STORM SEWER SPECIFICATIONS
1. SCOPEOFWORK
1.A. THE WORK UNDER THIS SECTION INCLUDES ALL STORM SEWERS, STORM WATER INLETS, AND
RELATED ITEMS, INCLUDING EXCAVATING AND BACKFILLING, NECESSARY TO COMPLETE THE WORK
SHOWN ON THE DRAWINGS.
2. MATERIALS
2.A STORM SEWERS:
2.A.1. REINFORCED CONCRETE SEWER PIPE SHALLCONFORM TOASTM GI6 CLASSES LATEST REVISION
WITH JOINTS CONFORMING TO ASTM Cd 13 LATEST REVISION.
2A2 STORM SEWERS HANGER'HIQ' PIPE AND AM OR APPROVED EQUAL: WITH THE FOLLOWING
REQUIREMENTS:
2.A.2.a. 41NCH THROUGH 10 INCH MEETING AASHTO M252 TYPE S. 12 INCH THROUGH 361NCH MEETING
AASHTO M294 TYPE S.
2A.2.b. GASKETSMEETINGASTMD1056GRADE2N.
2A.2.c. FITTINGS MEETINGASSHTO M262 ORAASHTO M294, MEETING ASTM W350 CELL
CLASSIFICATION 324420C: OR ASTM D3350 TYPE III, CLASS C, CATEGORY4, GRADE P33.
2.8. DRAINAGESTRUCTURES:
2.B.1. PRECAST REINFORCED CONCRETE DRAINAGE SECTIONS AND STEPS SHALL CONFORM TO ASTM
C478 LATEST REVISION AND LATEST REVISION OF INGOT PRECAST STRUCTURE DETAILS.
2.B.2. CASTINGS SHALL BE OF UNIFORM QUALITY FREE FROM BLOW HOLES POROSITY HARD SPOTS
SHRINKAGE DISTORTION OR OTHER DEFECTS, THEY SHALL BE SMOOTH AND WELL CLEANED BY
SHOT BLASTING OR BY SOME OTHER APPROVED METHOD. THEY SHALL BE COATED WITH
ASPHALT PAINT WHICH SHALL RESULT IN A SMOOTH COATING. TOUGH AND TENACIOUS WHEN
COLD, NOTTACKY OR BRI ET.E. THEY SHALL BE GRAY IRON MEETING ASTM A-48 LATEST
REVISION.
23.3. JOINTS- STRUCTURE SECTIONS SHALL BE JOINTED WITH RUBBER TYPE GASKETS, THE RUBBER
TYPE GASKETS SHALL MEET ASTM G443 LATEST REVISION.
2Q. SUBDRAINS:
2.C.1. PERFORATED PLASTIC PIPE SUBDRAINESHALL CONFORM TOASTM W034, SDR35, ASTM D2729,
OR ASTM F405.
3. APPLICATION
3A PERMIESANDCODES: THEINTEWOFTHISSECTIONOFTHESPECIFICATIONSISTHATTHE
CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE DRAWINGS AND
SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL, APPLICABLE CODES AN
REGULATIONSAS AMENDED BYANY WAIVERS. CONTRACTOR SHALL FURNISH ALL BONDS
NECESSARY TO GET PERMITS FOR CUTS AND CONNECTIONS TO EXISTING SEWERS.
3AL LOCAL STANDARDS: THE TERM 'LOCAL STANDARDS' AS USED HEREIN MEANS THE STANDARDS OF
DESIGN AND CONSTRUCTION OF THE RESPECTIVE MUNICIPAL DEPARTMENT AND/OR UTILITY
COMPANY.
D.C. EASTNGIMPROVEMENTS: MAINTAININOPERATINGCONDITIONALLACTIWUTILITIES,SEWERS
AND OTHER DRAINS ENCOUNTERED IN THE SEWER INSTALLATION. REPAIR TO THE SATISFACTION
OF THE OWNER ANY DAMAGE TO EXISTING ACTIVE IMPROVEMENTS.
DO. WORKMANSHIP: TO CONFORM TOALL LOCAL, STATE AND NATIONAL CODES AND TO BE APPROVED
SMALL LOCAL AND STATE AGENCIES HAVING JURISDICTION.
3.E. TRENCHING: LAYALLRPEINOPENTRENCHES,EXCEPTWHENTHELOCALAUTHORIWGIW
WRITTEN PERMISSION FOR TUNNELING. OPEN THE TRENCH SUFFICIENTLY AHEAD OF PIPE LAYING
TO REVEAL ANY OBSTRUCTIONS. THE WIDTH OF THE TRENCH SHALL BE THE INSIDE PIPE DIAMETER
PLUS Z4INCHES FOR 121NCHES ABOVE THE PIPE. SHEET AND BRACE TRENCH AS NECESSARY TO
PROTECT WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING TO COMPLY WITH
OCCUPATIONAL SAFETYAND HE LTH ADMINISTRATION STANDARDS. KEEP TRENCHES FREE FROM
WATER WHILE CONSTRUCTION IS IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR
APPURTENANCES IN STANDING WATER. CONDUCT THE DISCHARGE FORM TRENCH DEWATERING TO
DRAINS OR NATURAL DRAINAGE CHANNELS.
