SPILLS ARE LIMITED TO ONE LOCATION ON THE SITE WHICH WILL FACILITATE THE CLEANUP OF SPILLS. IF AN ONSITE-FUELING TANK IS PLANNED TO BE ON SITE, IT SHALL BE DOUBLE WALLED AND STORED IN THIS DESIGNED AREA. THIS LOCATION IS AN AREA -HAT W IL_ NOT ALLOW SPILLED FLUIDS TO MIGRATE INTO SUBSURFACE SOILS. IN THE EVENT OF A SPILL THE FLUID SHALL IMMEDIATELY BE CLEANED UP BY REMOVING THE CONTAMINATED SOIL OR STONE, WHICH SHALL BE DISPOSED OF IN AN ACCEPTABLE MANNER. SPILLS ON HARD SURFACES SHALL BE SOWED UP BYAN ACCEPTABLE MATERIAL SUCH AS OIL DRY AND THE ABSORBENT MATERIAL DISPOSED OF INA PROPER MANNER. THESPILL SHALL ALSO BE REPORTED IMMEDIATELY TO THE CONSTRUCTION MANAGER'S SUPERINTENDENT. B. EQUIPMENT REPAIR. ESPECIALLY WHEN FLUIDS MUST BE REMOVED FROM THE EQUIPMENT OR THE POSSIBILITY OF FLUID SPILLS IS HIGH, SHOULD ALWAYS BE DONE OFFSITE AT A FACILITY THAT IS MORE SUITABLE THAN A CONSTRUCTION SITE TO HANDLESPILLS. WHEN EQUIPMENT MUST BE REPAIRED DEGREE IT SHOULD BE MOVED TO THE MAINTENANCE AND FUELING AREA IF POSSIBLE. OTHERWISE, SUITABLE ON SITE CONTAINERS SHOULD BE PLACED UNDER THE EQUIPMENT DURING REPAIR TO CATCH ANY SPILLED FLUIDS AND THESE FLUIDS SHOULD BE DISPOSED OF IN A PROPER MANNER. C. ALL REUSABLE FLUID CONTAINERS, SUCH AS GASOLINE CANS, SHALL BE INSPECTED FOR LEAKS EACH TIME THEY ARE USED. IF LEAKS ARE FOUND THE FLUID SHALL BE REMOVED FROM THE CONTAINER IN A PROPER MANNER AND THE CONTAINER DISPOSED OF IN AN ACCEPTABLE MANNER. EMPTY DISPOSABLE CONTAINER. SUCH AS GREASE TUBES AND LUBRICATING OIL AND SHAKE FLUID CONTAINERS, AND THEIR PACKAGING, SHALL BE DISPOSED OF INA PROPER MANNER AND SHALL NOT BE LEFT ON THE GROUND OR IN THE OPEN ON THE CONSTRUCTION SITE. 2. CONSTRUCTION MATERIALS AND THEIR PACKAGING A. EROSION CONTROL MEASURE SHOWN ON THE SUBJECT PROJECT SHALL BE IMPLEMENTED PRIOR TO AND DURING CONSTRUCTION N THE PROPER SEQUENCING TO MINIMIZE SOIL EROSION. EROSION CONTROLS SHALL BE INSPECTED AND MAINTAINED AS DESCRIBED ELSEWHERE ON THE PLANS. EXCESSIVE OUSTING OF SOIL CN THE SITE SHALL BE MINIMIZED BY REDUCING CONSTRUCTION TRAFFIC ACROSS BARE SOIL DURING DRY AND/OR WINDY WEATHER, AND BY APPLYING WATER OR OTHER ACCEPTABLE DUST CONTROL MEASURES TO THE SOIL. UPON COMPLETION OF CONSTRUCTION AND SUITABLE ESTABLISHMENT OF PERMANENT VEGETATION, TEMPORARY EROSION CONTROL MEASURES SUCH AS SILT FENCE, CHECK DAUB AND INLET PROTECTION DEVICES SHALL BE REMOVED INA MANNER TO MINIMIZE ADDITIONAL LAND DISTURBANCE. ANV AREAS DISTURBED BY THESE OPERATIONS SHALL BE PROPERLY REVEGATATED. G LARGE WASTE MATERIALS CREATED BY CUTTING, SAWING, DRILLING. OR OTHER OPERATIONS SHALL BE PROPERLY DISPOSED OF IN SUITABLE WASTE CONTAINERS. THE SITE SHALL BE CHECKED AT THE END OF THE DAY, ASA MINIMUM, AND ALL WASTE MATERIALS, INCLUDING THOSE BLOWN ACROSS OR OFF THE SITE BY WIND SHALL BE PICKED UP AND DISPOSED OF IN SUITABLE CONTAINERS. WHERE POSSIBLE, OPERATIONS SUCH AS SAWING THAT CREATE SMALL PARTICLES SHOULD BE PERFORMED IN ONE SPOT IN AN AREA PROTECTED FROM WIND. AND WASTE PARTICLES COLLECTED AND DISPOSED OF FREQUENTLY TO MINIMIZE WIND DISPERSAL. PACKAGING USED TOTRANSPORT