Loading...
HomeMy WebLinkAboutA-411-CEILING-DETAILS-Rev.0RCP DETAIL A-411 SCALE: I1/2"=1'-fl" STEEL BUILDING STRUCTURE. REFER STRUCTURAL ANCHOR TO BOTTOM OF STE EL STRUCTURE AS REQUIRED TO SUPPORT LOADING FITTING ADJ. BRACE FITTING TOP & BOTTOM RED'D. 5'0' TYPE'X' GYP, BD. ON 3 5AD MTL STUD FRAMING TO FLOOR ABOVE, 16' O.C. �— �w 3 SW MTL. :TURE, 16' w� RCP DETAIL \�� A-a11 SCALE 1 11 2 REF. RCP STEEL STUD BRACING AS READ. SCHEDULED 5I0' TYPE'lP GYP. B0. ON 3 5B' MTL. STUD FRAMING TO STRUCTURE, 16' C.C. REPi A RCP DETAIL A-411 MMLL'. I I/L"=T-0 VERT. \v\DIAGONAL l REF. STRUCTURES FORSUPPORT ��� KICKERS TYPE ELIHANGER RODSAS N'D1'TO A$ REQ`UD RED'D.PARTITION DECK HANGER BRACKET BV I16'OC. MTL STUDSAT ADJ. BRACE FITTING TOP& BOTTOM ABOVE SECURED kTHIS FOLDING DOOR MANUFACTURERFITTING I" ITOSTRUCTURE CEILING AS SCHEDULED N I ELECTRICAL BOX ETAIL IS FOR INFORMATION 2X4 FIRE RATED SPECIFICATIONBLOCKINGORLT. GAEE GA. MTLCOORDINATE WITH OWNER N D5451 FOR DESIGNHANNEL FURNISHED EXAM LIGHT. IA, ATTACHED TO STUD FOLDING PARTITION FRAMINGL_L FINISHED -ill" CEILING LL CEILING AS SCHEDULED a¢ CEILING COVER REF: RCP CUBICLE CURTAIN OR IV TRACK AS INDICATED MOUNTING PLATE AND CEILING COVER BY LIGHT MANUFACTURER TNT CLNG DTL - MOVE PARTITION TRAUMA RCP DETAIL 05 06 A411 SCALE: 1 1 /2" =1'-D" A-411 SCALE: 1 Q" = Vi I: PARTITION TYPE FOR WALL CONSTRUCTION 511 STUD TO STRUCTURE BRACE AS REG'O CEILING AS I I I' SCHEDULED I I I I I I I - I 1 I I I BE w I I.' BE GYP FURR DOWN ON 3 50 MTL STUDS RELEASED FOR CONSTRUCTION 0314' CASEWCRKWHERE SHOWN IN PLAN Subject to compliance with all regulations of State and Local Codes City M Camel DATE: 06/07/19 PRIME 11S NOTE: I THIS DETAIL IS FOR INFORMATION ONLY. SEE SPECIFICATION SECTION FOR DESIGN CRITERIA. 'A' RCP DETAIL A-411 SCALE'. 111211. 11O" REF. STRUCT. DWGS FOR MEDICALSUPPORT ATTACHMENT DETAILS MEDICAL SUPPORT SYSTEM DESIGNED & DETAILED BY VENDOR FITTING ADJ. BRACE FITTING TOP& BOTTOM VERT. 1111j1Y.eIDTI ADJ. BRACE FITTING TOP &BOTTOM FITTING M CEILING AS SCHEDULED REF. ROOM FINISH SCHEDULE & RCP NOTE: THE'MEDICAL SUPPORT SYSTEM' INSTALLER ISTO COORDINATE THE INSTALLATION OF THE 'MEDICAL SUPPORT SYSTEM' WITH THE RADIOLOGY EQUIPMENT MFR. AND TOVERIFY DESIGN LOADS & EQUIP. SUPPORT REQUIREMENTS. FBF 'C' SCHEDULED 9" = P.D• CONT.TRIMTOBE ATTACHEDTO EQUIPMENT SUPPORT LOWER SUB -RAIL NOTE: REF. STRUCTURAL FOR ADDITIONAL INFORMATION at ING AS MULED BD. ON STRUCTURE, 1V O.C. a-5' STEEL STUD BRACING AS REDD. -RE: PARTITION TYPES FOR WALL CONSTRUCTION 5I0' TYPE 9P GYP, BD. ON 35I8' MTL. STUD FRAMING TO STRUCTURE, 16' O,C, RAT PLATE rsT WELDED TOTUBE 0ARE TUBING (VERTICAL PORT) NNECTEDTOOVERHEAD UCTURE CEILING PER RCP MAIN -RAIL Z � LJ=m �_H 10 a o a _ Z Q yU o � 0LU e d >�U J ZP z 009 W Q z r oldo m w m lN z iffi n 5 m E 0 Z 0 W / m 0 Seals ISSUED FOR BID & PERMIT C CD U C C1J CID C ") C7 CD CCD Z C J LJLJ w CD U C6 U � Cll CL w j CC L = 0 J 0 J Q +� � CC = LO 00 W LO r No Revision Date Project Number 3018082 Date: 0226/2019 Sheet Title and Number. A-411 CEILING DETAILS