BY. SPECIALSUPPORTS: WHENEVER, IN THE OPINION OF THE ENGINEER, THE SOIL ATM BELOW THE
PIPE GRADE IS UNSUITABLE FOR SUPPORTING SEWERS AND APPURTENANCES SPECIFIED IN THIS
SECTION, SUCH SPECIAL SUPPORT, IN ADDITION THOSE SHOWN OR SPECIFIED, SHALL BE PROVIDED
AS THE ENGINEER MAY DIRECT, AND THE CONTRACT WILL BE ADJUSTED.
D.E. BACKFILLING
3.GA, RCP BACKBITING: FOR DEPTH OF AT LEAST 121NGHESABOW THE TOP OF THE PIPE,BACKFILL
WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROCK FRAGMENTS, ROOTS
OR SOD. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE. FOR THE
REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR MATERIAL CONTAINING
STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER WALKS, PARKING AREAS,
DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY THOROUGHLY COMPACTED BY
APPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5 FEET OF PAVED ROADWAYS
SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANUTAR MATERIALS.
3.G.2. HOPE BACKFILLING FOR DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE,BACKFILL
WITH GRANULAR MATERIAL. COMPACT THIS BACKFILL THOROUGHLY TAKING CARE NOT TO
DISTURB THE PIPE. FOR THE REMAINING TRENCH DEPTH, BACKFILL WITH EARTH OR GRANULAR
MATERIAL CONTAINING STONES OR ROCKS NOT LARGER THAN 4 INCHES. BACKFILL UNDER
WALKS, PARKING AREAS, DRIVEWAYS AND STREETS SHALL BE GRANULAR MATERIAL ONLY
THOROUGHLY COMPACTED BYAPPROVED METHODS. TRENCHES PARALLEL TO AND WITHIN 5
FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH COMPACTED GRANULAR
MATERIALS.
S.H. SUBDRAINS: ALLSUBDRAINS ON SITE SHALL BE OF THE SIZE ASSHOWNAND SHALL BE PLACEDAS
SHOWN ON THE PLANS. THEY SHALL BE CONSTRUCTED TO THE GRADES AS SHOWN ON THE PLAINS.
3.1. UTILITIES: ITSHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TOVERIFYALL EXISTING
UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK IT SHALL ALSO, BE THE
CONTRACTORS RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES BEFORE
WORK IS STARTED. THE CONTRACTOR SHALL NOTIFY IN WRITING THE OWNERS OR THE ENGINEER
OF ANY CHANGES, ERRORS OR OMISSIONS FOUND ON THESE PLANS OR IN THE FIELD BEFORE
WORK IS STARTED OR RESUMED.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City
DDf Cabeed (\��
�VT�Ut�O*tiYWML
DATE: 06/17/19
9
WATER LINE SPECIFICATIONS
1. SCOPE OF WORK
1A. THE WORK REOJI RED UNDER FIT S SECTION INCLUDED ALL COLD WATER DISTRIBUTION
LINES. VALVES, N3ER PITS, HYDRANTS, AND RELATED ITEMS INCLUDING EXCAVATING AND
BACKFILLING NECESSARY TO COMPLETE THE WORK SHOWN ON THE DRAWINGS. THE END
OF WATER SERVICE LINES SHALL BE TIGHTLY PLUGGED OR CAPPED AT THE TERMINAL
POINTS PENDING THE CONNECTING TO ALL SUCH LINES OF THE BUILDING PIPING AS
SPECIFIED IN THE PLUMBING SPECIFICATIONS AND ARCHITECTURAL DRAWINGS.
2. MATERIALS
2A. DUCTILEIRONPIPE: DUCTILE IRON PIPE SHALL MEET AWWA C-150 AND G151
SPECIFICATIONS. PIPE SHALL BE CEMENT LINED PER AWWA C 104.
2S COPPERTUBING'. SHALL BE SEAMLESS. ANNEALED COPPER TUBING COMPLYING WITH
FEDERAL SPECIFICATION SAN 799. FITTINGS SHALL BE WROUGHT COPPER OR CAST
BRONZE WITH SOLDER JOINTS. SOLDER SHALL BE OF A COMPOSITION RECOMMENDED BY
THE MANUFACTURER OF THE FITTINGS.
2.C. FIREHYORANTS. SHALL COMPLY WITH AWWA SPECIFICATION G502 AND SHALL MEET
LOCAL STANDARDS AND REQUIREMENTS, PARTICULARLY AS TO NOZZLE DIAMETERS AND
THREADS, DIRECTION OF OPENING AND DIMENSIONS OF OPERATING AND CAP NUTS. FIRE
HYDRANTS SHALL HAVE ONE PUMPER AND TWO HOSE NOZZLES. A VALVE OPENING NOT
LESS THAN 51NCHES ME A6INCH INLET CONNECTION. THE LENGTH OF THE HYDRANT
BARRFI SHAI I BE DETERMINED BY THE SPECIFIED DEPTH OF COVER OVER THE PIPE.
