Loading...
HomeMy WebLinkAboutCivil Plans 4.18.19 1710 9 Y 6 5 4 Y 2 1 e e STORM SEWER SPECIFICATIONS 1. SCOPEOFWORK 1.A. THE WORK UNDER THIS SECTION INCLUDES ALL STORM SEWERS, STORM WATER INLETS, AND RELATED ITEMS, INCLUDING EXCAVATING AND BACKFILLING, NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS. 2. MATERIALS 2.A STORM SEWERS: 2.A.1. REINFORCED CONCRETE SEWER PIPE SHALLCONFORM TOASTM GI6 CLASSES LATEST REVISION WITH JOINTS CONFORMING TO ASTM Cd 13 LATEST REVISION. 2A2 STORM SEWERS HANGER'HIQ' PIPE AND AM OR APPROVED EQUAL: WITH THE FOLLOWING REQUIREMENTS: 2.A.2.a. 41NCH THROUGH 10 INCH MEETING AASHTO M252 TYPE S. 12 INCH THROUGH 361NCH MEETING AASHTO M294 TYPE S. 2A.2.b. GASKETSMEETINGASTMD1056GRADE2N. 2A.2.c. FITTINGS MEETINGASSHTO M262 ORAASHTO M294, MEETING ASTM W350 CELL CLASSIFICATION 324420C: OR ASTM D3350 TYPE III, CLASS C, CATEGORY4, GRADE P33. 2.8. DRAINAGESTRUCTURES: 2.B.1. PRECAST REINFORCED CONCRETE DRAINAGE SECTIONS AND STEPS SHALL CONFORM TO ASTM C478 LATEST REVISION AND LATEST REVISION OF INGOT PRECAST STRUCTURE DETAILS. 2.B.2. CASTINGS SHALL BE OF UNIFORM QUALITY FREE FROM BLOW HOLES POROSITY HARD SPOTS SHRINKAGE DISTORTION OR OTHER DEFECTS, THEY SHALL BE SMOOTH AND WELL CLEANED BY SHOT BLASTING OR BY SOME OTHER APPROVED METHOD. THEY SHALL BE COATED WITH ASPHALT PAINT WHICH SHALL RESULT IN A SMOOTH COATING. TOUGH AND TENACIOUS WHEN COLD, NOTTACKY OR BRI ET.E. THEY SHALL BE GRAY IRON MEETING ASTM A-48 LATEST REVISION. 23.3. JOINTS- STRUCTURE SECTIONS SHALL BE JOINTED WITH RUBBER TYPE GASKETS, THE RUBBER TYPE GASKETS SHALL MEET ASTM G443 LATEST REVISION. 2Q. SUBDRAINS: 2.C.1. PERFORATED PLASTIC PIPE SUBDRAINESHALL CONFORM TOASTM W034, SDR35, ASTM D2729, OR ASTM F405. 3. APPLICATION 3A PERMIESANDCODES: THEINTEWOFTHISSECTIONOFTHESPECIFICATIONSISTHATTHE CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL, APPLICABLE CODES AN REGULATIONSAS AMENDED BYANY WAIVERS. CONTRACTOR SHALL FURNISH ALL BONDS NECESSARY TO GET PERMITS FOR CUTS AND CONNECTIONS TO EXISTING SEWERS. 3AL LOCAL STANDARDS: THE TERM 'LOCAL STANDARDS' AS USED HEREIN MEANS THE STANDARDS OF DESIGN AND CONSTRUCTION OF THE RESPECTIVE MUNICIPAL DEPARTMENT AND/OR UTILITY COMPANY. D.C. EASTNGIMPROVEMENTS: MAINTAININOPERATINGCONDITIONALLACTIWUTILITIES,SEWERS AND OTHER DRAINS ENCOUNTERED IN THE SEWER INSTALLATION. REPAIR TO THE SATISFACTION OF THE OWNER ANY DAMAGE TO EXISTING ACTIVE IMPROVEMENTS. DO. WORKMANSHIP: TO CONFORM TOALL LOCAL, STATE AND NATIONAL CODES AND TO BE APPROVED SMALL LOCAL AND STATE AGENCIES HAVING JURISDICTION. 