HomeMy WebLinkAboutC520 - EROSION CONTROL DETAILSROADWAY
DIVERSION RIDGE
N11H 3.1 SIDE SLOPE
15 / GRADE > TT
B" SILT WORM
BY SILTWORM
PO Box 691
SAINT JOHN, IN 46373
1-219-855-WORM
EMAIL: sales®slltworm.com
WEBSITE: www.S11twori
FLOW
PERIMETER CONTROL:
PLACE SILTWORM DIRECTLY ON TUP OF GRADE, AND OVERLAP ENDS A
MINIMUM OF 6". SITE PREPARATION IS MINIMAL, AND THERE IS NO STAKING
OR TRENCHING REQUIREMENT FOR GRADES UNDER 12X ARRANGE THE
SILTWORM PERIMETER CONTROL IN A MANNER THAT IS APPLIED
PERPENDICULAR TO SHEET ROW.
SLOPE INTERRUPTON:
PLACE SILTWORM PERPENDICULAR TO SHEET ROW AND CURL ENDS UP
TOWARD THE TOP OF THE SLOPE, STAKE THE SILTWORM EVERY 6', AND
OVERLAP THE ENDS BETWEEN 1 TO 2 FEET. PLACE ALINE OF DEFENSE
AT THE TOP OF THE SLOPE, AND ANOTHER WITHIN 10' FROM THE TOE
OF THE SLOPE.
•• INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY
SEVEN CALENDAR DAYS.
• WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABUZED. REMOVE
AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION
MATERIAL, AND RE -STABILIZE
SILT WORM
NOT TO SCALE (REV. 12/18)
RELEASED FOR CONSTRUCTION
Subject to compliance with all Bedell
of State and Local Codes
City of Caned
�VT�V1�08WWWML
DATE: \\ 06/07/19
1W TRIANGULAR SILT DIKE
BY ERO-TE%
N94W14330 DARWN MACE DR.
MENOMONEE FALLS. W 53051
TOLL FREE: 1-Wi-437-6839
APPLY A RUBBERIZED
EMAIL InfoQero-tex.net
ASPHALT EMULSION UNDER THE
WEBSITE: www.wo-tex.net
FULL LENGTH OF THE BARRIER
SECTION AND THE APRON
WORK AREA SIDE
EXISTING
ASPHALT
PAVEMENT
•• INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY
SEVEN CALENDAR DAYS
• WHEN ME CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION
MATERIAL, AND RE -STABILIZE.
SILT DIKE ON EXISTING
ASPHALT PAVEMENT
NOT TO SCALE (REV. 12/18)
100 TRIANGULAR SILT DIKE
BY ERO-TEX
N94W14330 GARWN MACE DR.
MENOMONEE FALLS. W 53051
TOLL Ill 1-856-437-6839
EMAIL: InfoOero-tex.net
WEBSITE: www.em-tex.net
WORK AREA SIDE
APPLY A RUBBERIZED
ASPHALT EMULSION UNDER THE
FULL LENGTH OF THE BARRIER
SECTION AND THE APRON
SAND BAGS TO
SECURE SILT WORM
EXISTING
\ - ASPHALT
PAVEMENT
• INSPECT WITHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERRY
SEVEN CALENDAR DAYS.
• MEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION
MATERIAL, AND RE -STABILIZE.
SILT DIKE AND SILT WORM AT OPENING
ON EXISTING ASPHALT PAVEMENT
NOT TO SCALE (REV. 12/18)
EWER PIPE
F BANK
PLAR
TOP OF DAM 32t a
ram•' EMERGENCY
OVERFLOW
WEIR
BOTTOM OF DAM
YBIN1FNANCE
• INSPECT WTHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY
SEVEN CALENDAR DAYS.
• WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
AND PROPERLY DISPOSE OF ANY UNSTABLE SEDIMENT AND CONSTRUCTION
MATERIAL, AND RE -STABILIZE.