2.0, VALVES: ALL VALVES AND STOPS SHALL HAVE ENDS SUITED OR ADAPTERS SHALL BE
PROVIDED FOR THE PROPER INSTALLATION IN THE LINES IN WHICH THEY ARE LOCATED.
VALVES SI ALL MEET LOCAL STANDARDS OR IN TI IE ABSENCE OF SUCI I STANDARDS. TIE
FOLLOWING REQUIREMENTS.
2A.1, VALVES IN CAST IRON PIPE SHALL BE IRON BODY, BRONZE MOUNTED, DISC GATE
VALVES CONFORMING TOAW WA SPECIFICATION G500. THEY SHALL OPEN IN THE SAME
DIRECTION AS THOSE USED IN THE LOCAL WATERWORKS SYSTEM VALVE STEMS SHALL
TERMINATE IN 21NCH WRENCH NUTS. FURNISH TWO (2) KEYS.
2D2. VALVES IN COPPER PIPE SHALL BE STANDARD BRASS BODY,ROUND-WAY,GROUND-KEY
STOPS, WITH T HEADS. FURNISH TWO (2) KEYS.
2.E. VALVE BOXES: SHALL MEE I LOCAL S I ANUARDS OR IN I H E ABSENCE OF SUCH SMALL
COMPLY WITH THE FOLLOWING REQUIREMENTS:
211. FOR IRON BODY VALVES, BOXES SHALL BE APPROVED STANDARD BUFFAL0.TYPE CAST
IRON, ADJUSTABLE SHAFT BOXES, HAVING A MINIMUM SHAFT DIAMETER OF 5-1/4
INCHES.
2S2 2 FOR BRASS BODY VALVES (STOPS) BOXES SHALL BE APPROVED STANDARD CAST
IRON EXTENSION SERVICE BOXES, HAVING A MINIMUM DIAMETER OF 2-1/2INCHES AND
HAVING LID HELD IN PUCE BY A BRASS OR BRONZE BOLT. THE CASTINGS SHALL BE
COATED WITH TWO COATS OF COAL -TAR PITCH VARNISH. FURNISH TWO (2) KEYS FOR
BOLT IN LIDS.
3. APPLICATIONS.
3A. PERMITSANDCODES: THE INTENT OF THIS SECTION OF THE SPECIFICATIONS IS THAT THE
CONTRACTOR'S BID ON THE WORK COVERED HEREIN SHALL BE BASED UPON THE
DRAWINGS AND SPECIFICATIONS BUT THAT THE WORK SHALL COMPLY WITH ALL
APPLICABLE CODES AND REGULATIONS. CONTRACTOR SHALL FURNISH ALL NECESSARY
BONDS TO GET PERMITS FOR CUTS AND CONNECTIONS.
3.B. EXISTING IMPROVEMENTS: MAINTAIN IN OPERATING CONDITION ALL ACTIVE UTILITIES AND
SEWERS AND OTHER PIPE SYSTEM THAT MAY BE ENCOUNTERED.
&C. TRENCHING: LAY ALL PIPE IN OPEN TRENCHES, EXCEPT WHEN LOCAL AUTHORITY GIVES
WRITTEN PERMISSION FOR TUNNELING. PROVIDE SEPARATE TRENCH FOR THE WATERLINE
AT LEAST 10 FEET HORIZONTALLY FROM ANY SANITARY SEWER. IN LOCATIONS WHERE
SEPARATE TRENCHES FOR SEWER AND WATER LINES ARE IMPRACTICABLE, LAYTHE
WATER PIPE ON A SOLD SHELF AT LEAST 18INCHES ABOVE THE TOP OF THE SEWER,
3.D. WIDTHOFTRENCH: EXCAVATE TRENCHES 12 INCHES EACH SIDE OF THE PIPE FOR
PROPER INSTALLATION OF PIPE.
3E. SHEETING AND BRACING: SHEET AND BRACE TRENCHES AS NECESSARY TO PROTECT
WORKMEN AND ADJACENT STRUCTURES. ALL TRENCHING SHALL COMPLY WITH THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARDS.
3F. WATERREMOVAL. KEEP TRENCHES FREE FROM WATER WHILE CONSTRUCTION THEREIN IS
IN PROGRESS. UNDER NO CIRCUMSTANCES LAY PIPE OR APPURTENANCES IN STANDING
WATER. CONDUCTTHE DISCHARGE FROM TRENCH DEWATERING TO DRAINS, OR NATURAL
DRAINAGE CHANNELS.
3.13. GRADING TRENCH BOTTOMS'. THE BOTTOM QUADRANT OF THE PIPE SHALL BE FULLY AND
UNIFORMLY SUPPORTED. THE FULL LOAD SHALL REST ON THE BARREL OF THE PIPE. THE
TRENCH MAY BE EXCAVATED TO A DEPTH OF 41NCHES OR MORE BELOW FINAL GRADE
WITH SAND, CRUSHED STONE OR GRAVEL BACKFILL TO BRING IT BACK TO PIPE TRYING
GRADE. FOR A DEPTH OF AT LEAST 12 INCHES ABOVE THE TOP OF THE PIPE BACKFILL
WITH EARTH OR GRANULAR MATERIAL FREE FROM LARGE STONES, ROOTS OR FROZEN
CLOGS. TAMP THIS BACKFILL THOROUGHLY TAKING CARE NOT TO DISTURB THE PIPE.