3.E. TRENCHING: LAYALLRPEINOPENTRENCHES,EXCEPTWHENTHELOCALAUTHORIWGIW WRITTEN PERMISSION FOR TUNNELING. OPEN THE TRENCH SUFFICIENTLY AHEAD OF PIPE LAYING TO REVEAL ANY OBSTRUCTIONS. THE WIDTH OF THE TRENCH SHALL BE THE INSIDE PIPE DIAMETER PLUS Z4INCHES FOR 121NCHES ABOVE THE PIPE. SHEET AND BRACE TRENCH AS NECESSARY TO PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING TO COMPLY WITH OCCUPATIONAL SAFETYAND HE LTH ADMINISTRATION STANDARDS. KEEP TRENCHES FREE FROM WATER WHILE CONSTRUCTION IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR APPURTENANCES IN STANDING WATER. CONDUCT THE DISCHARGE FORM TRENCH DEWATERING TO DRAINS OR NATURAL DRAINAGE CHANNELS. BY. SPECIALSUPPORTS: WHENEVER, IN THE OPINION OF THE ENGINEER, THE SOIL ATM BELOW THE PIPE GRADE IS UNSUITABLE FOR SUPPORTING SEWERS AND APPURTENANCES SPECIFIED IN THIS SECTION, SUCH SPECIAL SUPPORT, IN ADDITION THOSE SHOWN OR SPECIFIED, SHALL BE PROVIDED AS THE ENGINEER MAY DIRECT, AND THE CONTRACT WILL BE ADJUSTED. D.E. BACKFILLING 3.GA, RCP BACKBITING: FOR DEPTH OF AT LEAST 121NGHESABOW THE TOP OF THE PIPE,BACKFILL WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROCK FRAGMENTS, ROOTS OR SOD. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANUTAR MATERIALS. 3.G.2. HOPE BACKFILLING FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE,BACKFILL WITH GRANULAR MATERIAL. COMPACT THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BYAPPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIALS. S.H. SUBDRAINS: ALLSUBDRAINS ON SITE SHALL BE OF THE SIZE ASSHOWNAND SHALL BE PLACEDAS SHOWN ON THE PLANS. THEY SHALL BE CONSTRUCTED TO THE GRADES AS SHOWN ON THE PLAINS. 3.1. UTILITIES: ITSHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TOVERIFYALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK IT SHALL ALSO, BE THE CONTRACTORS RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City DDf Cabeed (\�� �VT�Ut�O*tiYWML DATE: 06/17/19 9 WATER LINE SPECIFICATIONS 1. SCOPE OF WORK 1A. THE WORK REOJI RED UNDER FIT S SECTION INCLUDED ALL COLD WATER DISTRIBUTION LINES. VALVES, N3ER PITS, HYDRANTS, AND RELATED ITEMS INCLUDING EXCAVATING AND BACKFILLING NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS. THE END OF WATER SERVICE LINES SHALL BE TIGHTLY PLUGGED OR CAPPED AT THE TERMINAL POINTS PENDING THE CONNECTING TO ALL SUCH LINES OF THE BUILDING PIPING AS SPECIFIED IN THE PLUMBING SPECIFICATIONS AND ARCHITECTURAL DRAWINGS. 2. MATERIALS 2A. DUCTILEIRONPIPE: DUCTILE IRON PIPE SHALL MEET AWWA C-150 AND G151 SPECIFICATIONS. PIPE SHALL BE CEMENT LINED PER AWWA C 104. 2S COPPERTUBING'. SHALL BE SEAMLESS. ANNEALED COPPER TUBING COMPLYING WITH FEDERAL SPECIFICATION SAN 799. FITTINGS SHALL BE WROUGHT COPPER OR CAST BRONZE WITH SOLDER JOINTS. SOLDER SHALL BE OF A COMPOSITION RECOMMENDED BY THE MANUFACTURER OF THE FITTINGS. 2.C. FIREHYORANTS. SHALL COMPLY WITH AWWA SPECIFICATION G502 AND SHALL MEET LOCAL STANDARDS AND REQUIREMENTS, PARTICULARLY AS TO NOZZLE DIAMETERS AND THREADS, DIRECTION OF OPENING AND DIMENSIONS OF OPERATING AND CAP NUTS. FIRE HYDRANTS SHALL HAVE ONE PUMPER AND TWO HOSE NOZZLES. A VALVE OPENING NOT LESS THAN 51NCHES ME A6INCH INLET CONNECTION. THE LENGTH OF THE HYDRANT BARRFI SHAI I BE DETERMINED BY THE SPECIFIED DEPTH OF COVER OVER THE PIPE. 2.0, VALVES: ALL VALVES AND STOPS SHALL HAVE ENDS SUITED OR ADAPTERS SHALL BE PROVIDED FOR THE PROPER INSTALLATION IN THE LINES IN WHICH THEY ARE LOCATED. VALVES SI ALL MEET LOCAL STANDARDS OR IN TI IE ABSENCE OF SUCI I STANDARDS. TIE FOLLOWING REQUIREMENTS. 