ROCK DONUT DETAIL
NOT TO SCALE (REV. 01/17)
•
DRAINAGE AREA
• LIMITED TO ONE -QUARTER ACRE PER 100 LINEAR FEET OF FENCE.
• FURTHER RESTRICTED BY SLOPE STEEPNESS (SEE TABLE 1).
EFFECTIVE LIFE
• SIX MONTHS (MAXIMUM).
LOCATION
• INSTALLED PARALLEL TO TIE SLOPE CONTOUR.
• MINIMUM OF 10 FEET BEYOND THE TOE OF ME SLOPE TO PROVIDE A BROAD. SHALLOW
SEDIMENT POOL
• ACCESSIBLE FOR MAINTENANCE (REMOVAL OF SEDIMENT AND SILT FENCE REPAIR).
SPACING
TABLE 1. SLOPE STEEPNESS RESTRICTIONS
PERCENT
SLOPE
MAXIMUM DISTANCE
< 2%
< 50:1
100 FEET
2% - 5%
1501 TO 2ol
1 75 FEET
Sx - 10V
1 20:1 TO tot
1 50 FEET
10% - 20x•
I ISO TO 5:1
1 25 FEET
> 20%
1 > S1
115 FEET
*CONSIDER OTHER ALTERNATIVES.
NOTE: MULTIPLE ROWS OF SILT FENCE ARE NOT RECOMMENDED ON THE SAME SLOPE.
TRENCH
• DEPTH: EIGHT INCHES MINIMUM.
• WIDTH: FOUR INCHES MINIMUM.
• AFTER INSTALLING THE FENCE, BACKFILL WTI SOIL MATERIAL AND COMPACT
(TO BURY AND ANCHOR THE LOWER PORTION OF THE FENCE FABRIC).
NOTE AN ALTERNATIVE TO TRENCHING IS TO USE MECHANICAL EQUIPMENT
TO PLOW IN THE SILT FENCE
MATERIALS AND SILT FENCE SPECIFICATIONS
• FABRIC - WOVEN OR NON -WOVEN GEOTEXTILE FABRIC, MEETING SPECIFIED MINIMUMS
OUTLINED IN TABLE 2.
TABLE 2. OWTEXTLE FABRIC SPECIFICATIONS FOR SILT FENCE (MINIMUM)
PHYSICAL PROPERTY
WOVEN
NON -WOVEN
GEOTEXRLE
FABRIC
GEO DMLE FABRIC
FILTERING EFFICIENCY
Wx
TEXTILE STRENGTH AT 20%
ELONGATION
STANDARD STRENGTH
30 LBS.
PER LINEAL INCH
50 LBS.
PER UNEAL INCH
EXTRA STRENGTH
50 LBS.
PER LINEAL INCH
TO LBS.
PER UNEAL INCH
SLURRY FLOW RAZE
0.3 CAL/MIN./SQUARE
FOOT
4.5 GAL
IN. SQUARE FOOT
WATER ROW RAT:
15 GAL./MIN./SQUARE
FOOT
220 GAL./MIN./SQUARE
FOOT
UV RESISTANCE
70%
85%
POST SPACING
]FEET
5 FEET
NOTE: SILT FENCES CAN BE PURCHASED COMMERCIALLY.
• HEIGHT - A MINIMUM OF 18 INCHES ABOVE GROUND LEVEL (W INCHES MAXIMUM).
• REINFORCEMENT - FABRIC SECURELY FASTENED TO POSTS WITH WOOD LAME.
• SUPPORT POSTS - 2x2 INCH HARDWOOD POSTS. STEEL FENCE POSTS MAY BE
SUBSTITUTED FOR HARDWOOD POSTS (STEEL POSTS SHOULD HAVE PROJECTIONS FOR
FASTENING FABRIC).
• SPADING - EIGHT FEET MAXIMUM IS FENCE IS SUPPORTED BY WRE MESH FENCING,
SIX FEET MAXIMUM FOR EXTRA -STRENGTH FABRIC WTNOUT WIRE BACKING.