MA-ERIALS TO THE SITE FOR CONSTRUCTION OF THE FACILITY SHALL BE DISPOSED OF PROPERLY, WHETHER THE MATERIAL IS TAKEN OUT OF ITS PACKAGE AND INCORPORATED INTO THE PROJECT IMMEDIATELY OR STORED ONSITE FOR FUTURE USE. PACKAGED MATERIALS STORED ONSITE SHALL BE INSPECTED REGULARLY AND ANY LOOSE PACKAGING SHALL BE REPAIRED OR DISPOSED OF PROPERLY. C. ALL DEWATERING OF ACTIVITIES SHALL BE DONE IN ACCORDANCE TO GOOD EROSION CONTROL PRACTICES. THESE PRACTICES SHOULD INCLUDE THE USE OF DIRT BAGS SUCH AS SILT FENCE INLET PROTECTION. THE USE OF THESE TYPES OF DEBATE RING DEVICES WILL REMOVE LARGE QUANTITIES OF SILT, SEDIMENT, AND DIRT AND PREVENT THESE MATERIALS TO ENTER THE STORM SEWER SYSTEM. D. IF THE USE OF LIME IS USED TO STABILIZE THE SOIL OF THE SITE THEN ALL CONSTRUCTION EQUIPMENT USED SHALL BE CLEANED OF ALL EXCESS MATERIAL WITH WATER IN THE MAINTENANCE AND REFUELING AREA AS SHOWN WITHIN THESE PLANS. E. NUTRIENTS AND FERTILIZERS SHALL ONLY BE USED TO ESTABLISH RAPID VEGETATION. WHEN THESE PRODUCTS ARE UTILIZED, THE USER SHOULD PAY STRICT ATTENTION TO THE PRODUCTS RECOMMENDED USAGE. 3. CONCRETE WASTE WATER A. ALL CCNCRETE WASTENAILER SHALL BE DISPOSED OF IN THE DESIGNED AREA AS DI RECTED BY TA E CONSTRUCTION MANAG ER. THIS AREA IS TO BE A 3DEEP. 10 SQUARE PIT AS DETAILED ON THE EROSION CONTROL PLAN. THISAREASHALL BE INSPECTED ON A DAILY BASIS AT A MINIMUM. WHEN THIS AREA BECOMES FULL, THE POLLUTANTS SHALL BE EXCAVATED, PLACED IN AN ACCEPTABLE CONTAINER AND DISPOSED OF IN PROPER MANNER., BY THE EXCAVATIONCONTRACTOR. 4. PAINT PRODUCTS A. ALL EXCESS PAINT AND THEIR RELATED PRODUCTS SHALL BE DISPOSED OF IN THE MANNER AT WHICH THE MANUFACTURERSUGGESTS. UNDERBID CIRCUMSTANCES \VILL PAINT OR THEIR RELATED PRODUCTS BE CLEANED OR DISPOSED OF IN SOIL, SANITARY SEWERS, STORM SEWERS OR DETENTION BASINS. ANV VIOLATION OF THIS SHALL BE REPORTED TO THE JOB SUPERINTENDENT. IN THE EVENT OF ACCIDENTALLY CONTAMINATION ALL EFFORTS SHOULD BE MADE TO REMOVE CONTAMINANTS IN AN APPROPRIATE MANNER. THE CARMEL FIRE DEPARTMENT SHOULD BE CONTACTED IMMEDIATELY TO DETERMINE IF FURTHER MEASURES ARE NEEDED. 7 6 ;i11�x�y�I �If.Y�3I[UI�II�ZI>IY:I�1;7 OBJECTIONABLE SUBSTANCES; REPORTING, CONTAINMENT AND CLEANUP (REPEALED BY WATER POLLUTION CONTROL BOARD; FILED FEB 25, 1997, 1:00 PM.: 20 IS 1734) 327LAC 2-6.1-1 APPLICABILITY AUTHORITY: IC 13-148-7 AFFECTED: IC 1311-2: IC 13-1&1: IC 1318 3; IC 13-16-8: IC 1318-17 SEC. 1, THIS RULE APPLIES TO THE REPORTING AND CONTAINMENT OF. AND THE RESPONSE TO THOSE SPILLS OF HAZARDOUS SUBSTANCES, EXTREMELY HAZARDOUS SUBSTANCES, PETROLEUM, AND OBJECTIONABLE SUBSTANCES THAT ARE OF A QUANTITY. TYPE, DURATION AND IN A LOCATION AS TO DAMAGE THE WATERS OF THE STATE. NOTHING IN THIS RULE IS INTENDED TO AFFECT REPORTING OR CLEAN-UP REQUIREMENTS SET FORTH BY OTHER FEDERAL, STATE. OR LOCAL LAWS. (WATER POLLUTION CONTROL BOARD: 327 LAC 28.1-1, FILED FEB 25, 1997, 1,00 P.M., 20 IS 1731, READOPTED FILED JAN 10. 2001. 3:23 P. M.: 24 IR 1518, READOPTED FILED NOV 21. 2007.1:16 P.M.: 20071219-I F327070553 BFA) 327 LAC 2-6.1=2 SPECIAL AREAS AUTHORITY: IC 13-14-6-7 AFFECTED 1111-21C 1 -18-t 1118- - ICI -1M,1 13-18-17 S C 3 C 9. 