BACKFILL UNDER WALKS, PARKING AREAS ORIVEWIAYS AND STREETS WITH GRANULAR
MATERIAL ONLY AND TAMP THOROUGHLY, BY APPROVED METHODS. TRENCHES PARALLEL
TO AND WITHIN 10 FEET OF PAVED ROADWAYS SHALL ALSO BE CONSTRUCTED WITH
COMPACTED GRANULAR MATERIAL.
BE. TESTS: BEFORE JOINTS ME COVERED, FILL THE PIPING WITH WATER, OPENING HYDRANTS
OR OTHER OUTLETS TO EXPELAIR. TEST THE PIPING FOR LEAKAGE AS REQUIRED BY THE
LOCAL UTILITY. INSPECT ALL JOINTS FOR LEAKAGE AND REMEDY ANY LEAKS. UPON
COMPLETION OF THE WATER LINES, FLUSH OUT THE SYSTEM UNTIL THE WATER RUNS
CLEAR. AS SOON AS THE SYSTEM HAS BEEN FLUSHED OUT, IT SHALL BE STERILIZED IN
ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL UTILITY.
31 IF A HORIZONTAL DISTANCE OF IO FEET CANNOT BE MAI NTAINED BETWEEN THE WATER
LINE AND THE SANITARY SEWER LINE, THE SEWER MUST BE CONSTRUCTED OF WATER
WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS WITHIN 1C OF EITHER SIDE
THE WATER LINE.
3J. UTILITIES: IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO VERIFY ALL
EXISTING UTILITIES AND CONDITIONS PERTAINING TO HIS PHASE OF THE WORK. IT SHALL
ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE
VARIOUS UTILITIES BEFORE WORK 15 STARTED. THE CONTRACTOR SHALL NOTIFY IN
WRITING THE OWNERS OR THE ENGINEER OF ANY CHANGES, ERRORS OR OMISSIONS
FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED.
3K NEW WATERLINE CONSTRUCTION: CONTRACTORTO RECORD DIMENSION OF EACH
WATER STUB AND VALVES FROM NEAREST FIRE HYDRANT MEASURED ALONG WATER MAIN.
THE LOCATIONS OF HYDRANTS AND WATER VALVES, ALONG WITH ANY OTHER
CONSTRUCTION CHANGES ARE TO BE INCORPORATED ON THE ORIGINAL CONSTRUCTION
DRAWINGS AND 'RECORD DRAWING' PRINTS SHALL BE SUBMITTED TO THE LOCAL UTILITY
AS SOON AFTER COMPLETION OF CONSTRUCTION AS POSSIBLE.
8
SANITARY SEWAGE SPECIFICATIONS
1. SUMMARY
1A, BECTON INCLUDES:
1A1. SANITARY SEWER DRAINAGE PIPING,FITTINGS, ACCESSORIES, CLEANOUTS, AND
BEDDING.
1A2 CONNECTION OF SITE SANITARY SEWER SYSTEM TO MUNICIPAL SANITARY SEWER
SYSTEMS.
1.B. RELATED REQUIREMENTS:
1A1. SECTION023M EARTHWORM TRENCHING, BACKFILL, AND COMPACTION FOR
UTILITIES
1A.2, SECTION02536- SEWER MANI TOLES. FRAMES. AND COVERS
1A3. SECTIONW310- CAST -INTIACE STRUCTURAL CONCRETE
2. REFERENCES
2A. THE PUBLICATIONS LISTED BELOW FORM A PART OF THIS SPECIFICATION TO THE EXTENT
REFERENCED. PUBLICATIONS ARE REFERENCED WITHIN THE TEXT BY THE BASIC
DESIGNATION ONLY.