2A.1, VALVES IN CAST IRON PIPE SHALL BE IRON BODY, BRONZE MOUNTED, DISC GATE VALVES CONFORMING TOAW WA SPECIFICATION G500. THEY SHALL OPEN IN THE SAME DIRECTION AS THOSE USED IN THE LOCAL WATERWORKS SYSTEM VALVE STEMS SHALL TERMINATE IN 21NCH WRENCH NUTS. FURNISH TWO (2) KEYS. 2D2. VALVES IN COPPER PIPE SHALL BE STANDARD BRASS BODY,ROUND-WAY,GROUND-KEY STOPS, WITH T HEADS. FURNISH TWO (2) KEYS. 2.E. VALVE BOXES: SHALL MEE I LOCAL S I ANUARDS OR IN I H E ABSENCE OF SUCH SMALL COMPLY WITH THE FOLLOWING REQUIREMENTS: 211. FOR IRON BODY VALVES, BOXES SHALL BE APPROVED STANDARD BUFFAL0.TYPE CAST IRON, ADJUSTABLE SHAFT BOXES, HAVING A MINIMUM SHAFT DIAMETER OF 5-1/4 INCHES. 2S2 2 FOR BRASS BODY VALVES (STOPS) BOXES SHALL BE APPROVED STANDARD CAST IRON EXTENSION SERVICE BOXES, HAVING A MINIMUM DIAMETER OF 2-1/2INCHES AND HAVING LID HELD IN PUCE BY A BRASS OR BRONZE BOLT. THE CASTINGS SHALL BE COATED WITH TWO COATS OF COAL -TAR PITCH VARNISH. FURNISH TWO (2) KEYS FOR BOLT IN LIDS. 3. APPLICATIONS. 3A. PERMITSANDCODES: THE INTENT OF THIS SECTION OF THE SPECIFICATIONS IS THAT THE CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL FURNISH ALL NECESSARY BONDS TO GET PERMITS FOR CUTS AND CONNECTIONS. 3.B. EXISTING IMPROVEMENTS: MAINTAIN IN OPERATING CONDITION ALL ACTIVE UTILITIES AND SEWERS AND OTHER PIPE SYSTEM THAT MAY BE ENCOUNTERED. &C. TRENCHING: LAY ALL PIPE IN OPEN TRENCHES, EXCEPT WHEN LOCAL AUTHORITY GIVES WRITTEN PERMISSION FOR TUNNELING. PROVIDE SEPARATE TRENCH FOR THE WATERLINE AT LEAST 10 FEET HORIZONTALLY FROM ANY SANITARY SEWER. IN LOCATIONS WHERE SEPARATE TRENCHES FOR SEWER AND WATER LINES ARE IMPRACTICABLE, LAYTHE WATER PIPE ON A SOLD SHELF AT LEAST 18INCHES ABOVE THE TOP OF THE SEWER, 3.D. WIDTHOFTRENCH: EXCAVATE TRENCHES 12 INCHES EACH SIDE OF THE PIPE FOR PROPER INSTALLATION OF PIPE. 3E. SHEETING AND BRACING: SHEET AND BRACE TRENCHES AS NECESSARY TO PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING SHALL COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS. 3F. WATERREMOVAL. KEEP TRENCHES FREE FROM WATER WHILE CONSTRUCTION THEREIN IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR APPURTENANCES IN STANDING WATER. CONDUCTTHE DISCHARGE FROM TRENCH DEWATERING TO DRAINS, OR NATURAL DRAINAGE CHANNELS. 3.13. GRADING TRENCH BOTTOMS'. THE BOTTOM QUADRANT OF THE PIPE SHALL BE FULLY AND UNIFORMLY SUPPORTED. THE FULL LOAD SHALL REST ON THE BARREL OF THE PIPE. THE TRENCH MAY BE EXCAVATED TO A DEPTH OF 41NCHES OR MORE BELOW FINAL GRADE WITH SAND, CRUSHED STONE OR GRAVEL BACKFILL TO BRING IT BACK TO PIPE TRYING GRADE. FOR A DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE BACKFILL WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROOTS OR FROZEN CLOGS. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. BACKFILL UNDER WALKS, PARKING AREAS ORIVEWIAYS AND STREETS WITH GRANULAR MATERIAL ONLY AND TAMP THOROUGHLY, BY APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 10 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR MATERIAL. BE. TESTS: BEFORE JOINTS ME COVERED, FILL THE PIPING WITH WATER, OPENING HYDRANTS OR OTHER OUTLETS TO EXPELAIR. TEST THE PIPING FOR LEAKAGE AS REQUIRED BY THE LOCAL UTILITY. INSPECT ALL JOINTS FOR LEAKAGE AND REMEDY ANY LEAKS. UPON COMPLETION OF THE WATER LINES, FLUSH OUT THE SYSTEM UNTIL THE WATER RUNS CLEAR. AS SOON AS THE SYSTEM HAS BEEN FLUSHED OUT, IT SHALL BE STERILIZED IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL UTILITY. 31 IF A HORIZONTAL DISTANCE OF IO FEET CANNOT BE MAI NTAINED BETWEEN THE WATER LINE AND THE SANITARY SEWER LINE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS WITHIN 1C OF EITHER SIDE THE WATER LINE. 3J. UTILITIES: IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE WORK 15 STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. 3K NEW WATERLINE CONSTRUCTION: CONTRACTORTO RECORD DIMENSION OF EACH WATER STUB AND VALVES FROM NEAREST FIRE HYDRANT MEASURED ALONG WATER MAIN. THE LOCATIONS OF HYDRANTS AND WATER VALVES, ALONG WITH ANY OTHER CONSTRUCTION CHANGES ARE TO BE INCORPORATED ON THE ORIGINAL CONSTRUCTION DRAWINGS AND 'RECORD DRAWING' PRINTS SHALL BE SUBMITTED TO THE LOCAL UTILITY AS SOON AFTER COMPLETION OF CONSTRUCTION AS POSSIBLE. 8 SANITARY SEWAGE SPECIFICATIONS 1. SUMMARY 1A, BECTON INCLUDES: 1A1. SANITARY SEWER DRAINAGE PIPING,FITTINGS, ACCESSORIES, CLEANOUTS, AND BEDDING. 1A2 CONNECTION OF SITE SANITARY SEWER SYSTEM TO MUNICIPAL SANITARY SEWER SYSTEMS. 1.B. RELATED REQUIREMENTS: 1A1. SECTION023M EARTHWORM TRENCHING, BACKFILL, AND COMPACTION FOR UTILITIES 1A.2, SECTION02536- SEWER MANI TOLES. FRAMES. AND COVERS 1A3. SECTIONW310- CAST -INTIACE STRUCTURAL CONCRETE 2. REFERENCES 2A. THE PUBLICATIONS LISTED BELOW FORM A PART OF THIS SPECIFICATION TO THE EXTENT REFERENCED. PUBLICATIONS ARE REFERENCED WITHIN THE TEXT BY THE BASIC DESIGNATION ONLY. 23. ASTM INTERNATIONAL (ARTS). 2,B.1. ASTM A74- CAST IRON SOIL PIPE AND FITTINGS 2.B2 ASTM A746- DUCTILE IRON GRAVITY SEWER PIPE 2.13.3. AS I C425- COMPRESSION JOIN I S FOR VI I RIFIEU CLAY PIPE AND HI I INGS 2B4. ASTM C564- RUBBER GASKETS FOR CAST IRON SOIL PIPE AND FITTINGS 2 8.5. ASTM C700- VITRIFIED CLAY PIPE EXTRA STRENGTH, STANDARD STRENGTH, AND PERFORATED 2B.6. ASTMD2241- POLY( VINYL CHLORIDE) (PVC)PRESSURE -RATED PIPE(SDR SERIES) 2.B7 ASTMD2657 HFATJOINING POLYOLEFIN PIPE AND FITTING5 2.B.8. ASTM D3034 - TYPE PSM POLY (VINYL CHLORIDE)( PVC) SEWER PIPE AND FITTINGS 213.9. ASTMD3035- POLYETHYLENE (PE)PLASTIC PIPE USING