HomeMy WebLinkAboutSHEET S221 - Shoppes on Main Retail Building (Carmel, IN) 16i RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 06/17/19 ROOF FRAMING PLAN SCALE: I/8"=1'-0" O Q Q 30K SP1 Wu = 120 PIT Wp1 = 90 PLF GENERAL NOTES: 1. SEE S102 FOR STRUCTURAL NOTES. 2. ALL COLUMNS W10x33 U.N.O. 3, JOIST BEARING ELEVATIONS PER PLAN ELEVATIONS ARE ABOVE REFERENCE FINISHED FIRST FLOOR SLAB ELEVATION 100'-0" 4. JOIST GIRDER LOADS DO NOT INCLUDE GIRDER WEIGHT. 5. BRIDGING SHOWN IS FOR BIDDING. JOIST SUPPLIER SHALL DESIGN AND PROVIDE BRIDGING TO MEET SJI AND OSHA REQUIREMENTS. 6, PROVIDE FRAMES AT EQUIPMENT, DRAINS, FANS AND HATCHES WHERE INDICATED ON ARCHITECTURAL AND STRUCTURAL PLANS. VERIFY SIZE AND LOCATION WITH APPROPRIATE SUB —CONTRACTOR. SEE DETAILS FOR ANGLE SIZES. 7. DESIGN BEAM CONNECTIONS FOR REACTION SHOWN ON PLAN. REACTIONS ARE UNFACTORED SERVICE LOADS, ALLOWABLE STRESS DESIGN. BEAMS WITHOUT REACTIONS NOTED SHALL BE DESIGNED FOR AN END REACTION OF 20 KIPS ONO. 8. DESIGN JOISTS FOR A NET UPLIFT OF 12 PSF. NO INCREASE IN ALLOWABLE STRESS IS ALLOWED. DESIGN JOIST GIRDERS FOR A NET UPLIFT OF 5 EST. 9. VERIFY MECHANICAL EQUIPMENT SIZE, LOCATION, WEIGHT, AND QUANTITIES WITH MECHANICAL CONTRACTOR. STRUCTURAL ENGINEER MUST REVIEW ALL MECHANICAL INFORMATION THAT DIFFERS FROM THAT SHOWN. WCV klr%TCC- 1 1 1/2" 22 GA. TYPE B DECK, MIN. 3—SPAN (SEE SHT. S331) 2 ANGLE FRAME FOR ROOF DRAIN r OVERFLOW DRAIN, ROOF HATCH C MECHANICAL FAN (SEE SHT. S35 S332) OHORIZONTAL BRIDGING PER S.J.I. is O.S.H.A. SPECS. CDDIAGONAL BOLTED BRIDGING PER SJ.I. & O.S.HA. SPECS. OUPLIFT BRIDGING AT FIRST BOTTOM CHORD PANEL POINT EACH END OF EACH JOIST, TYPICAL 8 FUTURE RTU (NOT TO EXCEED 2001 AND FRAME. COORDINATE SIZE, WEIGHT & LOCATION WITH MECHANICAL CONTRACTOR. JOIST SUPPLIER VERIFY MECHANICAL UNIT LOADS AND LOCATIONS WITH G.C. & MECHANICAL CONTRACTOR. DESIGN NOTED JOISTS FOR POINT LOADS SHOWN O7 CANOPY (SEE ARCH.) TYR. O8 TAPERED INSULATION (SEE ARCH. ROOF PLAN) PROVIDE C6x8.2 CHANNEL IN FLUTES B OF ROOF DECK FOR ATTACHMENT OF PARAPET STUD WALL (SEE SECTION FOR LOCATION) SEE S332 & S333 FOR TYPICAL DETAILS K KICKER KB KNEE BRACE XB 'V BRIDGING MOMENT CONNECTION 0 z z O U W H O o � N N C .� p W CM O = Dl O Q S Ln U W J Y O U IL Q O Q • o 0 • M � Z V 0 9 0 U d= o to � c r0 200 M E M W W w o ? a C A IS u I VW 0 Z Z LU W a O ■■ T g a 0 Z_ K LL LL O O CC # DESCRIPTION DATE o,aw°mnii 0 E. 04.I;UtSTPq..AT w j PE10IM27 76 BFATE OF 'w 1RFP. .^ AONAL \F.E� APRIL 10, 2019 18148 S221