HomeMy WebLinkAboutSHEET S101 - Shoppes on Main Retail Building (Carmel, IN) 13SPECIAL INSPECTION REQUIREMENTS
BUILDING CODE SECTION 1704 & 1707 REQUIRES A SPECIAL INSPECTOR TO OBSERVE THE WORK ASSIGNED FOR CONFORMANCE TO THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. THESE INSPECTIONS ARE IN ADDITION TO INSPECTIONS
SPECIFIED ELSEWHERE. ENGINEER OF RECORD, LLC DOES NOT PROVIDE THESE INSPECTIONS.
THE OWNER SHALL RETAIN THE SERVICES OF A MATERIAL TESTING AGENCY TO MAKE AVAILABLE A SPECIAL INSPECTOR WHO SHALL PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF LISTED WORK.
SPECIAL INSPECTOR SHALL SUBMIT COPIES OF INSPECTION REPORTS TO THE CONSTRUCTION MANAGER AND THE STRUCTURAL ENGINEER.
SPECIAL INSPECTION REQUIREMENTS FOR WIND RESISTANCE
INSPECTION TASKS
ROOF CLADDING AND ROOF FRAMING CONNECTIONS
CMU WALL CONNECTION TO ROOF DIAPHRAGM AND FRAMING
ROOF DIAPHRAGM SYSTEMS
VERTICAL WIND FORCE RESISTING SYSTEMS
VERTICAL WIND FORCE RESISTING SYSTEMS CONNECTIONS TO FOUNDATION
FABRICATION AND INSTALLATION OF SYSTEMS OR COMPONENTS REQUIRED TO MEET THE IMPACT RESISTANT
REQUIREMENTS OF IBC SECTION 1609.1.2
THE CONTRACTOR RESPONSIBLE FOR CONSTRUCTION OF THE MAIN WIND FORCE RESISTING SYSTEM OR COMPONENT LISTED
ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL PRIOR TO COMMENCEMENT OF
WORK ON THE SYSTEM OR COMPONENT. REFERENCE BUILDING CODE SECTION 1706.1 FOR REQUIREMENTS OF THIS
STATEMENT OF RESPONSIBILITY.
REQUIRED INSPECTIONS DURING CONCRETE CONSTRUCTION
INSPECTION TASK FREQUENCY OF REFERENCE FOR
INSPECTION CRITERIA
1, INSPECTION OF REINFORCING STEEL
INCLUDING PLACEMENT
2. INSPECTION OF REINFORCING STEEL WELDING
IN ACCORDANCE WITH "INSPECTION FOR
STEEL MATERIALS'
3, INSPECT ANCHOR RODS INSTALLED IN CONCRETE
(ONLY RODS WITH DOUBLE NUTS ON BOTTOM)
4. VERIFY USE OF REQUIRED MIX DESIGN
5. SAMPLING OF FRESH CONCRETE, INCLUDING:
SLUMP, AIR CONTENT, CONCRETE TEMPERATURE
AT THE TIME OF MAKING SPECIMENS
FOR STRENGTH EVALUATION
6. INSPECTION OF CONCRETE PLACEMENT FOR
PROPER TECHNIQUES
7. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING
TEMPERATURES AND TECHNIQUES
8. ERECTION OF PRECAST CONCRETE MEMBERS
PERIODIC IACI 318: 3.5, 7.1-7
CONSTRUCTION SAFETY & STABILITY
THE STRUCTURE HAS BEEN DESIGNED ONLY FOR THE IN-SERVICE LOADS. THE METHODS AND MEANS OF
CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO INSURE SAFE WORKING CONDITIONS, PROVIDE FOR PUBLIC SAFETY AND MAINTAIN THE
INTEGRITY OF THE STRUCTURE DURING ALL STAGES OF CONSTRUCTION.
THE STRUCTURAL STEEL FRAME, IN THE COMPLETELY ERECTED AND FULLY CONNECTED STATE REQUIRES
INTERACTION WITH NON-STRUCTURAL STEEL ITEMS (METAL DECK AND SHEAR WALLS, EITHER MASONRY OR
INSPECTION FOR STEEL MATERIALS CONCRETE) FOR STRENGTH AND/OR STABILITY. TEMPORARY BRACING DURING CONSTRUCTION IS REQUIRED.
TEMPORARY SUPPORTS AND BRACES INSTALLED DURING ERECTION SHALL REMAIN IN PLACE UNTIL
INSPECTION TASK FREQUENCY OF REFERENCE FOR COMPLETION OF THE INSTALLATION OF THE STRUCTURAL STEEL FRAME, DIAPHRAGM ELEMENTS AND
LATERAL -LOAD -RESISTING SYSTEM.
