Loading...
HomeMy WebLinkAboutCivil Plans 4.8.19 510 9 8 7 6 5 4 3 2 1 1 c I FLAP -BOWL TYPICAL CURB BOX TYPICAL FLAT RECTANGULAR ROLLED CURB INLET FILTER INLET FILTER INSTALLATION'. 1. REMOVE GRATE 2. DROP FLEXSTORM INLET FILTER ONTO R FLEXSTORM Inlet Filter S fications LOAD BEARING LIP OF CASTING OR �� CONCRETE STRUCTURE WOVEN Geotextile SedimentBa 3 ens 2ft vol 3. REPLACE GRATE Material Property Test Method Value(ave) Grab Tensile ASTM D4632 255x275 Puncture Strength ASTM D4833 135lbs Trapezoidal Tear ASTM D4533 75lbs UV Resistance ASTM D4355 90% Apo Open Size(AOS) ASTM D4751 20 sieve Permiftivity ASTM D4491 1.51 sec Water Flow Rate ASTM D4491 200 pm)sclt Sediment Removal ASTM D7351 82% NOTH: A)-20' MINIMUM OR FULL WIDTH BE ENTRANCEIEXIT DRIVE, WHICHEVER IS GREATER IPTIONAL) INSTALLATION 1. REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2, GRADE THE FOUNDATION AND CROWN FOR POSITIVE DRAINAGE. 3. INSTALL A CULVERT PIPE UNDER THE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD DRAINAGE. 4. IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTILE FABRIC ON THE GRADED FOUNDATION TO IMPROVE STABILITY. 5. PLACE AGGREGATE(INDOT CA NO, 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE CONSTRUCTION PLANS, LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE. 6 TOP -DRESS THE DRIVE WITH WASHED AGGREGATE (INDEED CA NO 2) T WHERE POSSIBLE. DIVERT ALL STORM WATER RUNG FF AN D DRAINAGE FROM THE TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN. MAINTENANCE _ INSPECT DAILY. _ RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. TOP -DRESS WITH CLEAN AGGREGATE AS NEEDED. (� r1 Ul I D AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS. RELEAJED FOR CDNdTRUCTIDN 3E USED IF THE WATER FROM THE CONSTRUCTION DRIVE CAN BE CONVEYED ARN Subject to compliance with all regulations PAGE 22 AND 231N INDIANA STORM WATER QUALITY MANUAL. of StateaBEBNIIeI tLCB Codes ;ONSTRUCTION INGRESS/EGRESS PAD City Ot IO ACRES (NO SCALE) �VT�tmHNWA� 9 DATE: 06/17/19 RYSTEM TYPICAL ROUND INLET FILTER ALL PRODUCTS MANUFACTURED BY INLET 8 PIPE PROTECTIOR. ING DISTRIBUTED BY ADS WAGON INLETFILTERS. DOM WHEAT OR RAE PRESS 1 TO IS INCHES MEET 15 JET SO 1. PERENNIAL SPECIES MAYBE USED ASA TEMPORARY COVER ESPECIALLY IF THEARICTO BE SEEDED WILL REMAIN IDLE FOR MORE THAN ME YEAR. 2. SELLING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES ME CHANCES OF SEEDING FAILURE . DATES MAYBE EXTENDED OR SHORTENED BASED ON THE LOCATION ROME PROJECT SITE WITHR THE STATE. NOTES 1. MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY SEEDING, PROVIDEDTHATRIS APPROPRIATELY ANCHORED. 2 A HIGH POTENTIAL FOR FERTILIZER, SEED AND MULCH TO WASH EXISTS ON STEEP RANKS CUTS ANDINCHANNEISANDAREAS OF CONCENTRATED FLOW. SEEDBED PREPARATION 1 MET SOIL TO DETERMINE PH AND NUTGENT LEVELS. 2. ARMY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL MST, IF TESTING IS NOT DONE, APPLY 4 W TO WDPOUNOS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER. OR EQUIVALENT. 3. WORK THE SOIL AMEN DMENTS INTO THEwPER TWO TO FOUR INCHES OF THE ACT WITH A DISK OR RAKE OPERATED ACROSS THE SLOPE. SEEDING L SELECT A SEED SPECIES GRAN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1. 