SEEDING
SEEDBED PREPARATION
• GRADE AND APPLY SOIL AMENDMENTS.
4. DRIVE THE SUPPORT POSTS AT LEAST 18 INCHES INTO THE GROUND. TIGHTLY
STRETCHING TIE FABRIC BETWEEN THE POSTS AS EACH IS DRIVEN INTO THE SOIL. A
MINIMUM OF 12 INCHES OF THE FILTER FABRIC SHOULD EXTEND INTO THE TRENCH. (IF
IT IS NECESSARY TO JOIN THE ENDS OF TWO FENCESp USE THE JOINT METHOD SHOWN.
5. LAY TEE FOUR INCHES OF FILTER FABRIC ON THE BOTTOM OF TIE TRENCH AND
EXTEND IT TOWARD TIE UP -SLOPE SIDE OF TIE TRENCH.
6. BACKFILL THE TRENCH WTH SOIL MATERIAL AND COMPACT IT IN PLACE.
Ni IF THE SILT FENCE IS BONG CONSTRUCTED ON -SITE, ATTACH THE FLIER
FABRIC TO THE SUPPORT PCII (REFER TO TABLES 1 AND 2 FOR SPACING AND
GEOTEXTLE SPEdFlCATONS) AND ATTACH WOODEN LATHE TO SECURE THE
FABRIC TO THE POSTS. ALLOW FOR AT LEAST 12 INCHES OF FABRIC BELOW
GROUND LEVEL. COMPLETE THE SILT FENCE INSTALLATION, FOLDMNG STEPS I
TROUGH 6 ABOVE
• INSPECT WTHIN 24 HOURS OF A RAIN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS.
• IF FENCE FABRIC TEARS. STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE. REPLACE THE AFFECTED PORTION IMMEDIATELY, ALL REPAIRS SHOULD
MEET SPECIFICATIONS AS OUTLINED WITHIN MIS MEASURE.
• REMOVE DEPOSITED SEDIMENT MEN IT IS CAUSING TIE FILTER FABRIC TO BULGE OR
WHEN IT REACHES OIL, -HALF THE HEIGHT OF TIE FENCE AT ITS LOWEST PONT. WHEN
CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. REMOVE THE FENCE AND
SEDIMENT DEPOSITS. GRADE THE SITE TO BLEND WTH THE SURROUNDING AREA. AND
STADIUM
GEOTEXTLE FABRIC 36 INCH (MIN.)
SECURED WTI LATHE HARDWOOD POST
- •il➢k- IL`�I. Emil // Fro
SILT FENCE CONSTRUCTION
NOT TO SCALE (REV. 01/17)
SEEDING FREQUENCY
• SEED ROUGH GRADED AREAS DAILY WIVE SOIL IS STILL LOOSE AND MOIST.
DENSITY OF VEGETATIVE COVER
• EIGHTY PERCENT OR GREATER OVER THE SOIL SURFACE.
MATERIALS
• SOIL AMENDMENTS - SELECT MATERIALS AND RATES AS DETERMINED BY A SOIL TEST
(CONTACT YOUR COUNTY SOIL AND WATER CONSERVATION DISTRICT OR COOPERATIVE
EXTENSION OFFICE FOR ASSISTANCE AND SOIL INFORMATION, INCLUDING AVAILABLE SOIL
TESTNG SERVICES) OR 400 TO 600 POUNDS OF 12-12-12 ANALYSIS FERTILIZER, OR
EQUIVALENT. CONSIDER THE USE OF REDUCED PHOSPHOROUS APPLICATION WHERE SOIL
TESTS INDICATE ADEQUATE PHOSPHOROUS LEVELS IN THE SOIL PROFILE.
• SEED - SELECT APPROPRIATE PLANT SPECIES SEED OR SEED MIXTURES ON THE BASIS
OF QUICK GERMINATON, GROWTH, AND TIME OF YEAR TO BE SEEDED (SEE TABLE 1).