INSPECTION CRITERIA
MASONRY AND CONCRETE WALLS ARE NOT DESIGNED TO BE STABLE DURING CONSTRUCTION. THE CONTRACTOR
AISC ASD, SEC. A3.4 SHALL RETAIN A PROFESSIONAL ENGINEER TO DESIGN BRACING FOR THE WALLS. THE CONTRACTOR SHALL
OR INSTALL BRACES IN A TIMELY MANNER TO PREVENT COLLAPSE OF THE WALLS. BRACES SHALL REMAIN IN FLAX
AISC LRFD, SEC. A3.3 UNTIL STRUCTURAL ELEMENTS PROVIDING LATERAL SUPPORT FOR THE WALLS ARE IN PLACE AND THE WALLS
PERIODIC HAVE ATTAINED THE STRENGTH REQUIRED BY THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INSPECT
THE BRACES DAILY AND MAKE ADJUSTMENTS, REPAIRS OR REPLACEMENTS AS REQUIRED INSURING THE
STABILITY OF THE WALLS.
PERIODIC
AISC LRFD, SEC. M2.5 THE CONTRACTOR, ERECTOR OR FABRICATOR SHALL NOTIFY THE ENGINEER OF RECORD AND THE OWNER'S
DESIGNATED REPRESENTATIVE FOR CONSTRUCTION IF CHANGES ARE REQUIRED TO THE STRUCTURAL STEEL
PERIODIC FRAME TO ALLOW ERECTION TO CONFORM TO OSHA REGULATIONS, INCLUDING SUB -PART R. BIDS SHALL BE
BASED ON THE ERECTION METHOD CHOSEN BY THE CONTRACTOR OR ERECTOR. BIDS SHALL INCLUDE THE
CONTINUOUS COST FOR MODIFICATIONS OF THE STRUCTURAL STEEL, STEEL JOISTS, JOIST GIRDERS, METAL DECK OR
LATERAL -LOAD -RESISTING SYSTEM BASED ON THE CHOSEN METHOD.
ASTM A6
OR
PERIODIC ASTM A588 NOTICE TO CONTRACTORS WORKING ON ROOF DECK:
PERIODIC
STEEL DECK INSTITUTE REQUIRES THE ROOF DECK TO SUPPORT A CONCENTRATED CONSTRUCTION LOAD OF
AISC ASD, SECTIONS 200 POUNDS AT MID -SPAN OF A ONE -FOOT WIDE SECTION OF DECK. CONSTRUCTION LOADS SHALL NOT
A3.5 & A3.6 EXCEED THIS VALUE NOR THE UNIFORM LIVE LOAD VALUE SHOWN IN THE DESIGN DATA SECTION OF THE
PERIODIC DRAWINGS.
SUB -CONTRACTOR SHALL DISTRIBUTE LOADS TO ROOF DECK BY APPROPRIATE MEANS TO PREVENT DAMAGE
OF THE ROOF DECK BY CONSTRUCTION ACTIVITIES. SUB -CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS
B. MANUFACTURER'S CERTIFICATE OF PERIODIC
ACI 318: 3.5.2 AND METHODS OF CONSTRUCTION. SUBCONTRACTOR CAUSING DAMAGE TO ROOF DECK DURING
PERIODIC COMPLIANCE CONSTRUCTION IRESPONSIBLE FOR THES COST OF REMOVAL AND REPLACEMENT OF DAMAGED DECK.
AWS D1.4 EXPENSES MAY INCLUDE FEES CHARGED BY THE ENGINEER, ARCHITECT OR TESTING AGENCIES FOR REVIEW
5a. WELDING OF STRUCTURAL STEEL I I AND INSPECTION OF THE ROOF DECK BEFORE AND AFTER REPAIRS.
1. MATERIAL VERIFICATION OF HIGH STRENGTH
BOLTS, NUTS AND WASHERS
A. IDENTIFICATION MARKINGS TO CONFORM
TO ASTM STANDARDS SPECIFIED IN
THE APPROVED CONSTRUCTION DOCUMENTS
B. MANUFACTURER'S CERTIFICATE OF
COMPLIANCE
2, HIGH STRENGTH BOLTING
A. BEARING TYPE CONNECTIONS
B. SLIP CRITICAL CONNECTIONS
3. MATERIAL VERIFICATION OF STRUCTURAL STEEL
A. MATERIAL IDENTIFICATION MARKINGS
B. CERTIFIED MILL TEST REPORTS
4, MATERIAL VERIFICATION WELD FILLER MATERIAL
A. CONFORMANCE TO AWS SPECIFICATION
AS SPECIFIED IN THE APPROVED PLANS
AND SPECIFICATIONS.