FLEXIBLE ELASTOMERIC SEALS 2.B.10. ASTM D3139. JOINTS FOR PLASTIC PRESSURE PIPE USING FLEXIBLE ELASTWERIC SEALS 2.B.11. ASTM D3261- BUTT HEAT FUSSION POLYETHYLENE(RE) PLASTIC FITTINGS FOR POLYETHYLENE PLASTIC PIPE AND TUBING 2.BA 2. ASTM F4I7- EIASTOMERIC SEALS GASKETS FOR JOINING PLASTIC PIPE 2B.13. ASTMIC GRAVITY SEWER ARDTESING LOW-PRESSURE DFOR RESSUREALUTION ACCEPTANCE OF PLASTIC GRAVITY SEWER LINES USING LOW-PRESSURE AIR. S.C. AMERICAN WATER WORKS ASSOCIATION (AWWA): 2 C.I. AWWAC111-RUBBER GASKET JOINTS FOR DUCTILE IRON PRESSURE PIPE AND FITTINGS 2.C2. AWWA Coca - DUCTILE -IRON WATER MAINSAND THEIR APPURTENANCES 2.03. AWWA C900- POLYVINYL CHLORIDE(PVC)PRESSURE PIPE, 4 IN. THROUGH 12 IN, FOR WATER DISTRIBUTION 2C4. AWWA Dan POLYETHYLENE(PE)PRESSURE PIPE, TUBING AND FITTINGS I2 INCH THROUGH 3INCHES, FOR WATER DISTRIBUTION 2.C5. AWWACEID6- POLYETHYLENE (RE) PRESSURE PIPE AND FITTINGS,4INCH THROUGH 631NCH, FOR WATER DISTRIBUTION 3. SUBMITTALS 3A. PROJECT RECORD DOCUMENTS: JA1. ACCURATELY RECORD ACTUAL LOCATIONS OF PIPE RUNS, CONNECTIONS CLEANDUTS, AND INVERT ELEVATIONS. 3 A 2. IDENTIFY AND DESCRIBE UNEXPECTED VARIATIONS TO SUBSOIL CONDITIONS AND LOCATION OF UNCHARTED UTILITIES. 4. PROJECT CONDITIONS 4A. COORDINATE WORK WITH TERMINATION OF SANITARY SEWER CONNECTION OUTSIDE BUILD NO AND CONNECTION TO MUNICIPAL SEWER UTILITY SERVICE. PART 2- PRODUCTS 1. SEWER PIPE, FITTINGS, AND JOINTS 1A. POLYVINYL CHLORIDE PIPE(PVC): ASIMU3034, RAIEUSUR35UNLESSOIMEKNI SPECIFIED BY THE UTILITY COMPANY. PIPE SHALL BE CONTINUALLY MARKED WITH MANUFACTURER'S NAME, PIPE SIZE, CELL CLASSIFICATION, SDR RATING, AND ASTM D 3034CLASSIFICATION. 1A1. PIPEJOINTS: INTEGRALLY MOLDED BELL ENDS, ASTM 03034, TABLE 2, WITH FACTORY SUPPLIED EIASTOM ERIC GASKETS AND LUBRICANT. 1B. VITRIFIED FAY PIPE (VCR) ASTMC700. USE ONLY IF REQUIRED BY LOCAL JURISDICTION. 1 B 1. FITTINGS'. ASTM C26U 1B.P. JOINTS: ASTMC425 1.B.3. GASKETS: ASTMG425. GASKETSSHALL BE MANUFACTURED FROM HIGH GRACE, PROPERLY VULCANIZED ELASTOMERIC COMPOUND CONSISTING OF EITHER BASIC NATURAL OR SYNTHETIC RUBBER. GASKET MANUFACTURING TOLERANCES SHALL COMPLY WITH RUBBER MANUFACTURER'S ASSOCIATION TOLERANCES FOR GASKETS. IBA LUBRICANT. SUITABLE FOR LUBRICATING JOINT COMPONENTS, NO DETERIORATING EFFECTS ON GASKET OR PIPE MATERIAL, WILL NOT SUPPORT GROWTH OF FUNGI OR BACTERIA, AND SHALL BE OF TYPE RECOMMENDED BY GASKET MANUFACTURER. 1.C. FORCE MAIN'. 1.C.1. HIGH -DENSITY POLYETHYLENE PIPE (HOPE)'. AWWA G901 AND C906, ASTM D3035, SON I I FOR 150 PSI PRESSURE RATING. 1C.1.1. FITTINGS: NO[ DFD, AWWA OAHU OR C906. 1C.12. JOINTS: BUTT FUSION, MTMD265I, FLANGED GASKET JOI HIS AT INTERFACE 1C2. POLYVINYL CHLORIDE PIPE (PVC) FOR LESS THAN 4 INCHES IN DIAMETER, ASTM D2241 FOR PUSHONOR SOLVENT WELD JOINTS. AND FOR PIPE 41NCHES IN DIAMETER AND LARGER, AWWA UOS CUSS 150 WITH PUSH ON JOINTS. 1.C2.1. JOINTVF171NGS: PUSHCN, ASTM D3139 WITH ASTM F47I GASKETS. 