3 C SEC. 2. CERTAIN AREAS OF THE STATE ARE RECOGNIZED AS HAVING UNIQUE A GEOLOGY. A LARGE SECTION OF THEM UKHAR HERS PART OF THE STATE IB A KARST REGION. PORTIONS OF SAINT JOSEP HQUIFERA REFERENCED AND LAGRANGE COUNTIES CONTAIN A SOLE SOURCE AQUIFER AS REFERENCED D M U.S.C. FROM SPILL THE WATERS OF THE STATE ARE PARTICULARLY VULNERABLE TO DAMAGE FROM SPILLS IN THESE AREAS, AND CARE SHOULD BE EXERCISED WHENEVALUATING YCDAMAGEFROMSPILLS. INFORMATION ABOUTTHESE AREAS CAN T, OBTAINED BVCALLINGTHE DEPARTMENTOFENVIRONMENTAL MANAGEMENT OFFICE OF LAND QUALITY. EMERGENCY RESPONSE SECTION: AREA OUT- FSTATE CALL FORINSTATE CALLS (TOLL FREE).A D: 37AC FOR OUT -OF PAIM:2 I(WATER731EADOPT( D FILED JAN BOARD; 3P IA24-Y. FILED FEB 251997EDP.M.: 20V21,2READOPTED FILED JAN 2001, P.M..MERRIR AT1516' READOPTED FILED NOV 21200] R-32780,119]1219-IR-32TB]0553BFA'ERRATA FILES MAV 2i, 2009, 206 P M.: 2I1060625-IR-32]08041 BACA) 327IAC 2-6.1-3 EXCLUSIONS AUTHORITY: IC 134467 AFFECTED: 1013-11-2: IC 13-18-1: 1013H83; IC 13168: IC 1318 17 SEC. 3. NOTWITHSTANDING ANY OTHER SECTION OF THIS RULE. THE REPORTING REQUIREMENT OF THIS RULE DOES NOT APPLY TO THE FOLLOWING OCCURRENCES: (1) DISCHARGES OR EXCEEDANCES THAT ARE UNDER THE JURISDICTION OF AN APPLICABLE PERMIT WHEN THE SUBSTANCE IN QUESTION IS COVERED BY THE PERMIT AND DEATH OR ACUTE INJURY OR ILLNESS TO ANIMALS OR HUMANS DOES NOT OCCUR. (2) LANFUL APPLICATION OF MATERIALS, INCLUDING, BUT NOT LIMITED TO'. (A) COMMERCIAL OR NATURAL FERTILIZERS AND PESTICIDES ON OR TO LAND OR WATER; 3R AF OUST SUPPRESSION MATERIALS. (3) THE APPLICATION OF PETROLEUM NECESSARY FOR CONSTRUCTION THAT DOES NOT DAMAGE WATERS OF THE STATE. (4) SPILLS OF LESS THAN ONE (1) POUND OR ONE (1) PINT. (5) SPILLS OF INTEGRAL OPERATING FLUIDS, IN THE USE OF MOTOR VEHICLES OR OTHER EQUIPMENT, THE TOTAL VOLUME OF WHICH IS LESS THAN OR EQUAL TO FIFTY.FIVE (55) GALLONS AND WHICH DO NOT DAMAGE WATERS OF THE STATE. (6) OIL SHEENS PRODUCED AS A RESULT OF THE NORMAL OPERATION OF PROPERLY FUNCTIONING WATERCRAFT. (7) A RELEASE OF A SUBSTANCE INTEGRAL TO A SPILL RESPONSE ACTIVITY THAT HAS BEEN APPROVED AND AUTHORIZED BY A STATE OR FEDERAL ONSCENE COORDINATOR (WATER POLLUTION CONTROL BOARD, 327 LAC 2-6 1-3, FILED FEB 25, 1991: 20 IS 1731, ERRATA FILED MAR 7.1997, 2 25 PM 201R 173B, READOPFEO FILED JAN 1Q 2001, 3 23 P M: 241R 1518, READOPTED FILED NOV 21.2007,1:16 P.M:20071219-IR-327070553BFA) 327 LAC 2-6.14 DEFINITIONS AUTHORITY: IC 13-14-8-7 AFFECTED: IC 13-11-2; IC 131 IC 1118-3; IC 13-18-B; IC 13,18-17: IC 14-8-2-7; IC 14-25-7-13. IC 1425-7-15 SEC. 4, IN ADDITION TO THE DEFINITIONS CONTAINED IN IC 13-11-2-17(D), IG 13-11-2-35(A), IC 13-11-251. IC 1311-2-158(A), IC 13-11-2-160, IC 13-11-2-260, IC 13-11-2-265, AND IN 327 PRO 1, THE FOLLOWING DEFINITIONS APPLY THROUGHOUT THIS RULE: (1) "ANIMAL' MEANS ALL MAMMALS, BIROS, REPTILES, AMPHIBIANS. FISH, CRUSTACEANS, AND MOLLUSKS. (2)'AQUATIC LIFE" MEANS THOSE PLANTS AND MACROINVERTEBRATES THAT ARE DEPENDENT UPON AN AQUATIC ENVIRONMENT. (3)'CONTAIN' MEANS TO TAKE SUCH IMMEDIATE ACTION AS