CONTINUOUS
IBC: 1912.5
1.
COMPLETE AND PARTIAL PENETRATION
GROVE WELDS
CONTINUOUS
AWS
PIT
PERIODIC
ACI 318: CH.
52-54
4
2.
MULTI -PASS FILLET WELDS
CONTINUOUS
AWS
BIT
CONTINUOUS
ACI 318: 5.6,
ASTM C-172,
5.8
C31
3.
SINGLE -PASS FILLET WELDS
PERIODIC
AWS
DIA
4. FLOOR AND ROOF DECK WELDS
PERIODIC
AWS
D1.3
5b. WELDING OF REINFORCING STEEL
AWS
D1.1
CONTINUOUS
ACI 318: 5.9,
5.10
1.
VERIFICATION OF WELDABILITY OF
REINFORCING STEEL
PERIODIC
AWS
DIA
PERIODIC
ACI 318: 5.11,
5.13
2.
SHEAR REINFORCEMENT
CONTINUOUS
AWS
CIA
3.
OTHER REINFORCEMENT
PERIODIC
AWS
DIA
PERIODIC
ACI 318: Ch.
16
6. STEEL FRAME JOINT DETAILS
APPROVED
CONSTRUCTION
9. EVALUATION OF CONCRETE STRENGTH PERIODIC ACI 318: QUA 1. DETAILS AT BRACES AND STIFFENER PLATES PERIODIC DOCUMENTS
TEMPERATURES AND TECHNIQUES REINFORCING STEEL
LEVEL 1 SPECIAL INSPECTIONS FOR MASONRY CONSTRUCTION 2, MEMBER LOCATIONS PERIODIC
INSPECTION TASK FREQUENCY OF REFERENCE FOR 3. AACHIQN OF JOINT DETAILS AT PERlollc
ATT EEACH CONNECTION
INSPECTION CRITERIA
1, AS MASONRY CONSTRUCTION BEGINS, VERIFY COMPLIANCE
OF THE FOLLOWING WITH THE CONSTRUCTION DOCUMENTS
AND REVIEWED SUBMITTALS.
A. PROPORTIONS OF SITE PREPARED MORTAR
B. CONSTRUCTION OF MORTAR JOINTS
C. LOCATION OF REINFORCEMENT, CONNECTORS AND
ANCHORS
2. VERIFY THE FOLLOWING.
A. SIZE AND LOCATION OF STRUCTURAL ELEMENTS
B. ANCHOR TYPE, SIZE AND LOCATION, INCLUDING
DETAILS OF ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS, FRAMES OR OTHER
CONSTRUCTION.
C. REINFORCEMENT SIZE, GRADE AND TYPE CONFORMS
TO SPECIFICATIONS
D. WELDING OF REINFORCEMENT AND HEADED STUD
ANCHORS
E. PROTECTION OF MASONRY DURING COLD WEATHER
(TEMPERATURE BELOW 40-F)
F. PROTECTION OF MASONRY DURING HOT WEATHER
(TEMPERATURE ABOVE 90'F)
3. PRIOR TO GROUTING, VERIFY THE FOLLOWING:
A. GROUT SPACE IS CLEAN
B. PLACEMENT OF REINFORCEMENT AND DEVICES TO
HOLD REINFORCEMENT IN PLACE DURING GROUTING
C. PROPORTIONS OF SITE -PREPARED GROUT
D. CONSTRUCTION OF MORTAR JOINTS
4, VERIFY GROUT PLACEMENT CONFORMS WITH CODE AND
CONSTRUCTION DOCUMENTS
5, OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR
SPECIMENS AND/OR PRISMS
6. COMPLIANCE WITH INSPECTION PROVISIONS OF
CONSTRUCTION DOCUMENTS AND CODE AND APPROVED
RELEASED FOR CONSTRUCTION
Subject to compliance WA all regulations
of State and Local Codes
City of Cannel
X;OG
DATE: 06/17/19
SPECIAL INSPECTIONS FOR POST INSTALLED ANCHORS
POST INSTALLED ANCHORS MUST BE TESTED PRIOR TO THEIR USE TO SUPPORT OR RESIST ANY LOADS.