1 C22. SOLVENT CEMENT'. ASTM D2564. 1 C3. DUCTILE IRON PIPE (DIP) ASTNI CLASS 50, INSIDE NOMINAL DIAMETERAS SHOWN ON THE DRAWINGS, BELL AND SPIGOT ENO. 1C4. DUCTILE IRON PIPE JOINT DEVICE. AWWA C111, RUBBER GASKETMIINT DEVICES. 2. PIPEACCESSORIES 2A. PIPEJOINTS'. MECHANICAL CLAMP RING TYPE, STAINLESS STEEL EXPANDING AND CONTRACTING SLEEVE, NEOPRENERIBBEDGASKET FOR POSITIVE SEAL. 25. FITTINGS'. SAME MATERIAL AS PIPE MOLDED OR FORMED TO SUIT PIPE SIZE AND END DESIGN, IN REQUIRED TEE, BENDS ELBOWS, CLEANOUTS, REDUCERS, TRAPS, ETC. 3. CLEANOUTSANDIMANHOLES 3.A. MANHOLES SHALLCONFORM TO SECTION 02535. 33 LIDANDFRAME PROVIDE IN ACCORDANCE WITH SECTION 02536. PROVIOETRAFFIC GRADE AND RATED COVERS AND FRAMES WHERE CLEANOUTS AND MANHOLES ARE WITHIN PAVEMENT, WITH THE LETTERS'SSCO OR PUNITARY SEWER' RESPECTIVELY CAST INTO THE COVER. 3C. SHAFT CONSTRUCTION. CAST IRON SHARP OF INTERNAL DIAMETER AS SPECIFIED ON CONSTRUCTION DRAWINGS WITH 2600 PSI CONCRETE COLLAR FOR CLEANOUTS. 4. APPURTENANCES PA. TRACE WIRE: MAGNETIC DETECTABLE CONDUCTOR(i COPPER), BRIGHTLY COLORED PLASTIC COVERING, IMPRINTED WITH 'SANITARY SEWER SERVICE' IN LARGE LETTERS. 6 5 PART 3- EXECUTION 1. EXAMINATION 1A VERIFY THAT TRENCH CUT AND EXCAVATION IS READY TO RECEIVE WORK AND EXCAVATIONS, DIMENSIONS, AND ELEVATIONS ARE AS INDICATED ON CONSTRUCTION DRAWINGS. 2. PREPARATION 2A. HAND TRIM EXCAVATIONS TO REQUIRED ELEVATIONS. CORRECT OVER EXCAVATION WITH BEDDING MATERIAL. 23 REMOVE LARGE STONES OR OTHER HARD MATTER THAT COULD DAMAGE PIPE OR IMPEDE CONSISTENT BACKFILLING OR COMPACTION. 3. BEDDING 3.A. EXCAVATE TRENCH AND PLACE BEDDING MATERIAL IN ACCORDANCE WITH SECTION 02300, 4. INSTALLATION - PIPE 4A INSTALLTYPE AND CLASS OF PIPE AS SHOWN ON THE DRAWINGS. PIPESSHLLBEIAID AND MAINTAINED TO THE REQUIRED LINE AND GRADE WITH NECESSARY FITTINGS, BENDS, MANHOLE RISERS, CLEMENTS AND OTHER APPURTENANCES PLACED AT THE REQUIRED LOCATIONS. THE PIPE SHALL BE INSTALLED WITH UNIFORM BEARING UNDER THE FULL LENGTH OF THE BARREL OF THE PIPE. THE PIPE SHALL BE INSPECTED FOR DEFECTS AND CRACKS BEFORE BEING LOWERED INTO THE TRENCH. DEFECTIVE, DAMAGED OR UNSOUND PIPE, OR PIPE THAT HAS HAD ITS GRADE DISTURBED AFTER LAYING SHALL BETAKEN UP AND REPLACED. COMMENCE INSTALLATION AT LOWEST POINT WITH THE BILL CND UPGRADE, 4B. NO PIPE SHALL BE LAID IN WATER OR WHEN TRENCH CONDITIONS ARE UNSUITABLE FOR WORK, 4.C. PIPE CONNECTING TO MANHOLES OR OTHER STRUCTURES SHALL TERMINATE FLUSH INSIDE OF THE STRUCTURE WALL. 4A. JOINTS FOR PVC AN D CISP SHALL BE THOROUGHLY LUBRICATED WITH AN APPROVED LUBRICANT BEFORE PIPE SECTIONS ARE SLIPPED TOGETHER. OPEN ENDS SHALL BE FULLY PROTECTED WITH A STOPPER TO PREVENT EARTH OR OTHER MATERIAL FROM ENTERING THE PIPE DURING CONSTRUCTION. CAREFULLY FREE INTERIOR OF THE PIPE FROM DIRT, CEMENT AND OTHER DELETERIOUS MATERIAL AS THE WORK PROGRESSES. 