NECESSARY TO DAM, BLOCK, RESTRAIN, OR OTHERWISE ACT TO MOST EFFECTIVELY PREVENT A SPILL FROM ENTERING WATERS OF THE STATE OR MINIMIZE DAMAGE TO THE WATERS OF THE STATE FROM A SPILL. (4) OWNING E" MEANS THE ACTUAL OR IMMINENT ALTERATION OF THE WATERS OF THE STATE SO AS TO RENDER THE WATERS HARMFUL, DETRIMENTAL, OR INJURIOUS TO (A) PUBLIC HEALTH. SAFETY, OR WELFARE: (B) DOMESTIC. COMMERCIAL, INDUSTRIAL.. AGRICULTURAL, OR RECREATIONAL USES: OR (C) ANIMALS OR AQUATIC LIFE. (5)'DOWNSTREAM WATER USER' MEANS: (A) A COMMUNITY PUBLIC WATER SUPPLY, AS IDENTIFIED BY THE DEPARTMENT OF NATURAL RESOURCES UNDER IC 14 25 713WS SD A SIGNIFICANT WATER WITHDRAWAL FACILITY AS REGISTERED WITH THE DEPARTMENT OF NATURAL RESOURCES UNDER IC I4-257-15. (C) USERS OF RECREATIONAL WATERS: OR (D) ANY OTHER USER MADE KNOWN TO THE PERSON WHO HAS A SPILL. (6)'EXTREMELY HAZARDOUS SUBSTANCE" MEANS A SUBSTANCE IDENTIFIED PURSUANT TO 42 U.S.G 1 W ES AND 11004. (40 CFR 555 APPENDIX A) (])'FACILITY' MEANS ALL LAND, BUILDINGS, EQUIPMENT, STRUCTURES, AND OTHER STATIONARY ITEMS THAT ARE LOCATED ON A SINGLE SITE OR ON CONTIGUOUS SITES AND THAT ARE OWNED OR OPERATED BY THE SAME PERSON OR BY ARE PERSON WHO CONTROLS, IS CONTROLLED BY, OR IS UNDER COMMON CONTROL WITH, SUCH PERSON. (8)'FACILITY BOUNDARY" MEANS THE BOUNDARY OF A FACILITY OR AN EASEMENT OR RIGHT-OF-WAY. (9)'HAZARDOUS SUBSTANCE' HAS THE MEANING SET FORTH IN 42 U.S.C. 9601(14). (10) "MODE OF TRANSPORTATION' INCLUDES. BUT IS NOT LIMITED TO, CARRIAGE BV. (A) RAIL AND MOTOR VEHICLES; (8) AIRCRAFT, (C)WATERCRAFT: (D) PIPELINES: OR C) OTHER MEANS OF TRANSPORTATION: AREA MAP IN COMMERCE. THIS DEFINITION EXCLUDES CARRIAGE WITHIN A FACILITY BY TRANSPORTATION EQUIPMENT OWNED, OPERATED, OR CONTROLLED BY THAT FACILITY N 1) "OBJECTIONABLE SUBSTANCES' MEANS SUBSTANCES THAT ARE: (A) OF A QUANTITY AND A TYPE; AND (6) PRESENT FOR A DURATION AND IN A LOCATION; SEAS TO DAMAGE WATERS OF THE STATE. THIS OE FIN IT ION EXCLUDES HAZARDOUS SUBSTANCES EXTREMELYRNOWDOUS SUBSTANCES, PETROLEUM, AND MIXTURES THEREOF. (12) ON SCENE COOKIE NATOR" MEANS A STATE OR FEDERAL OFFICIAL DESIGNATED BY THE DEPARTMENT, THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, OR THE UNITED STATES COAST GUARD TO DIRECT AND COORDINATE SPECIAL SPILL RESPONSE ACTIVITIES. (13) "RECREATIONAL WATERS" MEANS ANY WATER LSE. FOR'. (A)BOATING, SWIMMING, FISHING, HUNTING, TRAPPING, OR WILDLIFE VIEWING; OR (B) PUBLIC ACCESS AREAS THAT ARE OWNED BY THE DEPARTMENT OF NATURAL RESOURCES OR THE FEDERAL GOVERNMENT; AS LISTED BY THE DEPARTMENT. (14) "REPORTABLE QUANTITY' MEANS THE AMOUNT OF A HAZARDOUS SUBSTANCE OR EXTREMELY HAZARDOUS SUBSTANCE THAT IS REQUIRED TO BE REPORTED UNDER FEDERAL CAN UNDER 42 U.S C. 9602(A) AND UD AND 42 U S C. 9603(A) (40 CFR 3024 OR 40 CFR 355 APPENDIX A) (15) "SPILL" MEANS ANY UNEXPECTED,UNINTENDED,ABNORMAL, OR UNAPPROVED DUMPING. LEAKAGE, DRAINAGE, SEEPAGE. DISCHARGE OR OTHER LOSS OF PETROLEUM, HAZARDOUS SUBSTANCES. EXTREMELY HAZARDOUS SUBSTANCES, OR OBJECTIONABLE SUBSTANCES. THE TERM DOES NOT INCLUDE RELEASES TO IMPERMEABLE SURFACES WHEN THE SUBSTANCE DOES NOT MIGRATE OFF THE