23. ASTM INTERNATIONAL (ARTS).
2,B.1. ASTM A74- CAST IRON SOIL PIPE AND FITTINGS
2.B2 ASTM A746- DUCTILE IRON GRAVITY SEWER PIPE
2.13.3. AS I C425- COMPRESSION JOIN I S FOR VI I RIFIEU CLAY PIPE AND HI I INGS
2B4. ASTM C564- RUBBER GASKETS FOR CAST IRON SOIL PIPE AND FITTINGS
2 8.5. ASTM C700- VITRIFIED CLAY PIPE EXTRA STRENGTH, STANDARD STRENGTH, AND
PERFORATED
2B.6. ASTMD2241- POLY( VINYL CHLORIDE) (PVC)PRESSURE -RATED PIPE(SDR SERIES)
2.B7 ASTMD2657 HFATJOINING POLYOLEFIN PIPE AND FITTING5
2.B.8. ASTM D3034 - TYPE PSM POLY (VINYL CHLORIDE)( PVC) SEWER PIPE AND FITTINGS
213.9. ASTMD3035- POLYETHYLENE (PE)PLASTIC PIPE USING FLEXIBLE ELASTOMERIC
SEALS
2.B.10. ASTM D3139. JOINTS FOR PLASTIC PRESSURE PIPE USING FLEXIBLE ELASTWERIC
SEALS
2.B.11. ASTM D3261- BUTT HEAT FUSSION POLYETHYLENE(RE) PLASTIC FITTINGS FOR
POLYETHYLENE PLASTIC PIPE AND TUBING
2.BA 2. ASTM F4I7- EIASTOMERIC SEALS GASKETS FOR JOINING PLASTIC PIPE
2B.13. ASTMIC GRAVITY
SEWER ARDTESING LOW-PRESSURE
DFOR RESSUREALUTION ACCEPTANCE OF
PLASTIC GRAVITY SEWER LINES USING LOW-PRESSURE AIR.
S.C. AMERICAN WATER WORKS ASSOCIATION (AWWA):
2 C.I. AWWAC111-RUBBER GASKET JOINTS FOR DUCTILE IRON PRESSURE PIPE AND
FITTINGS
2.C2. AWWA Coca - DUCTILE -IRON WATER MAINSAND THEIR APPURTENANCES
2.03. AWWA C900- POLYVINYL CHLORIDE(PVC)PRESSURE PIPE, 4 IN. THROUGH 12 IN, FOR
WATER DISTRIBUTION
2C4. AWWA Dan POLYETHYLENE(PE)PRESSURE PIPE, TUBING AND FITTINGS I2
INCH THROUGH 3INCHES, FOR WATER DISTRIBUTION
2.C5. AWWACEID6- POLYETHYLENE (RE) PRESSURE PIPE AND FITTINGS,4INCH THROUGH
631NCH, FOR WATER DISTRIBUTION
3. SUBMITTALS
3A. PROJECT RECORD DOCUMENTS:
JA1. ACCURATELY RECORD ACTUAL LOCATIONS OF PIPE RUNS, CONNECTIONS
CLEANDUTS, AND INVERT ELEVATIONS.
3 A 2. IDENTIFY AND DESCRIBE UNEXPECTED VARIATIONS TO SUBSOIL CONDITIONS AND
LOCATION OF UNCHARTED UTILITIES.
4. PROJECT CONDITIONS
4A. COORDINATE WORK WITH TERMINATION OF SANITARY SEWER CONNECTION OUTSIDE
BUILD NO AND CONNECTION TO MUNICIPAL SEWER UTILITY SERVICE.
PART 2- PRODUCTS
1. SEWER PIPE, FITTINGS, AND JOINTS
1A. POLYVINYL CHLORIDE PIPE(PVC): ASIMU3034, RAIEUSUR35UNLESSOIMEKNI
SPECIFIED BY THE UTILITY COMPANY. PIPE SHALL BE CONTINUALLY MARKED WITH
MANUFACTURER'S NAME, PIPE SIZE, CELL CLASSIFICATION, SDR RATING, AND ASTM D
3034CLASSIFICATION.
1A1. PIPEJOINTS: INTEGRALLY MOLDED BELL ENDS, ASTM 03034, TABLE 2, WITH
FACTORY SUPPLIED EIASTOM ERIC GASKETS AND LUBRICANT.
1B. VITRIFIED FAY PIPE (VCR) ASTMC700. USE ONLY IF REQUIRED BY LOCAL JURISDICTION.
1 B 1. FITTINGS'. ASTM C26U
1B.P. JOINTS: ASTMC425
1.B.3. GASKETS: ASTMG425. GASKETSSHALL BE MANUFACTURED FROM HIGH GRACE,
PROPERLY VULCANIZED ELASTOMERIC COMPOUND CONSISTING OF EITHER BASIC
NATURAL OR SYNTHETIC RUBBER. GASKET MANUFACTURING TOLERANCES SHALL
COMPLY WITH RUBBER MANUFACTURER'S ASSOCIATION TOLERANCES FOR
GASKETS.
IBA LUBRICANT. SUITABLE FOR LUBRICATING JOINT COMPONENTS, NO DETERIORATING
EFFECTS ON GASKET OR PIPE MATERIAL, WILL NOT SUPPORT GROWTH OF FUNGI OR
BACTERIA, AND SHALL BE OF TYPE RECOMMENDED BY GASKET MANUFACTURER.
1.C. FORCE MAIN'.
1.C.1. HIGH -DENSITY POLYETHYLENE PIPE (HOPE)'. AWWA G901 AND C906, ASTM D3035, SON
I I FOR 150 PSI PRESSURE RATING.
1C.1.1. FITTINGS: NO[ DFD, AWWA OAHU OR C906.
1C.12. JOINTS: BUTT FUSION, MTMD265I, FLANGED GASKET JOI HIS AT INTERFACE
1C2. POLYVINYL CHLORIDE PIPE (PVC) FOR LESS THAN 4 INCHES IN DIAMETER, ASTM
D2241 FOR PUSHONOR SOLVENT WELD JOINTS. AND FOR PIPE 41NCHES IN
DIAMETER AND LARGER, AWWA UOS CUSS 150 WITH PUSH ON JOINTS.