4.E. MAINTAIN SEPARATION OF POTABLE WATER MAIN FROM SEWER PIPING AT CROSSINGSA MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL. 4F. INSTALL HOPE PIPING AND FITTINGS TO AWWA CAN AND CYD6. BUTT FUSION WELDED PER ASTM D3261. 4G. ROUTE PIPE IN STRAIGHT LINE PARPTLEL TO ROADS, BUILDINGS AND ADJACENT UTILITIES AND AS SHOWN ON THE DRAWINGS. 4IT ESTABLISH ELEVATIONS OF BURIED PIPING WITH SUFFICIENT COVER AS RECOMMENDED BY PIPE MANUFACTURER TO ENSURE NOT LESS THAN 3 FEET OF COVER. EXCEPT AS NOTED ON DRAWINGS. DAL FORM AND PLACE CONCRETE FOR THRUST BLOCKS AT EACH ELBOW OF PIPE FORCE MAIN. SEE CONSTRUCTION DRAWING FOR DETAILS OF CONSTRUCTION. 4A BACKFILL TRENCH IN ACCORDANCE WITH SECTION 02300. 4K INSTALL TRACE VINE CONTINUOUS OVER TOP OF NON-METAL PIPE. BURYBINCHES MINIMUM BELOW FINISH GRADE, ABOVE PIPELINE. 5. INSTALLATION - CLUNOUTS AND MANHOLES 5.A. FORM BOTTOM OF EXCAVATION CLEAN AND SMOOTH TO CORRECT ELEVATION. 5.8. FOR CLEANOLITS. FORM AND PLACE CAST I N PLACE CONCRETE BASE PAD WITH PROVISION FOR SANITARY SEWER PIPE TO BE INSTALLED TO PROPER ELEVATIONS. 5.0. FOR MANHOLES, CONSTRUCT INVERTS ACCORDING TO THE FOLLOWING GUIDELINES. 5.C.1. INVERT CHANNEL SHALL BE SMOOTH AND ACCURATELY SHAPED TOA SEMICIRCULAR BOTTOM TO MATCH WITH THE INSIDE OF THE ADJACENT SEWER SECTION. BC2 INVERT CHANNELS AND STRUCTURE BOTTOMS SHALL BE SHAPED WITH MORTAR AND LEAN CONCRETE. 5G3. CHANGES N SIZE AND GRADE OF INVERT SHALL BE MADE GRADUALLY AND EVENLY. 5.C4. CHANGES N THE D RECTIONOF THE SEWER ENTERING BRANCH CRBRANCHES SHA-L HAVE A TRUE CURVE OF AS LARGE A RADIUS AS THE MANHOLE WILL PERMIT. 5D. FOR MANHOLES, PROVIDE MANHOLE RINGS FRAME, AND COVER AS SHOWN ON THE CONSTRUCTION DRAWINGS. 6. FIELD QUALITY CONTROL 6.A. FIELD QUALITY CONTROL SHALL BE CONDUCTED BY THE CONTRACTOR IN ACCORDANCE WITH SECTION 01452. AD PIPES AND JOINTS SHALL NOT BE COMPLETELY BACKFILLED UNTIL AFTER INSPECTION, TESTING, AND APPROVAL BY THE OWNER AND LOCAL JURISDICTION. B.C. PRIOR TO TESTING FOR LEAKAGE, THE PIPE TRENCH SHALL BE BACKFILLED TO AT LEAST THE SPRING LINE OF THE PIPE. IF REQUIRED TO PREVENT PIPE MOVEMENT DURING TESTING, ADDITIONAL BACKFILL SHALL BE ADDED LEAVING THE PIPE JOINTS UNCOVERED TO PERMIT INSPECTION. 6D. EXFILTRATICN TEST 6D1. EACH SECTION OF SEWER LINE BETISEEK SUCCESSIVE MANHOLES SHALL BE TESTED BY CLOSING THE LOWER END OF -HE SEWER TO BE TESTED AND THE INLET SEWER OF THE UPPER MANHOLE, USING STOPPERS. 6D2. FILL THE MANHOLE AND PIPE WITH WATER TO A POINT WHICH PRODUCES MAXIMUM OF 3 FEET OF HEAD ABOVE THE INVERT OF THE SEWER AT THE CENTER OF THE UPPER MANHOLE: OR IF GROUNDWATER IS PRESENT, 3 FEET OF HEAD ABOVE THE AVERAGE ADJACENT GROUNDWATER LEVEL. KD3. THE ALLOWABLE LEAKAGE SHALL BE 200 GALIINCH OF PIPE DIAMETERMILEIDAY BE. INFILTRATION TEST 6E.1. IF EXCESSIVE GROUND WATER IS ENCOUNTERED IN THE CONSTRUCTION OF A SECTION OF THE SEWER, THE EXHUMATION TEST SHALL NOT BE USED. 6.E2. TH`_ UPPER AND LOWER ENDS OF THE SEWER TO BE TESTED SHALL BE CLOSED SUFFICIENTLY TO PREVENT THE ENTRANCE OF WATER. IE3. PUMPING OF GROUND WATER SHALL BE DISCONTINUED FOR AT LEAST 3 DAYS; THEN INFILTRATION SHALL BE TESTED. 