HomeMy WebLinkAboutA-111-ROOF-DETAILS-Rev.0DETAILS ON THIS SHEET ARE PROVIDIED SPECIFICALLY TO COMMUNICATE GENERAL REQUIREMENTS OF THE ROOFING SYSTEM. REFERENCE AND COORDINATE ALL APPLICATIONS WITH BUILDING CODES AND MANUFACTURER'S SPECIFIC REQUIREMENTS. Start at either rake and lay in either direction Start at either rake and lay in either direction For maximum wind resistance Continue with full SHINGLE NOTES: Continue with full size size Starter Strip INSTALLATION 1.Continue each course with whole For maximum vend along rakes, install starter stager strip shingle Shingle Start at either rake and shingles. resistancealongrakes, sttla or Cement Shingles to g 9 install starter shingle striacep underla mars[ and each other �mc lay in either tlirection Jr' A p over shingle rake' edges Y 0 �/ orcemyment and a iement.dth of asphalt plastic cAei �. Nadomethebutl edge llT the \` over eaves and rake edges First Course: undetlayment and each cement. / abwetand approsmadly ,A 2. SVlkeachalk line about every to provide tlrip edge. shingleanda roximatel Start with full shingle courses to check parallel alignment other In a4"ic width cement. 1'-and10"-12"Infrom ��� P witheaves. asphalt plastic cement r Second Course: each side � Trim 8" off first shingle Overlap eaves edge Overlap eaves edge Nall approximately 1112"-3" starter strip at least 3' �/ Third Course: starter strip at least 3' ��- some the but edge of the shingle Trim if"off first shingle r i and approximately V -2" and 10" - 72" in from of each side. N¢ Begin starter course with l0" � � Begin matter with l0'— Place shingle 114'-314'wer Fourth Course: E length of starter strip shingle fastened with length of starter strip shingle eaves and rake edges to Trim 1]'off first shingle 2 nails' fazlenetl with 2 nails' proNtle drip edge. Remaining Place first course of shingles Courses: 114'- 314' (6-19mm) over save and -NOTE:For all a applications the butt of the starter shingle must be offset Note: For alla applications, the butt me of the Starter Shingles must be offset from the but of the first course of shingles 4"or Repeat the lst-4th rake edges, covering starter course PP I 9 PP I 9 I 9 Y A A from the butt tarter shingle of thefirst nee to be shingles by 4" or lly to adjust the eaveat. The more. For long eaves, on the piece h Starter Ingle may need to be installed periodically to adjust the offset The frequency of this course instructions on overhang, to provide drip edge. pace of starter shingle may need to be installed periatlically to atljust the offset. The adjustment will depend on the length of the shingles being installedthe remaining courses, frequency of this adjustment will depend on the length of the shingle being installed. starting the fifth course (LESS THAN 6" EXPOSURE) (OF AT LEAST 6" EXPOSURE) wth a full shingle. ARTER STRIP SHI 11 SCAI F- 3/1 IF = 1'-D" DETAIL vVl lion rVliauVr ru (4 quarter -sized dabs of cement on back of shingle) GLE SEALANT LOCATION F 15, i DETAIL i 1%2'from top 1 piece of step fully cover top of each shingle of step Bashing iirgle as shown gle in a quarter- 1 plastic cement Extend leak barrier at lasst 5" up MIL 2 nails per step Testing Place metal step flashing just unstops from exposed edge of shingle and extend 5" over underlying shingle and 5" up the vertical wall. Step flashing pieces monad each other 2" IW14 ING DETAIL r1R'=1w Center full width roll of Carry undetlayment leak barrier. Do not place - at least6" over leak STEP 1: fasteners within 6' of barrier. INSTALL SHINGLES UP TO BOTTOM OF PIPE. center line. Hodzontal laps CUT SHINGLE TO FIT OVERIAROUND PIPE 6" min. AND SET IN ASPHALT PLASTIC CEMENT. 6 STEP 2: non-c Exten flashing t 152 ram `� (156. mm) APPLY BEAD OF ASPHALT PLASTIC CEMENT metal counter �_�__ AROUND EDGES OF FLASHING, THEN SLIDE over over base flashing. se flashing. '=> OO� Clip the top OVER PIPE. USE MINIMUM AMOUNT OF NAILS \ OOO Centerley mi valmntallapsoverlap-- corners of shingles REQUIRED TO SECURE FLANGE. SEAL "- 45D Kowa water FLANGE TO PIPE USING ASPHALT PLASTIC minimum 12" and seal by flmv toward the CEMENT. embedding them i n asphalt valley center. Use one pace metal \ O plastic cement. STEP 3: non-cerrotling step A: CONTINUE SHINGLING, CUTTING TO FIT flashing for each At least 4' AROUND THE FLASHING. CUT SHINGLES TO course. Seal ovetlying (102mm) BE LAID IN BEAD OF CEMENT. shingles to step r A flashing with asphalt t Overlap shingles at plastic cement. Shingles should be least 4" over 20' wide separated 6" at top of valley metal. Embed valley. Separation must the shingle ends in increase 11F per foot asphalt plastic cement towards eaves to handle to seal the shingles th increasing water volume. the metal and keep Snap chalk lines to ensure water from running shingles diverge properly in under them. valley. RELEASED FOR CONSTRUCTION CHIMNEY FLASH Subject to compliance with all regulations ! A-111 SCALE: 3/16"= of State and Local Codes City of Camel DATE: 06/07/19 DETAIL OPEN VALLEY DETAIL A-111 St" Al F- 3/1 N" = 1'-0" VENT i DETAIL = 1'-D" Corer metal flashing with cut shingle. Do NOT nail shingle, install wth asphaltic plastic cement. 'atend leak barrier at least 5' up wall to the deck, NOT to the vertical well) extend up wall at least 5" —Siding/cladding must be at least 2" above the roof surface and covering flashing at east 2'. L PIPE TO FLANGE USING 3 OF ASPHALTIC PLASTIC CEMENT. (STEP 2) FORMED PIPE FLASHING. ET IN BED OF ASPHALTIC -ASTIC CEMENT. (STEP 2) FLANGE WITH SHINGLES (STEP 3) SHINGLE AS NECESSARY. SET IN ASPHALT PLASTIC CEMENT. (STEP 1) H W LU OC z g o LU � o m In ZQW p L u i J >WU - Z O LLI Q r w 0 w iffi z n g E m Q 0 / 0 0 W 0 m vD ISSUED FOR BID & PERMIT C O O cc >� U C QJ co e.7 O O CCD Z C J W W 06 Q CD U s_ c6 U � CD C d C CU E _ CU J W 0 NJ Q CL)LO N = O Lf7 r No Repeon Data Project Number'. 3018082 Date. 0226/2019 Sheet Title and Number. A-111 ROOF DETAILS