NOT LESS THAN 25% OF POST INSTALLED ANCHORS SHALL BE TESTED- TESTING MAY USE TORQUE TESTS OR
PULL OUT TESTS.
PERIODIC
ACI 530.1 ARTICLE 2EA
PERIODIC
ACI
530.1
ARTICLE
33B
PERIODIC
ACI 530.1 ARTICLE 3.4
PERIODIC ACI 530.1 ARTICLE 33G
PERIODIC ACI 530 SECTIONS
1,15.4, 2.1.2
PERIODIC ACI 530 SECTION 1.12
ACI 530.1 ARTICLE 2.4, 3.4
CONTINUOUS I ACI 530 SECTION 2.1.8.E
PERIODIC I ACI 530.1 ARTICLE 1.PC
PERIODIC I ACI 530.1 ARTICLE ISO
PERIODIC
ACI
530.1
ARTICLE
3.2D
PERIODIC
ACI
ACI
530.1
530.1
SECTION
ARTICLE
1.12
3.4
PERIODIC
ACI
530.1
ARTICLE
2.6B
PERIODIC
ACI
530.1
ARTICLE
33B
CONTINUOUS
ACI
530.1
ARTICLE
3.5
CONTINUOUS I ACI 530 -1 ARTICLE 1 4
PERIODIC I ACI 530.1 ARTICLE 1.5
ABBREVIATIONS
A.R.
ANCHOR ROD
FIN,
FINISH
NIC
NOT IN CONTRACT
ARCH.
ARCHITECTURAL
FD
FLOOR DRAIN
NS
NEAR SIDE
B.L.
BUILDING LINE
FS
FAR SIDE
FPS
NOT TO SCALE
B/BM
BOTTOM OF BEAM
PER,
FOUNDATION
NO,
NUMBER
B/F
BOTTOM OF FOOTING
FTG.
FOOTING
ON
ON CENTER
BLDG.
BUILDING
FT
FEET
OFD
OVERFLOW DRAIN
BM,
BEAM
GA.
GAUGE
ODE
OUTSIDE FACE
BRG.
BEARING
GALV.
GALVANIZED
OPP.
OPPOSITE
C.J.
CONSTRUCTION OR CONTROL JOINT
GRAN.
GRANULAR
PC
PRECAST CONCRETE
CL
CENTERLINE
HK,
HOOK
PL
PLATE
BILE.
CLEAR
HORIT
HORIZONTAL
PSF
POUNDS PER SQUARE FOOT
CMU
CONCRETE MASONRY UNIT
NSA
HEADED STUD ANCHOR
RD
ROOF DRAIN
COL
COLUMN
HSS
HOLLOW STRUCTURAL SECTION
REINE
REINFORCEMENT
CONC,
CONCRETE
IJ
ISOLATION JOINT
REQ'D.
REQUIRED
CONNX
CONNECTION
ISF
INSIDE FACE
CONST,
CONSTRUCTION
IN.
INCH
REV.
REVISION
CON].
CONTINUOUS
INSULT.
INSULATION
SEC.
SECTION
CONTR.
CONTRACTOR
J/B
JOIST BEARING
S.F.
STOREFRONT
D.L.
DEAD LOAD
JST.
JOIST
SET
SQUARE FEET
DET.
DETAIL
JT.
JOINT
SHT.
SHEET
DIA
DIAMETER
LB.
POUND
SIM.
SIMILAR
DWG.
DRAWING
ILL
LIVELOAD
SPA
SPACES OR SPACING
DWL
DOWEL
LLH
LONG LEG HORIZONTAL
SPECS
SPECIFICATIONS
EE
EACH END
ST
STEEL
OF
EACH FACE
LLV
LONG LEG VERTICAL
STD
STANDARD
EW
EACH WAY
LSH
LONG SIDE HORIZONTAL
SLR.
STRUCTURE OR STRUCTURAL
EA.
EACH
LN
LONG SIDE VERTICAL
T&B
TOP &BOTTOM
EJ
EXPANSION JOINT
NO
MASONRY OPENING
T/BM
TOP OF BEAM
EL.
ELEVATION
MAIL
MATERIAL
T/FTG
TOP OF FOOTING
EOD
EDGE OF DECK
MAX.
MAXIMUM
IYP.
TYPICAL
EOS
EDGE OF SLAB
MIN,
MINIMUM
T/S
TOP OF STEEL
EQ.