6.E4. INFILTRATION INTO EACH SECTION OF SEWER BETWEEN ADJOINING MANHOLES SHALL NOT EXCEED THAT ALLOWED FOR THE EXHITTRATION TEST, EXCEPT THAT HEAD CONDITIONS SHALL BE A MAXIMUM OF 6 FEET. 6F. THE EXHIMATION TEST MAY BE LIMITED TO THE MANHOLES ONLY WH EN THE AUTHORITY HAVING JURISDICTION DOES NOT REQUIRE THE TEST AND THE CONSTRUCTION MANAGER WAIVES THE TEST. THE INFILTRATION TEST WILL ALWAYS BE REWIRED WHEN EXCESSIVE GROUNDWATER IS ENCOUNTERED IN ADOMON TO THE AIR TEST. BIG AIR TEST'. GRAVITY SYSTEMS SHALL BE AIR TESTED BETWEEN MANHOLES AT 35 PSI FOR 5 MINUTES PER ASTM F1417 FOR PLASTIC PIPES. 6IT ALL MANHOLES SHALL BE AIR TESTED IN ACCORDANCE WITH ASTM C1244-93 (STANDARD TEST METHOD FOR CONCRETE SEWER MANHOLES BY NEGATIVE AIR PRESSURE (VACUUM) TEST) B.I. DEFLECTION TEST. 6.1,1. DEFLECTION TESTS SHALL BE CONDUCTED ON ALL PLASTIC PIPE USING A MANDREL WITH A DIAMETER EQUAL TO 95 PERCENT OF THE INSIDE DIAMETER OF THE PIPE. THE IIRS I SHALL BE PERFORMED WI I MARC I MECHANICAL PULLING DEVICES. 6,12, ALLOWABLE DEFLECTION; MAXIMUM ALLOWABLE PIPE DEFLECTION SHALL NOT EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER. 61.3. MANDRIB MANORFI,GO/NOGO, DEVICE SHN I BE CYI INDRICAI IN SHAPE AND CONSTRUCTED WITH EITHER 9 OR 16 EVENLY SPACED ARMS OR PRONGS, MANDRELS WITH FEWER ARMS WILL BE REJECTED AS NOT SUFFICIENTLY ACCURATE. CONTACT LENGTH OF MANDREL'S ARMS SHALL EQUAL OR EXCEED NOMINAL INSIDE DIAMETER OF SEWER TO BE INSPECTED. CRITICALUMDREL DIMENSIONS SHALL CARRY TOLERANCE OF 0.01-INCH MAXIMUM. CONTRACTOR SHALL PROVIDE MANDREL AND NECESSARY EQUIPMENT FOR MANDREL TEST. 614. PROCEDURE'. MANDREL SHALL BE HAND -PULLED THROUGH FLEXIBLE PIPE SEWER LINES NO EARLIER THAN 30 DAYS AFTER TRENCH HAS BEEN COMPLETELY BACKFILLED. SECTIONS OF SEWER NOT PASSING MANDREL SHALL BE UNCOVERED AND REBEDOED, REBOUNDED, OR REPLACED TO SATISFACTION OF OWNER OR GOVERNING AGENCY. REPAIRED SECTION SMALL BE RETESTED. SL HYDROSTATICTEST. FORCE MAIN PIPING SHALL BE HYDROSTATICALLY TESTED AT 150 PSI IN ACCORDANCE WITH AMA C 600. BA PROVIDE MEASURING DEVICES METERS, WATER MATERIALS, AND LABOR FOR MAKING THE REQUIRED TESTS. AL. TESTS SMALL BE CONDUCTED IN THE PRESENCE OF THE CONSTRUCTION MANAGER OR HIS DESIGNEE. TEST DATA SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ENDOFSECTION 4 !i NOTE: THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 2 • Know what's below. Call before you dig wnnm mcmRo can 811 or 800-382-5544 24 xaun o Day, ] e A W4 PER Ii S HTE uw iRC a-1-20. EXCAVATE 0 tq N N o w C y > Q m H - O V Wpm N W� C J r U F--el W W Wz Z �Q ED I� m C 0) o. T N ZN U MEN DO U m z W i PE11300279 gY. STATE Or VA J w Q U Z_ Q 0 Z 0 ir w x 0 CO w 3 x 0 0 DO C900 W 18.0605