1.C2.1. JOINTVF171NGS: PUSHCN, ASTM D3139 WITH ASTM F47I GASKETS.
1 C22. SOLVENT CEMENT'. ASTM D2564.
1 C3. DUCTILE IRON PIPE (DIP) ASTNI CLASS 50, INSIDE NOMINAL DIAMETERAS
SHOWN ON THE DRAWINGS, BELL AND SPIGOT ENO.
1C4. DUCTILE IRON PIPE JOINT DEVICE. AWWA C111, RUBBER GASKETMIINT DEVICES.
2. PIPEACCESSORIES
2A. PIPEJOINTS'. MECHANICAL CLAMP RING TYPE, STAINLESS STEEL EXPANDING AND
CONTRACTING SLEEVE, NEOPRENERIBBEDGASKET FOR POSITIVE SEAL.
25. FITTINGS'. SAME MATERIAL AS PIPE MOLDED OR FORMED TO SUIT PIPE SIZE AND END
DESIGN, IN REQUIRED TEE, BENDS ELBOWS, CLEANOUTS, REDUCERS, TRAPS, ETC.
3. CLEANOUTSANDIMANHOLES
3.A. MANHOLES SHALLCONFORM TO SECTION 02535.
33 LIDANDFRAME PROVIDE IN ACCORDANCE WITH SECTION 02536. PROVIOETRAFFIC
GRADE AND RATED COVERS AND FRAMES WHERE CLEANOUTS AND MANHOLES ARE
WITHIN PAVEMENT, WITH THE LETTERS'SSCO OR PUNITARY SEWER' RESPECTIVELY
CAST INTO THE COVER.
3C. SHAFT CONSTRUCTION. CAST IRON SHARP OF INTERNAL DIAMETER AS SPECIFIED ON
CONSTRUCTION DRAWINGS WITH 2600 PSI CONCRETE COLLAR FOR CLEANOUTS.
4. APPURTENANCES
PA. TRACE WIRE: MAGNETIC DETECTABLE CONDUCTOR(i COPPER), BRIGHTLY COLORED
PLASTIC COVERING, IMPRINTED WITH 'SANITARY SEWER SERVICE' IN LARGE LETTERS.
6
5
PART 3- EXECUTION
1. EXAMINATION
1A VERIFY THAT TRENCH CUT AND EXCAVATION IS READY TO RECEIVE WORK AND
EXCAVATIONS, DIMENSIONS, AND ELEVATIONS ARE AS INDICATED ON CONSTRUCTION
DRAWINGS.
2. PREPARATION
2A. HAND TRIM EXCAVATIONS TO REQUIRED ELEVATIONS. CORRECT OVER EXCAVATION
WITH BEDDING MATERIAL.
23 REMOVE LARGE STONES OR OTHER HARD MATTER THAT COULD DAMAGE PIPE OR
IMPEDE CONSISTENT BACKFILLING OR COMPACTION.
3. BEDDING
3.A. EXCAVATE TRENCH AND PLACE BEDDING MATERIAL IN ACCORDANCE WITH SECTION
02300,
4. INSTALLATION - PIPE
4A INSTALLTYPE AND CLASS OF PIPE AS SHOWN ON THE DRAWINGS. PIPESSHLLBEIAID
AND MAINTAINED TO THE REQUIRED LINE AND GRADE WITH NECESSARY FITTINGS,
BENDS, MANHOLE RISERS, CLEMENTS AND OTHER APPURTENANCES PLACED AT THE
REQUIRED LOCATIONS. THE PIPE SHALL BE INSTALLED WITH UNIFORM BEARING UNDER
THE FULL LENGTH OF THE BARREL OF THE PIPE. THE PIPE SHALL BE INSPECTED FOR
DEFECTS AND CRACKS BEFORE BEING LOWERED INTO THE TRENCH. DEFECTIVE,
DAMAGED OR UNSOUND PIPE, OR PIPE THAT HAS HAD ITS GRADE DISTURBED AFTER
LAYING SHALL BETAKEN UP AND REPLACED. COMMENCE INSTALLATION AT LOWEST
POINT WITH THE BILL CND UPGRADE,
4B. NO PIPE SHALL BE LAID IN WATER OR WHEN TRENCH CONDITIONS ARE UNSUITABLE FOR
WORK,
4.C. PIPE CONNECTING TO MANHOLES OR OTHER STRUCTURES SHALL TERMINATE FLUSH
INSIDE OF THE STRUCTURE WALL.
4A. JOINTS FOR PVC AN D CISP SHALL BE THOROUGHLY LUBRICATED WITH AN APPROVED
LUBRICANT BEFORE PIPE SECTIONS ARE SLIPPED TOGETHER. OPEN ENDS SHALL BE
FULLY PROTECTED WITH A STOPPER TO PREVENT EARTH OR OTHER MATERIAL FROM
ENTERING THE PIPE DURING CONSTRUCTION. CAREFULLY FREE INTERIOR OF THE PIPE
FROM DIRT, CEMENT AND OTHER DELETERIOUS MATERIAL AS THE WORK PROGRESSES.