• MULCH - STRAW, HAY, WOOD FIBER, ETC. (TO PROTECT SEEDBED, RETAIN MOISTURE,
AND ENCOURAGE PLANT GROWTH). ANCHORED TO PREVENT REMOVAL BY WIND OR
WATER OR COVERED WITH MANUFACTURED EROSION CONTROL BLANKETS
TABLE 1. SLOPE STEEPNESS RESTRICTONS
SEED SPECIES*
RATE PER ACRE
PUNTING DEPTH
OPTIMUM DATES••
MEAT OR RYE
150 LBS.
1 ' 1-1 2 INCHES
SEPT. 15-OCT. 30
SPRING OATS
1D0 LBS.
1 INCH
MARCH 1-APRIL 15
ANNUAL RYEGRASS
40 LBS.
1/4 INCH
MARCH 1-MAY 1
AUG. 1-SEPT. 1
GERMAN MILLET
40 LBS,
1 TO 2 INCHES
MAY 1-JUNE 1
SUDANGRASS
35 LBS
1 TO 2 INCHES
MAY 1-JULY 30
BUCKWHEAT
60 LBS
1 To 2 INCHES
APRIL 15-JUNE 1
CORN BROADCAST
300 LBS.
1 TO 2 INCHES
MAY 11-AUG. 10
SORGHUM
35 LBS.
1 TO 2 INCHES
MAY 1-JULY 15
*PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO
BE SEEDED WILL REMAIN IDLE FOR MORE THAN ONE YEAR.
**SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF
SEEDING FAILURE. DATES MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF
THE PROJECT WITHIN THE STATE.
NOTES:
MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF
TEMPORARY SEEDING, PROVIDED THAT IT IS APPROPRIATELY ANCHORED.
A HICK POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS,
CUTS, AND IN CHANNELS AND AREAS OF CONCENTRATED ROW.
SEEDING APMICATd
SEEDBED PREPARATION
1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS.
2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT
DONE. APPLY 400 TO 600 POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR
EQUIVALENT.
3. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES BE THE SOIL WITH
A DISK OR RAKE OPERATED ACROSS THE SLOPE.
SEEDING
1. SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE
FROM TABLE 1.
2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING.
PUNT OR COVER SEED TO THE DEPTH SHOWN IN TABLE 1.
NOTES:
1. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED -TO -SOIL
CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR CULTPACKER AFTER
COMPLETING SEED OPERATIONS.
2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFBCTVE.
3. IF SEEDING IS DONE WITH A HYDROSMDER. FERTILIZER AND MULCH CAN BE
APPLIED WITH THE SEED IN A SLURRY MIXTURE.
3. APPLY MULCH AND ANCHOR IT IN PUCE.
SEEDING MAINTENANCE
• INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS.
• CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY.
• MONITOR FOR EROSION DAMAGE AND ADEWATE COVER (80 PERCENT DENSITY); RESEED,
FERTILIZE, AND APPLY MULCH WHERE NECESSARY.
• IF NITROGEN DEFICIENCY IS APPARENT, TOP -DRESS FALL SEEDED WHEAT OR RYE
SEEDING WITH 50 POUNDS PER ACRE OF NITROGEN IN FEBRUARY OR MARCH.
3
4
NOTE: SILT FENCE IS NOT RECOMMENDED FOR USE AS 5.
A DIVERSION AND SHOULD NOT BE USED ACROSS A
STREAM, CHANNEL., DITCH, SWALE, OR ANYWHERE 6.
THAT CONCENTRATED FLOW IS ANTICIPATED.
TABLE 1. MOPE STEEPNESS RESTRICTIONS
MATERIAL*
I RATE PER ACRE
COMMENTS
SHOULD BE DRY, FREE OF UNDESIRABLE SEEDS.
STRAW OR HAY
2 TONS
SPREAD BY HAND OR MACHINE.
MUST BE CRIMPED OR ANCHORED (SEE TABLE 2).