SURFACE OR PENETRATE THE SURFACE AND ENTER THE SOIL. 16 "SPILLRESPONSE" FOR PURPOSES OF THIS RULE MEANS THE FOLLOWING: A THE SPILL IS CONTAINED AND (1 (B) FREE MATERIAL IS REMOVE. OR NEUTRALIZED. "SPILL REPORT' MEANS AN ORAL REPORT THAT INCLUDES THE FOLLOWING INFORMATION ABOUT A SPILL, TO THE EXTENT THAT THE INFORMATION IS KNOWN AT THE TI ME OF THE REPORT D: (A)THE NAME, ORESS, AND TELEPHONE NUMBER OF THE PERSON MAKING THE SPILL REPEPORT. (B)THE GAME, AORAND TELEPHONE NUMBER OF ACONTACT PERSONDIFFERENT FROM OMCLAUSE AO. C THE HE LOCATION THE SPILL. (D) THE TIME OF THE SPILL. III THE IDENTIFICATION OF THE SUBSTANCE SPILLED. (F) THE APPROXIMATE QUANTITY OF THE SUBSTANCE THAT HAS BEEN OR MAY FURTHER BE SPILLED. (G) THE DURATION OF THE SPILL. ( THE SOURCE THE SPILL (I)1) NAME AND LOCATION OF THE WATERS DAMAGED. AS THE IDENTITY OF ANV RESPONSE ORGANIZATION RESPONDING TO THE SPILL. (K) WHAT MEASURES HAVE BEEN OR WILL BE UNDERTAKEN TO PERFORM A SPILL RESPONSE. (L) ANY OTHER INFORMATION THAT MAY BE SIGNIFICANT TO THE RESPONSE ACTION. WA "WATERS', AS DEFINED IN G 13 UND,, 265, NATURAL THE ACCUMULATIONS AN WATER, SURFACE AND UNDERGROUND. NATURAL AND ARTIFICIAL. PUBLIC AND PRIVATE, OR PARTS THEREOF THAT ARE WHOLLY OR PARTIALLY WITHIN, FLOW THROUGH, OR NDBORDER ANY UPON THIS STATE. THE TERM DOES NOT INCLUDE ANY PRIVATE POND ORANYOFF-STREAMIONO. COOLING FOR REDUCTION 0R CONTROL IS HA POLLUTION OR C00LING, R WATER PRIOR TO DISCHARGE UNLESS THE DISCHARGE FROM THE POND, RESERVOIR, OR FACILITY CAUSES OR THREATENS TO CAUSE WATER POLLUTION. (WATER POLLUTION CONTROL BOARD: C2:26 JM:20; FILED FEB 25. 19W,1DOEDF LEE N1: ERRATA FILED MAR T.118;R26P.M:ED 1735 READOPTED FILED JAN ID, 2001, 32J P. M.: 241R 1518; READOPTED FILED NOV 21, 2007, L16 P.M.: 20071219-IR 32701 327 IAC 2-6.1-5 REPORTABLE SPILLS; FACILITY AUTHORITY: IC 13148-7 AFFECTED: IC 13-11-2: IC 13-16-1: IC 13-18-3: IC 111E-8: IC 1318-17 SEC. 5, THE FOLLOWING SPILLS FROM A FACILITY MUST BE REPORTED'. (1) SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH OR ACUTE INJURY OR ILLNESS TO HUMANS OR ANIMALS. (2) SPILLS FROM A FACILITY THAT HAS BEEN NOTIFIED IN WRITING BY A WATER UTILITY THAT IT IS LOCATED IN A DELINEATED PUBLIC WATER SUPPLY WELLHEAD PROTECTION AREA AS APPROVED BY THE DEPARTMENT UNDER 327 IAC 64.1 THAT ARE: (A) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS, (B) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE (55) GALLONS; OR (C) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE. (3) SPILLS THAT DAMAGE WATERS OF THE STATE AND THAT: (A) ARE LOCATED WITHIN FIFTY (50) FEET OF A KNOWN PRIVATE DRINKING WATER WELL LOCATED BEYOND THE FACILITY PROPERTY BOUNDARY; OR US ARE LOCATED WITHIN ONE HUNDRED (ION) YARDS OF (I) ANY HIGH QUALITY WATER DESIGNATED AS AN OUTSTANDING STATE RESOURCE PURSUANT TO 327 PC 2-1-2(3), EXCLUDING LAKE MICHIGAN; (II) ANY WATER DESIGNATED AS EXCEPTIONAL USE PURSUANT TO 327 IAC 2-13FRI (SIC., 327IAC 2-1-NAX6d AND 327I12-1-11(OF (III) ANY WATER DESIGNATED AS CAPABLE OF SUPPORTING A SALMONID FISHERY PURSUANT TO 327IAC 2-1 SIC C), EXCEPT LAKE MICHIGAN; OR (IV) ANY WATER THAT