4.E. MAINTAIN SEPARATION OF POTABLE WATER MAIN FROM SEWER PIPING AT CROSSINGSA
MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL.
4F. INSTALL HOPE PIPING AND FITTINGS TO AWWA CAN AND CYD6. BUTT FUSION WELDED
PER ASTM D3261.
4G. ROUTE PIPE IN STRAIGHT LINE PARPTLEL TO ROADS, BUILDINGS AND ADJACENT UTILITIES
AND AS SHOWN ON THE DRAWINGS.
4IT ESTABLISH ELEVATIONS OF BURIED PIPING WITH SUFFICIENT COVER AS RECOMMENDED
BY PIPE MANUFACTURER TO ENSURE NOT LESS THAN 3 FEET OF COVER. EXCEPT AS
NOTED ON DRAWINGS.
DAL FORM AND PLACE CONCRETE FOR THRUST BLOCKS AT EACH ELBOW OF PIPE FORCE
MAIN. SEE CONSTRUCTION DRAWING FOR DETAILS OF CONSTRUCTION.
4A BACKFILL TRENCH IN ACCORDANCE WITH SECTION 02300.
4K INSTALL TRACE VINE CONTINUOUS OVER TOP OF NON-METAL PIPE. BURYBINCHES
MINIMUM BELOW FINISH GRADE, ABOVE PIPELINE.
5. INSTALLATION - CLUNOUTS AND MANHOLES
5.A. FORM BOTTOM OF EXCAVATION CLEAN AND SMOOTH TO CORRECT ELEVATION.
5.8. FOR CLEANOLITS. FORM AND PLACE CAST I N PLACE CONCRETE BASE PAD WITH
PROVISION FOR SANITARY SEWER PIPE TO BE INSTALLED TO PROPER ELEVATIONS.
5.0. FOR MANHOLES, CONSTRUCT INVERTS ACCORDING TO THE FOLLOWING GUIDELINES.
5.C.1. INVERT CHANNEL SHALL BE SMOOTH AND ACCURATELY SHAPED TOA
SEMICIRCULAR BOTTOM TO MATCH WITH THE INSIDE OF THE ADJACENT SEWER
SECTION.
BC2 INVERT CHANNELS AND STRUCTURE BOTTOMS SHALL BE SHAPED WITH MORTAR
AND LEAN CONCRETE.
5G3. CHANGES N SIZE AND GRADE OF INVERT SHALL BE MADE GRADUALLY AND EVENLY.
5.C4. CHANGES N THE D RECTIONOF THE SEWER ENTERING BRANCH CRBRANCHES
SHA-L HAVE A TRUE CURVE OF AS LARGE A RADIUS AS THE MANHOLE WILL PERMIT.
5D. FOR MANHOLES, PROVIDE MANHOLE RINGS FRAME, AND COVER AS SHOWN ON THE
CONSTRUCTION DRAWINGS.
6. FIELD QUALITY CONTROL
6.A. FIELD QUALITY CONTROL SHALL BE CONDUCTED BY THE CONTRACTOR IN ACCORDANCE
WITH SECTION 01452.
AD PIPES AND JOINTS SHALL NOT BE COMPLETELY BACKFILLED UNTIL AFTER INSPECTION,
TESTING, AND APPROVAL BY THE OWNER AND LOCAL JURISDICTION.
B.C. PRIOR TO TESTING FOR LEAKAGE, THE PIPE TRENCH SHALL BE BACKFILLED TO AT LEAST
THE SPRING LINE OF THE PIPE. IF REQUIRED TO PREVENT PIPE MOVEMENT DURING
TESTING, ADDITIONAL BACKFILL SHALL BE ADDED LEAVING THE PIPE JOINTS UNCOVERED
TO PERMIT INSPECTION.
6D. EXFILTRATICN TEST
6D1. EACH SECTION OF SEWER LINE BETISEEK SUCCESSIVE MANHOLES SHALL BE
TESTED BY CLOSING THE LOWER END OF -HE SEWER TO BE TESTED AND THE INLET
SEWER OF THE UPPER MANHOLE, USING STOPPERS.
6D2. FILL THE MANHOLE AND PIPE WITH WATER TO A POINT WHICH PRODUCES
MAXIMUM OF 3 FEET OF HEAD ABOVE THE INVERT OF THE SEWER AT THE CENTER OF
THE UPPER MANHOLE: OR IF GROUNDWATER IS PRESENT, 3 FEET OF HEAD ABOVE
THE AVERAGE ADJACENT GROUNDWATER LEVEL.
KD3. THE ALLOWABLE LEAKAGE SHALL BE 200 GALIINCH OF PIPE DIAMETERMILEIDAY
BE. INFILTRATION TEST
6E.1. IF EXCESSIVE GROUND WATER IS ENCOUNTERED IN THE CONSTRUCTION OF A
SECTION OF THE SEWER, THE EXHUMATION TEST SHALL NOT BE USED.
