Start at either rake and lay in either direction
Start at either rake and lay in either direction
For maximum wind resistance Continue with full SHINGLE NOTES:
Continue with full size size Starter Strip INSTALLATION 1.Continue each course with whole
For maximum vend along rakes, install starter
stager strip shingle Shingle Start at either
rake and shingles.
resistancealongrakes, sttla or Cement Shingles to g 9
install starter shingle striacep underla mars[ and each other �mc lay in either tlirection Jr'
A p over
shingle rake' edges
Y 0 �/
orcemyment and a iement.dth of asphalt plastic cAei �. Nadomethebutl edge
llT the \`
over eaves and rake edges First Course:
undetlayment and each cement. / abwetand approsmadly ,A 2. SVlkeachalk line about every
to provide tlrip edge. shingleanda roximatel Start with full shingle
courses to check parallel alignment
other In a4"ic width
cement.
1'-and10"-12"Infrom ��� P witheaves.
asphalt plastic cement r Second Course:
each side �
Trim 8" off first shingle
Overlap eaves edge
Overlap eaves edge Nall approximately 1112"-3" starter strip at least 3' �/ Third Course:
starter strip at least 3' ��- some the but edge of the shingle Trim if"off first shingle
r i and approximately V -2" and 10" -
72" in from of each side. N¢
Begin starter course with l0" � � Begin matter with l0'— Place shingle 114'-314'wer Fourth Course: E
length of starter strip shingle fastened with length of starter strip shingle eaves and rake edges to Trim 1]'off first shingle
2 nails' fazlenetl with 2 nails' proNtle drip edge.
Remaining Place first course of shingles
Courses: 114'- 314' (6-19mm) over save and
-NOTE:For all a applications the butt of the starter shingle must be offset Note: For alla applications, the butt me of the Starter Shingles must be offset from the but of the first course of shingles 4"or Repeat the lst-4th rake edges, covering starter course
PP I 9 PP I 9 I 9 Y A A
from the butt
tarter shingle
of thefirst
nee to be shingles by 4" or lly to adjust
the
eaveat. The more. For long eaves, on the piece h Starter Ingle may need to be installed periodically to adjust the offset The frequency of this course instructions on overhang, to provide drip edge.
pace of starter shingle may need to be installed periatlically to atljust the offset. The adjustment will depend on the length of the shingles being installedthe remaining courses,
frequency of this adjustment will depend on the length of the shingle being installed. starting the fifth course
(LESS THAN 6" EXPOSURE) (OF AT LEAST 6" EXPOSURE) wth a full shingle.
ARTER STRIP SHI
11 SCAI F- 3/1 IF = 1'-D"
DETAIL
vVl lion rVliauVr ru
(4 quarter -sized dabs of cement on back of
shingle)
GLE SEALANT LOCATION
F
15,
i DETAIL
i 1%2'from top
1 piece of step
fully cover top
of each shingle
of step Bashing
iirgle as shown
gle in a quarter-
1 plastic cement
Extend leak barrier at
lasst 5" up MIL
2 nails per step
Testing
Place metal step
flashing just unstops
from exposed edge of
shingle and extend 5"
over underlying shingle
and 5" up the vertical
wall.
Step flashing pieces
monad each other 2"
IW14
ING DETAIL
r1R'=1w
Center full width roll of
Carry undetlayment
leak barrier. Do not place
-
at least6" over leak
STEP 1:
fasteners within 6' of
barrier.
INSTALL SHINGLES UP TO BOTTOM OF PIPE.
center line. Hodzontal laps
CUT SHINGLE TO FIT OVERIAROUND PIPE
6" min.
AND SET IN ASPHALT PLASTIC CEMENT.
6
STEP 2:
non-c
Exten
flashing
t
152 ram
`�
(156.
mm)
APPLY BEAD OF ASPHALT PLASTIC CEMENT
metal counter
�_�__
AROUND EDGES OF FLASHING, THEN SLIDE
over
over base flashing.
se flashing.
'=>
OO�
Clip the top
OVER PIPE. USE MINIMUM AMOUNT OF NAILS
\
OOO
Centerley mi
valmntallapsoverlap--
corners of shingles
REQUIRED TO SECURE FLANGE. SEAL
"-
45D Kowa water
FLANGE TO PIPE USING ASPHALT PLASTIC
minimum 12" and seal by
flmv toward the
CEMENT.
embedding them i n asphalt
valley center.
Use one pace metal
\
O
plastic cement.
STEP 3:
non-cerrotling step
A:
CONTINUE SHINGLING, CUTTING TO FIT
flashing for each
At least 4'
AROUND THE FLASHING. CUT SHINGLES TO
course. Seal ovetlying
(102mm)
BE LAID IN BEAD OF CEMENT.
shingles to step
r
A
flashing with asphalt
t
Overlap shingles at
plastic cement.
Shingles should be
least 4" over 20' wide
separated 6" at top of
valley metal. Embed
valley. Separation must
the shingle ends in
increase 11F per foot
asphalt plastic cement
towards eaves to handle
to seal the shingles th
increasing water volume.
the metal and keep
Snap chalk lines to ensure
water from running
shingles diverge properly in
under them.
valley.
RELEASED FOR CONSTRUCTION CHIMNEY FLASH
Subject to compliance with all regulations ! A-111 SCALE: 3/16"=
of State and Local Codes
City of Camel
DATE: 06/07/19
DETAIL
OPEN VALLEY DETAIL
A-111 St" Al F- 3/1 N" = 1'-0"
VENT
i DETAIL
= 1'-D"
Corer metal flashing
with cut shingle. Do
NOT nail shingle,
install wth asphaltic
plastic cement.
'atend leak barrier at
least 5' up wall
to the deck, NOT to the
vertical well) extend up
wall at least 5"
—Siding/cladding must
be at least 2" above the
roof surface and
covering flashing at
east 2'.
L PIPE TO FLANGE USING
3 OF ASPHALTIC PLASTIC
CEMENT. (STEP 2)
FORMED PIPE FLASHING.
ET IN BED OF ASPHALTIC
-ASTIC CEMENT. (STEP 2)
FLANGE WITH SHINGLES
(STEP 3)
SHINGLE AS NECESSARY.
SET IN ASPHALT PLASTIC
CEMENT. (STEP 1)
H W
LU OC
z
g
o
LU
�
o
m
In
ZQW
p L u
i
J
>WU
-
Z
O
LLI Q
r
w
0
w
iffi
z
n
g
E
m
Q
0
/
0
0
W
0
m
vD
ISSUED FOR BID &
PERMIT
C
O
O
cc
>�
U
C
QJ
co
e.7
O
O
CCD
Z
C
J
W
W
06
Q
CD
U
s_
c6
U
�
CD
C
d
C
CU
E
_
CU
J
W
0
NJ
Q
CL)LO
N
=
O
Lf7
r
No
Repeon
Data
Project Number'. 3018082
Date. 0226/2019
Sheet Title and Number.
A-111
ROOF DETAILS