IS A FISH HATCHERY, FISH AND WILDLIFE AREA, NATURE PRESERVE, OR RECREATIONAL WATER OWNED By THE DEPARTMENT OF NATURAL RESOURCES OR THE FEDERAL GOVERNMENT. (4) FOR ANY SPILL WHICH DOES NOT MEET THE CRITERIA IN SUBDIVISIONS (1) THROUGH (3), THE FOLLOWING MOST BE REPORTED: (A) SPILLS TO SURFACE WATERS. (1) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) POUNDS OR THE REPORTABLE QUANTITY. W HICHEVER IS LESS: (1I) SPILLS OF PETROLEUM OF SUCH QUANTITY AS TO CAUSE A SHEEN UPON THE WATERS; OR (III) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4U 1) OF THIS RULE - UD SPILLS TO SOIL BEYOND THE FACILITY BOUNDARY. (I) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES W TEN THE AMOUNT SPILLED EXUDE US ONE HUNDRED (100) POUNDS OR THE REPORTABLE OUANTITV. W HICHEVER IS LESS: (1I) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE(SE) GALLONS: OR (III) SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) OF THIS RULE. (C) SPILLS TO SOIL WITHIN THE FACILITY BOUNDARY (1) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS THE REPORTABLE QUANTITY: (II) SPILLS OF PETROLEUM WHEN THE SPILLED AMOUNT EXCEEDS ONE THOUSAND 000)GALLONS: OR (IIn SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4H11) OF THIS RULE. (5) ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE. (WATER POLLUTION CONTROL BDARq ROT IAC 2-6.1-5, FILED FEB 25, 1997, 1:00 P.M.: 20 IF 1732; ERRATA FILED MAR 7.1997, 2:25 P.M.: 20 IS 1138: READOPTED FILED JAN 10, 2001, 323 P. M.: 241R 1518; READOPTED FILED NOV 21. 2007,1:16 PA.: 20071219-IR-327O70553BFA) SOILS TYPE LEGEND BE BROOKSTON SILTY CLAY LOAM 327 LAC 2-6.1-6 REPORTABLE SPILLS; TRANSPORTATION AUTHORITY: IC 13-14-8-7 C AFFECTED: IC 13-11-2, IC 131 IC 1 M8-3, IC 13-18-8, IC 1310-17 pp SEC.6. THE FOLLOWING SPILLS FROM A MODE OF TRANSPORTATION MUST NN BE REPORTED: 3 �' SP (1) SPILLS THAT DAMAGE THE WATERS OF THE STATE SO AS TO CAUSE DEATH y N OR ACUTE INJURY OR ILLNESS TO HUMANS OR ANIMALS. SI C (2) SPILLS THAT DAMAGE SU PEACE WATERS. d E 4 1z (3) SPILLS TO SOIL: ME (A) SPILLS OF HAZARDOUS SUBSTANCES OR EXTREMELY HAZARDOUS 50 p OF VC SUBSTANCES WHEN THE AMOUNT SPILLED EXCEEDS ONE HUNDRED (100) o_ ^CV EE v-Ft h POUNDS OR THE REPORTABLE QUANTITY, WHICHEVER IS LESS: O N Y. ME O E) SPILLS OF PETROLEUM WHEN THE AMOUNT SPILLED EXCEEDS FIFTY-FIVE (55) GALLONS. 4 RD NM OR Z ry C V 401 V NU SPILLS OF OBJECTIONABLE SUBSTANCES AS DEFINED IN SECTION 4(11) y1 E mSo 'OR Go OF THIS RULE. C .� F (4) ANY SPILL FOR WHICH A SPILL RESPONSE HAS NOT BEEN DONE (WATER V1' Z; t`C1 POLLUTION CONTROL BOARD: 327MAC 2-6.1-6: FILED FEB 25, INA 1:00 P.M.: 201R C G iF mCCm 1733; READOPTED FILED JAN 10, 2001, 3:23 P.M.: 241R 1518; READOPTED FILED NOV 21, 2007.1:16 RNI M071219-IR3270701 327 LAC 2-6.1-7 REPORTABLE SPILLS; RESPONSIBILITIES AUTHORITY: IC 13 148-7 AFFECTED: IC 1111-2 IC 13-16-1: IC 13-18-8: IC 1318-8: IC 1318-ll SEC. 7, MY PERSON WHO OPERATES, CONTROLS. OR MAINTAINS ANY MODE OF TRANSPORTATION OR FACILITY FROM WHICH A SPILL OCCURS SHALL.BE W UPON DISCOVERY OF A REPORTABLE SPILL TO THE SOIL OR SURFACE WATERS BE OF THEAINTHESTHE FOLLOWING a/ N BJ SPILL, IF TO SPILLED p ,A GPOSSIBLE,THEERS MATERIAL FROM ENTERING THE WATERS OF THE STATE. MATERIAL FROM OF THE STATE - W U 2 UNDERTAKE OR CAUSE OTHERS TO UNDERTAKE ACTIVITIES NEEDED TO 1) EE SPI ILL E. ACCOMPLISHAS LL�� W SOONAS POSSIBLE, BUT POSSIBLE BUT (2) HOURSARTMENT OF DISCOVERY, I� W .