2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED TO THEDEPTH SHOWN IN TABLE I. NOTES 1.IF DRILLING OR BROADCASTING THE SEES. ENSURE GOCOSEED TOSOILCONTACT BY FIRMING THE SEEDBED OATH ARGUER OR CULTIPACKER AFTER COMPOUND SEEDING OPERATIONS. 2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE. 3.IF SEEDING IS DONE WITH A HYDROSEEDER FERTU ET AND MULCH CAN BE APPLIED W FIR THE SEED IN A SLURRY MIXTURE. 3. APPLY MULCH AND ANCHOR T IN PEACE. MAINTENANCE 1 INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EMERY SEVEN CALENDAR DAYS. 2 CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIVO LY. 3. MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (W PERCENT SENSIBLE; RESEED. FERTILIZE, AND APPLY 4. MULCH WHERE NECESSARY. 4 IF DEFICIENCY DECIENCY IS APPARENT. TOPDRESSFALL SEEDED "EAT DR RYE SEEDING WITH IF POUNDS PER ACRE OF NITROGEN IN FEBRUARY OR MARCH. REFERENCE IN CHAPTER 7 PAGES 31SIX 1N THE INDIPNA STORM WATER QUALITY MANI TEMPORARY SEED 4' (MINIMUM) "SWPPP INFORMATION' MUST BE DISPLAYED PROMINENTLYO THE TOP OF THE SIGASHOWN DETAIL WNN N AILL THE HISWPPP INFORMATION THE DET. COPY OF �� IDEM COPY OF NOTICE OF OF DRAINAGE SUFFICIENCY NOI APPROVAL SIGN TO BE CONSTRUCTED OF A LETTER RIGID MATERIAL. SUCH AS PLYWOOD OR OUTDOOR SIGN COPY COPY COPY BOARD. SIGN MUST BE OF OF OF -_ CO PROTECT DOCUMENTS RTO CONSTRUCTION CONSTRUCTIO OF PRODUET DOCUMENTS S FROM SITE SITE SITE DAMAGE DUETOWEATHER (WIND, NOTICE AS NOTICE AS NOTICE AS p SUN, MOISTURE, ETC.). APPLICABLE APPLICABLE APPLICABLE DETAILED DESCRIPTION OF THE LOCATION OF THE SWPPP DOCUMENTATION (BINDER AND SITE MAPS) ON THE SITE. WE" TREATED PLYWOOD 481 PAINTED WHITE i- "" q) Q) I0 PULL ETTER 6' HEIGHT LAG SCREWS Be > I POST 3'x3'xe' SECTION LINE NOTES: 1. THE SWPPP INFORMATION SIGN MUST BE LOCATED NEAR THE CONSTRUCTION EXIT OF THE SITE. SUCH THAT IT IS ACCESSIBLE AND VIEWABLE BY THE GENERAL PUBLIC, BUT NOT OBSTRUCTING VIEWS AS TO CAUSE A SAFETY HAZARD. 2. ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE -OF -TERMINATION (NOT) IS FILED FOR THE PERMIT. 3. CONTRACTOR SHALL POST OTHER STORM WATER ANNOR EROSION AND SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCY. 4. SIGN SHALL 6E LOCATED OUTSIDE OF PUBLIC RIGHTTOF-WAY AND EASEMENTS UNLESS APPROVED BY THE GOVERNING AGENCY. 5. CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP INFORMATION SIGN. SWPPP INFORMATION SIGN (NO WALE) WOOD OR METAL STAKES TO SECU THE STRAW BALE (TWO PER BALE) I III�I II- STRAW BALE LLLJJJ POLYETHYLENELINING IO 10 MIL. PLASTIC LINING MIL. EXTENDING OVER BALES PLAN\TO METAL PINS OR STAPLES SECURE THE POLYETHYLENE LINING TO THE STRAW BALES MAINTENANCE 1. INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS. SPILLS, TRACKING OF SOIL BY EQUIPMENT, AND THE POLYETHYLENE LINING FOR FAILURE. 2. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES W PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL PROPERLY CLEANED OUT. 3. PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF MATERIAL USUALLY DAMAGES IT. 4. REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. 5. IF LIQUIDS LED NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN AN ACCEPTABLE METHOD. 6. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE CLOSED AND HOLES, DEPRESSIONS AND OTHER DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED. 6 1 7 6 1 5 2-WOOD POSTISTAKES WRAPPED WITH SILT FENCE AND ROTATED AT LEAST ONE FULL TURN TO SECURE �q SILT FENCE END IN PLACE SILT FENC E 2-WOOD POSTISTAKES WRAPPED WITH SILT FENCE AND ROTATED AT LEAST TWO FULL TURNS TO PROMDEASECURE CONNECT ION POST SILT FENCE` TO JOIN TO ENDS OFTWO FENCES. )ST 2"XT WOOD OR 1 33 _BSIFOOT STEEL 6 MAX. SPACING WOVEN FILTER FABRIC SILT FENCE MATERIAL COVER O 2'x2'x36' HARDWOOD p STAKESTYP.) (@1000 C. OOF 3JIGED Z 12' MIN. DEEP FROM GRADE G V 12"FILTREXX j N [C- SILTSOXXPER AC q MANUFACTURER'S EXISTING SPECIFICATIONS OR GRADE SO'� F _ m APPROVED EQUAL BUT O V ME - AC a h LcADo k U D ED c •• 4 N v N M ED 3 z ry C V Vl V _ _ CG 7t CG MAINTENANCE: =.`? t --- 'Q - INSPECT DAILY. JULO O G m 2 - REMOVE ACCUMULATED SEDIMENT FROM PAVED AREA (DO NOT FLUSH WITH WATER) AFTER 3 m m EACH STORM EVENT. DEPOSIT SEDIMENT IN AN AREA WHERE IT WILL NOT RE -EWER THE PAVED AREA OR STORM DRAINS. - INSPECT FOR DAMAGE BY VEHICULAR TRAFFIC AND REPAR IF NEEDED. COIR LOG (FIBER ROLL) MAXIMUM LOAD SLOPE AND DISTANCE FOR WHICH A SILT FENCE IS APPLICABLE LOAD SLOPE MAX. DISTANCE ABOVE FENCE LESS THAN 2% 100 FT. 2 TO5% 75 FT. 5 TO 10% 50 FT. 10 TO 20% 25 FT. MORE THAN 2D% 15 FT. POSTS: STEEL T OR U TYPE, OR 2'X2' HARD WOOD POST FENCE: WOVEN WIRE ,14-112 GA., 6" MAX. MESH OPENING FABRIC'. IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. POST 2'X2' WOOD OR 1.33 LIEWFOOT _ STEEL 8MAX. SPACING WIRE FENCE 14 LEAGUE (MINDS" MESH RED . IN SWALES OR AREAS OF CONCENTRATED FLOW FEW" TRENCH TO BE BACKFILLED % 8'X4'TRENCH TO BE AND COMPACTED BACKFILLED AND COMPACTED FINISH CREOLE - FINISH GRADE OW O J m 4 GEOTEXTILE FABRIC LAID ON JNDISTURBED II III - Imo= C_ JOAN SLOPE SIDE AND UNDISTURBED I ii GROUND - -III I- BOTTOM OF TRENCH GROUND III I IT INTO GROUNDBEDDED LWI 4'ND E LAIDMATERIAL ALO GBOTTTOM OF f �rll TRENCH. SOIL SLICING IN ACCORDANCE 1 PT64 WITHAABBLD 628221E ALSO 9I 111I ACCEPTABLE WITHOUT WIRE SUPPORT I. 11 11 1-I GEOTEXTILE FABRIC LAID C ON DOWN SLOPE SIDE AND FIB I- BOTTOM OF TRENCH III C EMBEDDED SILT FENCE MATERIAL MIN.T I I INTO GROUND WI 4' LAID ALONG BOTTOM OF UP TRENCH. SOIL SLICING IN ACCORDANCE WITH 1-III- ASTMD64628221SALSOACCEPTABLE. WITH WIRE SUPPORT INSTALLATION PREFABRICATED SILT FENCE 1. LAY OUT THE LOCATION OF THE! 3 FENCE SO THAT IT IS PARALLEL TO THE CONTOUR OF THE SLOPE AND AT LEAST 10 FEET BEYOND THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE AREA. TURN THE ENDS OF THE FENCE UP SLOPE SUCH THAT THE POINT OF CONTACT BETWEEN THE GROUND AND THE BOTTOM OF THE FENCE END TERMINATES AT A HIGHER ELEVATION THAN THE TOP OF THE FENCE AT ITS LOWEST POINT. 2. EXCAVATE AN EIGHT -INCH DEEP BY FOUR -INCH WIDE TRENCH ALONG THE ENTIRE LENGTH OF THE FENCE LINE. INSTALLATION BY PLOWING IS ALSO ACCEPTABLE. 3. INSTALL THE SILT FENCE WITH THE FILTER FABRIC LOCATED ON THE UP -SLOPE SIDE OF THE EXCAVATED TRENCH AND THE SUPPORT POSTS ON THE DOWN -SLOPE SIDE OF THE TRENCH. 4. DRIVE THE SUPPORT POSTS AT LEAST 18INCHES INTO THE GROUND. TIGHTLY STRETCHING THE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH. 5. LAY THE LOWER FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF THE TRENCH AND EXTEND ITTOWARD THE UPSLOPESIDE OF THE TRENCH. 6. BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE NOTE: IF THE SILT FENCE IS BEING CONSTRUCTED ON -SITE ATTACH THE FILTER FABRIC TO THE SUPPORT POSTS AND ATTACH WOODEN LATHE TO SECURE THE FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLLOWING STEPS 1 THROUGH 6 ABOVE. MAINTENANCE _ INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. _ IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY NOTE. ALL REPAIRS SHOULD MEET SPECIFICATIONS AS OUTLINED WITHIN THIS MEASURE. _ REMOVE DEPOSITED SEDIMENT WHEN C IS CAUSING THE FILTER FABRIC TO BULGE OR WHEN IT REACHES ONE-HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, GRADE THE SITE TO BLEND WITH THE SURROUNDING AREA AND STABILIZE. REFERENCE IN CHAPTER 7 PAGES 215-221 IN THE INDIANA STORM WATER QUALITY MANUAL SEDIMENTATION/SILT FENCE (NO SCALE) INSTALLATION 1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO INSTALL THE SYSTEM. 2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE CONTAINMENT SYSTEM � W N W LJ L� W W .� Z Wz�¢° HN CE N CE s T GO 3 MEN J J ED a 1R J 3 W3_N C SC C NOTES: 3. A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS ABU OTHER DEBRIS Z 1. ACTUAL LAYOUT DETERMINED IN THAT CAUSE TEARS PUNCTURES IN THE LINING. J FIELD. 4. STALL T POLYETHYLENE CAVATEYETHVL MS, THE LINING SHOULDEXTENDO EMEDSYSTEMS ID OVER HE ENTIEXCAVAILININGLINING FORSEEMED SYSTEMS SHOULD INSTALLED OVER OVERTHEIRE EXCAVATION THELININGFOR SHOULD 2. THE CONCRETE WASHOUT SIGN THE POOLING AREA WITHENOUGH MATERIAL EXI THE ENOUGH EXTEND THE LINING OVER THE BERM OR IY INSTALLED WITHIN SOFT CONTAINMENT SYSTEM THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER E Q WOOD OR METALSECURE OF TEMP CONCRETE METAL PINS STAPLES FASTENERS. U STAKES TO WASHOUT FACILITY. THE TOSECUREYETHYL 5. PLACE G. OR EQUIVALENT TO PROVIDE ABARRIER TO CONSTRUCTION Z BALES THESTRAW BALES NE POLYETHYLENE LINING D07HERSAFETY EQUIPMENT TRAFFIC RAP NTACOULAPING (TWO PER BALE) TO THE STRAW BALES 6. PLACE A NOIC. OVER THE TFAILIE PRIOR TO G RAINFPSING,NTTOPREVENT ANGCOVER PREVENT ACCUMJLATION OF WATER AND POSSIBLE A PREDICTED WATER AND A PREOIOWOFT BINDING WIRE THE SYSTEM OVERFLOW OFTHE SYSTEM (OPTIONAL). L{f T INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS. CI POLYETHYLENE LINING IO 8 POSTSIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS. Z MIL. EXTENDING OVER 9. WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS(SEETEMPORARY CONSTRUCTION Ilfffy��---((( Q BALES STRAW BALE MR) INGRESSIEGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD FOR CONCRETE WASHOUT SYSTEMS YSTEM SUSE B 1 10. A ALL POLYETHYLENE LINED DUMPSTER A3 AN ALTERNATE. LL '�11=1 =1 /-I O ll I�ICi�(I IL=, Illal�lllal� 1��I l IF CONCRETE WASHOUT a �I TYPE •ABOVE GRME z ED Z a IK Jll (NO SCALE) Imo! AS STRAW SALES" of ¢' \g OOE3 R METAL NATIVE MATERIAL (OPTIONAL) BRIEF SECTION BALE ALTERNATE CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT. O o Be n W La 0 /A 311 ° FOY F- a ¢ U] O �n Know what's below. Call before you dig SHEE�TN`O1. Wphin IRI00-J Cal/ / 1 0 24 or 800-3I,OF 4 \C 1 30 Hourz a Pop ] W a M- e PER INDIANA STIT IS AGAINST ATE Low C _ FI(- I NO. LOCAT1AYR WF1a1 ,.M,v1I ..,, W18.0605 4 3 1 2 1