EQUAL
DISC
MISCELLANEOUS
ONO
UNLESS NOTED OTHERWISE
EX
EXIST.
IS
EXISTING
VERT,
VERTICAL
EX
EXPANSION
WWR
WELDED WIRE REINFORCEMENT
W/
WITH
0
z
Z
BUILDING CODE INFORMATION 0
BUILDING CODE AND DESIGN DATA aaaaaaaaaa e0
THE BUILDING STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE INTERNATIONAL 0 w
BUILDING CODE, 2012 EDITION WITH AMENDMENTS
ROOF DESIGN LOADS W
LIVE/RAIN/SNOW.... ............................................... 25 BOB F-
DEAD LOADS:.. ....... .-.............................................15 TO 25 PSF T
GROUND SNOW LOAD(Pg).................................20.0 PSF Q
FLAT -ROOF SNOW LOAD(RE) .............................. 14.0 PSF
SNOW EXPOSURE FACTOR(CE)............................ A Q
SNOW IMPORTANCE FACTOR(1).............................. 1.0
SNOW THERMAL FACTOR ......................................... 1.0
O
OFFICE FLOOR DESIGN LOADS C ZO N
_ LIVE LOAD ... ,......_._..__..._................................ 100 PSF (� i N
DEAD LOADS... 55 PER Q 13 _ a
STORAGE FLOOR DESIGN LOADS O i p z
LIVE LOAD....... ...... ................................................ 125 PSF d -
DEAD LOADS........................................................... 88 PER G : a' En
LIVE LOAD HAS BEEN REDUCED AS ALLOWED BY THE BUILDING CODE. U > W J
`1 O
WIND DESIGN DATA
• 7 Q
BASIC WIND SPEED (3 SECOND GUST)._ ...... ...... 115 MPH (PER ASCE 7-10/IBC 2012) z
WIND LOAD IMPORTANCE FACTOR (1)................... 1.0
WIND EXPOSURE CATEGORY .......... .......................0 11i ❑
INTERNAL PRESSURE COEFFICIENT .......................+/- 0.18 z
WIND DESIGN PRESSURE (P)..............................VARIES WITH HEIGHT
SEISMIC DESIGN DATA
OCCUPANCY CATEGORY..........................................II L1
SEISMIC IMPORTANCE FACTOR (1).. ...... ...... ...... -.1.0
SITE CLASS .... ........ ............. ...... D ❑ c
MAPPED SPECTRAL RESPONSE ACCELERATIONS: 9
SS.... ....... ..................... ............................ ......... 0.147 0 5
S 1...................................
......... ....... ........ .0.082
DESIGN SPECTRAL ACCELERATION
PARAMENERS wS
SD............................_........................._....._..0.1
68
SDI .............................................................0.136
36 G `m
SEISMIC DESIGN CATEGORY .... ....... .............. .......
...0 • m
BASIC SEISMIC RESISTING -SYSTEM: Ar
� � o
w
STRUCTURAL STEEL SYSTEM NOT SPECIFICALLY DETAILED FOR SEISMIC RESISTANCE W c y ur
DESIGN BASE SHEAR. ...... ..... ...... ..... ....... ..... .Cs*W LU
LU = vi
SEISMIC RESPONSE COEFFICIENTS CS................0.034 -a,
RESPONSE MODIFICATION FACTORS R:................ 5.0
_
ANALYSIS PROCEDURE UTILIZED.... EQUIVALENT LATERAL FORCE PROCEDURE z ^
N
W inu_
Z
0
z
w Z W
O L)
zz
O
O F-
DO F-
z
K (q ELI
Oz2
LL - LU
Z Q 2�
W O =)
owO
000.LU
X DESCRIPTION DATE
DRAWING INDEX
SHEETCODE
DESCRIPTION
SIDI
INFORMATION AND SPECIAL INSPECTION REQUIREMENTS
S102
GENERAL NOTES
S201
FOUNDATION PLAN
S221
ROOF FRAMING PLAN
S301
FOUNDATION DETAILS
5302
FOUNDATION DETAILS
S303
MASONRY DETAILS
S321
ROOF FRAMING DETAILS
S322
ROOF FRAMING DETAILS
S331
ROOF FRAMING DETAILS
S332
FRAMING DETAILS
S333
TYPICAL FRAMING DETAILS
S334
TYPICAL STEEL STUD FRAMING DETAILS
O�piiiuippry
E.
�pt5TPq
j PE10IM27
Ao'. STATE OF 'w S
s^ N AOALIII�e
APRIL 10, 2019
18148
S101