� COMMU00NA5 COMMUNICATE TO THE DE ENVIROINM REPORT TOTHEDEMRGENC rTII 2 RESPONSE SF M OFFICE ND ECTION IW L%Q COEI-O231-77FL NSATE CALLS(TOLLRESPONSESECTION: AREMANAGE AREA CODE FOR45 FOR— 5FOR INSTATECALLS(TOLLFREE) ,O STATE CALLS. IF ORS INFORMATION REPORTRNCREASE OUTOMESTKNOWN Uhl d A SIGNIFICANT BECOMES KNOWN THAT INDICATES AGIGNIFICANT INCREASE IN THE THAT IN THE ~ - ID ;PE, WATERSOFTHE STATE, THE RESPONSIBLE �F� N CJ N TIFYTH DEPARTMENT PART SHALL NOTIFY HOURSO IZI TWO (2 HOURS OF THE TIME THE NEW OR UPDATED INFORMATION BECOMES TWO (2) F THE TIME NEW OR UPDATED INFORIBLE MATION BECOMES 3 BE KNOWN. MEN �/ U) f0 DEPARTMENTES ENSESECTION(MANAGEMENT TO THELAND r�-I J 2525 OFFICE OF LAND QUALITY, EMERGENCY RESPONSE SECTION (MC Bfi3D), 2525 N. OFFICE OF QUALITY C r.l SO SHADELAND AVE., SUITE 100, INDIANAPOLIS, IN 46219-1787. A WRITTEN COPY OF Fy J THE SPILL REPORT IF REQUESTED IN WRITING BY THE DEPARTMENT. (5) EXCEPT FROM MODES OF TRANSPORTATION OTHER THAN PIPELINES, EXERCISE DUE DILIGENCE AND DOCUMENT ATTEMPTS TO NOTIFY THE FOLLOWING: (A) FOR SPILLS TO SURFACE WATER THAT CAUSE DAMAGE, THE NEAREST AFFECTED DOWNSTREAM WATER USER LOCATED WITHIN TEN(10)MILES I OF THE SPILL AND IN THE STATE OF INDIANA: AND cS c3 CM IS) FOR SPILLS TO SOIL OUTSIDE THE FACILITY BOUNDARY, THE AFFECTED m W ..3 - PROPERTY OWNER OROWNERS , OPERATOR OR OPERATORS. OR OCCUPANT 3 1'? y =M s¢ x - OR OCCUPANTS (WATER POLLUTION CONTROL BOARD:327IAC2-6.01. FILED Ef _ Og e FILED,ERRAT00LEDOCT E psc c - 24IRFEB 118, ERRATA FILED ERRATA FILED FB 29IR 24IR FEB20CC 1115 A M 29 ERRATA R-32 a3i333 OK4 7M. 242006.1P.M. A.M. 200-3270IR3270A DOP NOV21. %. H 1-I ERRCA:READOP-EDFILEDNOV2L 20W.1:080625:20071219-IR-327070553BFA: ERRATA FILED MAY 27, 200B, 2:0fi 111 E! 81 al P.M. 20080625-IR-327Rfi0419ACA) 327LAC 2-6.1-8 EMERGENCY SPILL RESPON SE ACTIONS AUTHORITY: IC 13-148-7 AFFECTED: IC 13-11-2; IC 13-18-11 IC 1118-3; IC 1118-8; IC 1118-1] SEC. 8. REPEATER STANDING ANY OTHER SECTION OF THIS RULE. EMERGENCY SPILL RESPONSE ACTIONS TAKE PRECEDENCE OVER REPORTING REQUIREMENTS, AND WHEN EMERGENCY SPILL RESPONSE ACTIVITIES RENDER SPILL REPORTING INCONSISTENT WITH EFFECTIVE RESPONSE ACTIVITIES. COMMUNICATION OF THE SPILL REPORTTO THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT MAY BE DELAYED. IN SITUATIONS WHERE THE SPILL REPORT IS DELAYED, THE BURDEN OF PROVING THE NEED FOR THE DELAY SHALL BE UPON THE RESPONSIBLE PERSON. ( WATER POLLUTION CONTROL BOARD; 327 RING 2 61-8; FILED FEB 25,1997, Too P. M. 20 IS 173D READOPTED FILED JAN 10, 2001, 323 P.M: 241R 1518, READOPTED FILED NOV 21, 2007, 1:16 PM: 20071219-IR-327070553BUM 327 IAC: 2-6.1-9 COM PI, ANC CONFI RM ATION AUTHORITY: IC 13-1"7 AFFECTED: IC 1311-2: IC 13-18-1: IC 1SYS 3: IC 13-18-B: IC 1318-17 SEC. 9. WHEN SPILL REPORTING AND RESPONSE, AS PROVIDED FOR IN THIS RULE. HAS OCCURRED THE DEPARTMENT SHALL UPON REQUEST, ISSUE A LETTER CONFIRMING COMPLIANCE WITH THIS RULE AND STATING THAT NO FURTHER ACTION IS REQUIRED UNDER THIS RULE. (WATER POLLUTION CONTROL BOARD: 327 IAC 2 61-9: FILED FEB 25,1997, 1:00 PA.: 201R 1734; READOPTED FILED JAN 10. 