6.E2. TH`_ UPPER AND LOWER ENDS OF THE SEWER TO BE TESTED SHALL BE CLOSED
SUFFICIENTLY TO PREVENT THE ENTRANCE OF WATER.
IE3. PUMPING OF GROUND WATER SHALL BE DISCONTINUED FOR AT LEAST 3 DAYS; THEN
INFILTRATION SHALL BE TESTED.
6.E4. INFILTRATION INTO EACH SECTION OF SEWER BETWEEN ADJOINING MANHOLES
SHALL NOT EXCEED THAT ALLOWED FOR THE EXHITTRATION TEST, EXCEPT THAT
HEAD CONDITIONS SHALL BE A MAXIMUM OF 6 FEET.
6F. THE EXHIMATION TEST MAY BE LIMITED TO THE MANHOLES ONLY WH EN THE
AUTHORITY HAVING JURISDICTION DOES NOT REQUIRE THE TEST AND THE
CONSTRUCTION MANAGER WAIVES THE TEST. THE INFILTRATION TEST WILL ALWAYS BE
REWIRED WHEN EXCESSIVE GROUNDWATER IS ENCOUNTERED IN ADOMON TO THE AIR
TEST.
BIG AIR TEST'. GRAVITY SYSTEMS SHALL BE AIR TESTED BETWEEN MANHOLES AT 35 PSI FOR
5 MINUTES PER ASTM F1417 FOR PLASTIC PIPES.
6IT ALL MANHOLES SHALL BE AIR TESTED IN ACCORDANCE WITH ASTM C1244-93 (STANDARD
TEST METHOD FOR CONCRETE SEWER MANHOLES BY NEGATIVE AIR PRESSURE
(VACUUM) TEST)
B.I. DEFLECTION TEST.
6.1,1. DEFLECTION TESTS SHALL BE CONDUCTED ON ALL PLASTIC PIPE USING A MANDREL
WITH A DIAMETER EQUAL TO 95 PERCENT OF THE INSIDE DIAMETER OF THE PIPE.
THE IIRS I SHALL BE PERFORMED WI I MARC I MECHANICAL PULLING DEVICES.
6,12, ALLOWABLE DEFLECTION; MAXIMUM ALLOWABLE PIPE DEFLECTION SHALL NOT
EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER.
61.3. MANDRIB MANORFI,GO/NOGO, DEVICE SHN I BE CYI INDRICAI IN SHAPE AND
CONSTRUCTED WITH EITHER 9 OR 16 EVENLY SPACED ARMS OR PRONGS,
MANDRELS WITH FEWER ARMS WILL BE REJECTED AS NOT SUFFICIENTLY
ACCURATE. CONTACT LENGTH OF MANDREL'S ARMS SHALL EQUAL OR EXCEED
NOMINAL INSIDE DIAMETER OF SEWER TO BE INSPECTED. CRITICALUMDREL
DIMENSIONS SHALL CARRY TOLERANCE OF 0.01-INCH MAXIMUM. CONTRACTOR
SHALL PROVIDE MANDREL AND NECESSARY EQUIPMENT FOR MANDREL TEST.
614. PROCEDURE'. MANDREL SHALL BE HAND -PULLED THROUGH FLEXIBLE PIPE SEWER
LINES NO EARLIER THAN 30 DAYS AFTER TRENCH HAS BEEN COMPLETELY
BACKFILLED. SECTIONS OF SEWER NOT PASSING MANDREL SHALL BE UNCOVERED
AND REBEDOED, REBOUNDED, OR REPLACED TO SATISFACTION OF OWNER OR
GOVERNING AGENCY. REPAIRED SECTION SMALL BE RETESTED.
SL HYDROSTATICTEST. FORCE MAIN PIPING SHALL BE HYDROSTATICALLY TESTED AT 150
PSI IN ACCORDANCE WITH AMA C 600.
BA PROVIDE MEASURING DEVICES METERS, WATER MATERIALS, AND LABOR FOR MAKING
THE REQUIRED TESTS.
AL. TESTS SMALL BE CONDUCTED IN THE PRESENCE OF THE CONSTRUCTION MANAGER OR
HIS DESIGNEE. TEST DATA SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND
APPROVAL.
ENDOFSECTION
4
!i
NOTE: THE ENGINEER AND/OR OWNER DISCLAIM ANY
ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN
THESE PLANS.
2
•
Know what's below.
Call before you dig
wnnm mcmRo can
811 or 800-382-5544
24 xaun o Day, ] e A W4
PER Ii S HTE uw iRC a-1-20. EXCAVATE
0
tq
N N
o w
C y
>
Q m
H
- O V
Wpm
N
W�
C
J
r
U
F--el
W
W
Wz
Z
�Q
ED
I�
m
C
0)
o.
T
N
ZN
U
MEN
DO
U
m
z
W
i PE11300279
gY. STATE Or
VA
J
w
Q
U
Z_
Q
0
Z
0
ir
w
x
0
CO
w
3
x
0
0
DO
C900
W 18.0605