WOOD FIBER
I TON
APPLY WTH A HYDRAULIC MULCH
OR CELLULOSE
MACHINE AND USE WITH TACKING AGENT.
*MULCHING IS NOT RECOMMENDED IN CONCENTRATED FLOWS. CONSIDER EROSION
CONTROL BLANKETS OR OTHER STABILIZATON METHODS.
COVERAGE
• THE MULCH SHOULD HAVE A UNIFORM DENSITY OF AT (EAST 75 PERCENT OVER
THE SOIL SURFACE.
ANCHORING
TABLE 2. MULCH ANCHORING METHODS
ANCHORING
MEMOi
HOW TO APPLY
MULCH ANCHORING TOOL OR
CRIMP OR PUNCH ME STRAW OR HAY TWO TO
FARM DISK (DULL, SERRATED,
FOUR INCHES INTO THE SOIL. OPERATE MACHINERY
AND BLADES SET STRAIGHT)
ON THE CONTOUR OF THE SLOPE.
DEATHS WITH DOZER TRACKS
OPERATE DOZER UP AND DOWN SLOPE TO PREVENT
FORMATION OF RILLS BY DOZER CLEATS.
APPLY ACCORDING To MANUFACTURER'S
WOOD HYDROAULCH FIBERS
RECOMMENDATIONS
SYNTHETIC TACKIFlERS,
APPLY ACCORDING TO MANUFACTURER'S
BINDERS OR SOIL STABILIZERS
RECOMMENDATIONS.
INSTALL NETTING IMMEDIATELY AFTER APPLYING MULCH.
ANCHOR NETTING WITH STAPLES EDGES OF NETTING
NETTING (SYNTHETIC
STRIPS SHOULD OVERLAP WITH EACH UP -SLOPE STRIP
RI
BIODEGRADABLE MATERIAL)
OVERLAPPING FOUR TO SINCHES OVER THE ADJACENT
DOWN -SLOPE STRIP. BEST SUITED MOPE
APPLICATIONS. IN MOST INSTANCES,, INSTALLATION
DETAILS ARE SITE SPECIFIC, MANUFACTURER'S
RECOMMENDATIONS SHOULD BE FOLLOWED.
*ALL FORMS OF MULCH MUST BE ANCHORED TO PREVENT DISPLACEMENT BY WIND
AND/OR WATER.
MULN
1. APPLY MULCH SLAT THE RECOMMENDED RATE SHOWN IN TABLE 1.
2. SPREAD THE MULCH MATERIAL UNIFORMLY BY HAND. HAYFORK. MULCH BLOWER, OR
HYDRAULIC MULCH MACHINE. AFTER SPREADING. NO MORE THAN 25 PERCENT OF THE
GROUND SHOULD BE VISIBLE.
3. ANCHOR STRAW OR HAY MULCH IMMEDIATELY AFTER APPLICATION. THE MULCH CAN BE
ANCHORED USING ONE OF THE METHODS USTED BELOW:
a. CRIMP WITH A MULCH ANCHORING TOOL, A WEIGHTED FARM DISK WITH DULL
SERRATED BLADES SET STRAIGHT, OR TRACK CLEATS OF A BULLDOZER,
b. APPLY HYDRAULIC MULCH WTH SHORT CELLULOSE FIBERS,
c. APPLY A LOAD TACKIFIER, OR
M. COVER WITH NETTING SECURED BY STAPLES.
MULCH YdtlIEbNANCE
• INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS.
• CHECK FOR EROSION OR MOVEMENT OF MULCH; REPAIR DAMAGED AREAS, RESEED,
APPLY NEW MULCH AND ANCHOR THE MULCH IN PUCE.
• CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED.
• IF EROSION IS SEVER OR RECURRING, USE EROSION CONTROL BLANKETS OR OTHER
MORE SUBSTANTIAL STABILIZATION METHODS TO PROTECT THE AREA.