2001, 3:23 P. M.: 241R 1518; READOPTED FILED NOV 21, 2007.1:16 P M: 2 071219-IR-327070553BFA) SOIL STABILIZATION o METHOD AN, FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC, PERMANENT A i////I///Z4�*/I/p SEEDING C DORMANT B� B� SEEDING TEMPORARY 0� SEEDING AMA[ SODDING F**—./////I/////'�� MULCHING G A- KENTUCKY BLUEGRASS' 40 LOS/ACRE: CREEPING RED FESCUE 40 WSIACRE PLUS 2 TONS STRAW MULCHIACRE OR ADD ANNUAL RYEGRASS 20 LBSIACRE. B = KENTUCKY BLUEGRASS' 60 LBSIACRE: CREEPING RED FESCUE 60 LBSIACRE; PLUS 2 TONS STRAW MULCHIACRE, OR ADD ANNUAL RYEGRASS 30 LBSIACRE. C = SPRING OATS 3 BUSHELIACRE. 0 - WHEAT OR RYE 2 BUSHEIIACRE. E = ANNUAL RYEGEASS 40 LBSIACRE. F=SOD (BLEND 3IMPROVED VARIETIES). G = STRAW MULCH 2 TONSIACRE. 'LIP IRRIGATION NEEDED DURINGJUNE JULY, ANDIORSEPTEMBER. " IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. 'KENTUCKY BLUEGRASS BLEND OF 3IMPROVED VARIETIES. SEASONAL SOIL PROTECTION CHART THE MAIN SOIL FEATURES THAT ADVERSELY AFFECT ENGINEERING USES OF THIS SOIL AREA SEASONAL HIGH WATER TABLE, HIGH POTENTIAL FROST ACTION MODERATE SHRINK -SWELL POTENTIAL, AND MODERATE PERMEABILITY. THIS SOIL HAS SEVERE LIMITATIONS FOR BUILDINGSITES. THE SITES NEED TO BE ARTIFICIALLY DRAINED AND PROTECTED FROM FLOODING. DIVELLI RAS AND SMALL BU LD INGS WITH BASEMENTS SHOULD NOT BE CONSTRUCTED ON THIS SOIL. USING PROPERLY DESIGNED FOUNDATIONS AND FOOTINGS HELPS TO PREVENT STRUCTURAL DAMAGE FROM FROST ACTION AND SHRINKING AND SWELLING OF THE SOIL. THIS SOIL HAS SEVERE LIMITATIONS FOR LOCAL ROADS AND STREETS CLA BECAUSE OF SEASONAL HIGH WATER TABLE AND HIGH POTENTIAL FROST ACTION. INSTALLATION OF DRAINAGE DITCHES ALONG ROADS HELPS TO LOWER THE WATER TABLE 1111111111111114 ' AND PREVENT DAMAGE FROM FROST ACTION. THE BASE MATERIAL FOR ROADS AND STREETS ^+ SHOULD BE REPLACED OR STRENGTHENED WITH SUITABLE MATERIAL. , Br UP 9TOBY PERCENT SLOPES. SOIL FEATURES THAT ADVERSELY AFFECT THE ENGINEERING USES THIS SOIL AREA SEASONAL HIGH WATER TABLE, MODERATE N SHRINK -SWELL POTENTIAL,HIGH Know what's below. ATIONSFORBILDING ITIONANDSLOWPERMEABILITY.THIS SOIL HAS SOME LIMITATIONS BIECOMITES EAPROLE TOBE Call before dI DRAINED TO WETNESS FROM OD ND Y A WITH TBE CONSTRUCTED SMALL BUILDINGS SHOULD NOT O STRUCT DON THIS SOIL SMALL USING Worin00-Jo Call NO SCALE AND PROPERLY DRAINED FOUNDATIONS AND FOOTINGS HELPS TO PREVENT STRUCTURAL OHMAGE FOUNDATIONS HELPS TO 811 or 800-382-5544 FROM LOW STRENGTH THIS SOIL HAS SEVER ¢e nourzaAWLIAIC wee¢ THE MATERIAL WE REETS ELLING THE ROADS LIMITATIONS FOR LOCAL ROADS AND STREETS. THE BASE MATERIAL FOR ROADS NEEDS TO BE LOCAL PROJECT LOCATION STRENGTHENED OR REPLACED WITH SUITABLE MATERIAL THE sre¢law o a c>miF SOILS THE UNDERN 0N1 MAP NS--Oc)w2RKrvG 4 2 iR iR G C) Z U a 2 1 U od W ❑ z 0.1 rn z x a LL O z W U U ^W^ DO W Ln Q 00 V) O 4 T NO. W 18.0605