HomeMy WebLinkAboutA121 Reflected Ceiling PlanLEGEND
NEW OR RELOCATED EXISTING TO REMAIN
IN 01
LIGHT FIXTURE, 2'x4',
LIGHT FIXTURE, 2'x4',
FLUORESCENT, PARABOLIC
FLUORESCENT, PARABOLIC
❑LIGHT
FIXTURE, 2'x2',
LIGHT FIXTURE, 2'x2',
FLUORESCENT, PARABOLIC
FLUORESCENT, PARABOLIC
RECESSED LIGHT
jX
RECESSED LIGHT
FIXTURE
FIXTURE
DIRECTIONAL RECESSED
LIGHT FIXTURE
WALL SCONCE LIGHT
WALL SCONCE LIGHT
FIXTURE
FIXTURE
®LIGHT
FIXTURE,
®
LIGHT FIXTURE,
PENDANT
PENDANT
®
EXIT LIGHT FIXTURE
®
EXIT LIGHT FIXTURE
EMERGENCY LIGHT
EMERGENCY UGHT FIXTURE
FIXTURE
$N
LIGHTSWITCH
$
LIGHTSWITCH
$N3
LIGHT SWITCH, 3-WAY
$3
LIGHT SWITCH, 3-WAY
$ND
LIGHT SWITCH, DIMMER
$D
LIGHT SWITCH, DIMMER
$NP
SWITCH, PROJECTOR SCREEN
$P
SWITCH, PROJECTOR SCREEN
$NG
SWITCH, GARBAGE DISPOSAL
$G
SWITCH, GARBAGE DISPOSAL
(ABOVE COUNTERTOP)
$NE
SWITCH, EXHAUST FAN
$G
SWITCH, EXHAUST FAN
i —
LIGHTCIRCUIT
-
LIGHTCIRCUIT
CEILING GPoD,
CEILING GPoD,
SUSPENDED, 2a2'
_ __�__r_
SUSPENDED, 2a2'
GYPSUM BOARD
GYPSUM BOARD CEILING
CEILING
RELOCATED
DIFFUSER, LAYJN, 2'X2'
❑
DIFFUSER LAYJN, TX7
El
RELOCATED
EXISTING DIFFUSER, LAYJN, Px4'
®
DIFFUSER, LAY IN, Px4'
RELOCATED
EXISTING DIFFUSER, LAY-N.
®
DIFFUSER, LAY -IN, 4'k4'
®
4"x4'
®
EXHAUST FAN, 2'{'
EXISTING EXHAUST FAN, TX7
NOTE: IF IN GOOD CONDITION, EXISTING H.V.A.C. DEVICES AND CEILING TILES
SALVAGED FROM DEMOLITION CAN BE SUBSTITUTED FOR NEW. NO NEW
HVAC DUCTWORK IS TO BE INSTALLED PER THIS SHEET.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City Bf Catmel
DATE: 06/17/19
RELOCATE DIFFUSERS &
MECHANICAL DIFFUSER RELOCATION
nTaT 'REFER TO MECHANICAL NOTES FOR FURTHER INFORMATION
GENERAL NOTES
REUSE EXISTING CEILING GRID AND TILE UNLESS OTHERWISE NOTED. EXISTING GRID IS 2x2 AT 9'LWA.F.F.
TILES ARE 2x2 ACOUSTICAL LAY IN TILES. REPAIR ANY DAMAGED GRID AND REPLACE ANY DAMAGED
TILES WITH NEW TO MATCH EXISTING.
2. PROVIDE LIKE CEILING TILES IN INDIVIDUAL ROOMS WHERE POSSIBLE TO CREATE UNIFORM LOOK.
3. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY
BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE
SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. IN
RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE, ALL
LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR TENANT PRIOR TO INSTALLATION, FAILURE
TO DO SO MAY RESULT IN CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE.
4. UNLESS NOTED OTHERWISE. THE LIGHTS SHOWN AS 'NEW OR RELOCATED" ARE TO BE RELOCATED FROM
A PREVIOUS LOCATION AS SHOWN ON THE DEMOLITION PLAN. THE DESIGN INTENT IS LESS THAN 50%OF
THE LIGHTS ARE ACTUALLY BEING REPLACED WITH NEW AND OVERALL WATTAGE IS STAYING THE SAME
OR DECREASING, LAYOUT SHOWN IS INTENDED TO MEET ASHRAE 90.1 STANDARDS, ELECTRICAL
CONTRACTOR IS RESPONSIBLE FOR COMPLIANT INSTALLATION. IF ADJUSTMENT IS REQUIRED TO MEET
ASHRAE 90.1, CONTRACTOR MUST NOTIFY SDI,
5. IF PROJECT CRITERIA REQUIRES ALL NEW SWITCHES TO BE OCCUPANCY SENSORS, PROVIDE COMBO UNIT
WITH BOTH ULTRASONIC AND INFRARED TECHNOLOGY WITH A ONE BUTTON OVERRIDE. OCCUPANCY
SENSORS ARE TO BE LOCATED SUCH THAT OCCUPANCY WITHIN ANY PORTION OF INCLUDED AREA IS
DETECTED. PROVIDE CEILING MOUNTED OCCUPANCY SENSORS IN OPEN AREAS AS REQUIRED, OR
RELAY TIME CLOCK CONTROLS (COORDINATE WITH SDI). EXISTING SWITCHES TO BE CONVERTED IF
REQUIRED BY CODE.
6. NEW DEVICES AND FACE PLATES TO MATCH EXISTING WHERE POSSIBLE, GANG MULTIPLE SWITCHES TO
ACCOMMODATE MULTI -SWITCH PLATE WHEN SWITCHES ARE SHOWN ADJACENT ON PLAN.
7. ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL
ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AND
LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING.
ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT
ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES.
MECHANICAL NOTES PLAN NOTES
I. MECHANICAL WORK IS LIMITED TO A DESIGN- BUILD SCOPE AND IS
OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL
APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED, ALL
MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND
FLEX DUCT PER NEW WALL LAYOUT, NO NEW HARD DUCTWORK OR
EQUIPMENT IS BEING ADDED; MECHANICAL CONTRACTOR IS TO
NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO
THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE
INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES.
PROVIDE (2) PENDANTS CENTERED EQUALLY OVER ISLAND.
RV1 PROVIDE SEPARATE SWITCH. ASSUME ALLOWANCE OF$800 EACH
MATERIAL COST.
RD2 NOT USED,
OR03RELOCATE SALVAGED PROJECTOR SCREEN PROJECTORS AND
COORDINATING EQUIPMENT. CONFIRM EXACT LOCATION WITH
TENANT AND TENANTS FURNITURE VENDOR. PROVIDE SWITCHES
AS REQUIRED FOR AUTOMATIC SCREEN CONTROL.
® AREA NOT IN CONTRACT REFLECTED CEILING PLAN
N
❑ AREA OF WORK 0 4' 8' 16'
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF SCH07 D51GN.
Z
O
�
Woa0
Q
W
`Z`
i%
=
Q
Q
T1
0
Z
i
p
O
Lu
t/7
OO
LL1
Y
=
Zap
pw
CL
0
O
NO
ISSUE
DATE
DESCRIPTION
03.04.19
REVIEW SET
03.13.19
CHECKSET
03.19.19
ND SET
04.24.19
CONSTRUCTION SET
EVISIONS
ARK
DATE
DB
DESC NPTION
PROJECT NUMBER
2019.049
I'llMGR DRAWN BY
SD�
4TH FLOOR
REFLECTED
CEILING PLAN
Al21