3
0
I GEOTEXTLE FABRIC
e• MIN. UNDERLINER
GROSS SECTION
150' MINIMUM
GEOTEXTLE FABRIC
UNDERUNE
8• MINIMUM INGOT CA
NO. 2 AGGREGATE
AVOID LOCATING ON STEEP SLOPES OR AT CURVES IN PUBLIC ROADS.
3IONS
WIDTH: TWENTY (20) FEET MINIMUM OR FULL WIDTH OF ENTRANCE/EXIT ROADWAY,
WHICHEVER IS GREATER.
LENGTH: ONE -HUNDRED FIFTY (150) FEET MINIMUM (LENGTH CAN BE SHORTER FOR
SMALLER SIZES).
THICKNESS: EIGHT (8) INCHES MINIMUM.
MILES
ONE (1) TO TWO AND ONE-HALF (2-1/2) INCH DIAMETER WASHED AGGREGATE (INDOT CA
NO. 2).
ONE-HALF (1/2) TO ONE AND ONE-HALF (1-1/2) INCH WASHED AGGREGATE (INGOT CA
NO. 53); OPTIONAL. USED PRIMARILY WHERE THE PURPOSE BE THE PAD IS TO KEEP SOIL
FROM ADHERING TO VEHICLE TRES.
GEOTEXTILE FABRIC UNDERLAYMENT (USED AS A SEPARATE LAYER TO PREVENT
INTERMIXING OF AGGREGATE AND THE UNDERLYING SOIL MATERIAL AND TO PROVIDE
GREATER BEARING STRENGTH MEN ENCOUNTERING WET CONDITIONS OR SOILS WITH
SEASONAL HIGH WATER TABLE LIMITATIONS).
REMOVE ALL VEGETATION AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION
AREA.
GRADE FOUNDATION AND CROWN FOR POSITME DRAINAGE. IF THE SLOPE OF THE
CONSTRUCTION ENTRANCE IS TOWARD A PUBLIC ROAD AND EXCEEDS TWO (2) PERCENT,
CONSTRUCT AN EIGHT (8) INCH HIGH DIVERSION RIDGE WITH A RATIO OF 3-TO-1 SIDE
SLOPES ACROSS THE FOUNDATION AREA ABOUT 15 FEET FROM THE ENTRANCE TO DIVERT
RUNOFF AWAY FROM TIE ROAD (SEE CROSS-SECTION MEW ABOVE).
INSTALL A CULVERT PIPE UNDER TIE PAD IF NEEDED TO MAINTAIN PROPER PUBLIC ROAD
DRAINAGE
IF WET CONDITIONS ARE ANTICIPATED, PLACE GEOTEXTIM FABRIC ON THE GRADED
FOUNDATION TO IMPROVE STABILITY.
PLACE AGGREGATE (INGOT CA NO. 2) TO THE DIMENSIONS AND GRADE SHOWN IN THE
CONSTRUCTION PLANS. LEAVING THE SURFACE SMOOTH AND SLOPED FOR DRAINAGE.
MERE POSSIBLE. DIVERT ALL STORM WATER RUNOFF AND DRAINAGE FROM THE
TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD TO A SEDIMENT TRAP OR BASIN
CONTROL.
WASHED ONTO PUBLIC ROADS.
THE CONSTRUCTION DRIVE CAN BE
Commercial Real Estate Solutions®
No
O■ AMERICAN
M■ STRUCTUREPOINT
■ INC.
72N SNaleftend Si I Indianapolis, Indiana 46256
TEL 317.517.55861 FAX 317.543.11
www.Mructurepoini
Intuitive Health
Riverview Health
Urgent Care &
Emergency Room
14585 Hazel Dell
Parkway
Carmel, Indiana
< No.
IF 10403915
STATE OF
�Jvw I�+I-I•/
CERTIFIED BY
ISSUANCE INDEX
DATE:
03/11/2019
PROJECT PHASE:
FINAL CONSTRUCTION PLANS
�d W�ti I] �•YI11:7191 W Riti ILV �
Project Number 2018.00290
EROSION CONTROL
DETAILS
C520