HomeMy WebLinkAboutD100 Demo PlanLEGEND
EXISTING TO BE REMOVED EXISTING TO REMAIN
WALL
vxvxox PARTIAL HEIGHT WALL
DOOR AND FRAME
WINDOW/SIDELIGHT
Ji —L CEILING GRID AND
TILES, 2'x4'
-- CEILING GRID AND
TILES, 2'x2'
F-
�::� SUPPLY AIR DIFFUSERS
e_a
eeuo
EXHAUST FAN
� LIGHT FIXTURE,
�L___ Jj FLUORESCENT, 2'x4'
rm1 LIGHT FIXTURE,
L_J FLUORESCENT, 2'x2'
ri LIGHT FIXTURE, CAN
•----+ LIGHT FIXTURE,
FLUORESCENT
eye-..-LLi LIGHT FIXTURE, TRACK
LIGHT FIXTURE,
LIGHT FIXTURE,
f�l
PENDANT
LIGHT SWITCH
<Y
EXIT LIGHT
E-]
EMERGENCY LIGHT
-;' -iO ELECTRIC OUTLETS)
DATA OR
T COMMUNICATION
OUTLET
WALL
� PARTIAL HEIGHT WALL
77 DOOR AND FRAME
x WINDOW/SIDELIGHT
NOTE: EXISTING FIXTURES THAT ARE REMOVED CAN BE REUSED IF IN
GOOD CONDITION.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 06/17/19
GENERAL NOTES
I. REMOVE EXISTING RECEPTACLES AND/OR SWITCHES AS SHOWN
ON PLAN PER LEGEND. PATCH WALL AND PREPARE FOR NEW
FINISHES AS REQUIRED.
PLAN NOTES
D01 REMOVE EXISTING CABINETRY AN D COUNTERTOP.
DD2 REMOVE EXISTING SINK. NO SERVICE SINKS ARE BEING REMOVED,
REMOVE PORTION OF WING WALLS AS SHOWN. PATCH AND
D03
PREPARE FOR NEW PAINT.
004 SALVAGE PROJECTOR SCREEN, PROJECTOR, AND ALL
COORDINATING EQUIPMENT FOR RELOCATION. SEE REFLECTED
CEILING PLAN FOR MORE INFORMATION.
DOS REMOVE CHAIR RAIL AND WHITE BOARD FROM ALL WALLS.
PREPARE FOR NEW FINISHES. SEE A/131 FOR MORE INFORMATION.
D06 NO WORK IN THIS ROOM UNLESS OTHERWISE NOTED.
SALVAGE EXISTING CARPET IN THIS AREA FOR PATCH WORK. SEE
00] FINISH PLAN FOR MORE INFORMATION. CLEAN AS REQUIRED.
ZI AREA NOT INCONTRACT DEMOLITION PLAN N
0 4' 8' 16'
❑ AREA OF WORK
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCH07
DESIGN, INC.. AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT TEE WRITTEN
CONSENT OF SCHOTT DESIGN.
Z
O
J
Woo
Z
vIL
Q
W
H
~
Z
Q
N
0
Z
p
Ow
�
HOB
v
Y
=
Zap
F-
Ow
CL
()�
CD
ISSUE
DATE
DESCRIPTION
03.04.19
REVIEW SET
03.13.19
CHECKSET
03.19.19
ND SET
04.24.19
CONSTRUCTION SET
REVISIONS
ARK
DATE
DB
DESG RIPTION
iiiiiiiim
PROJECT NUMBER
2019.049
PROD. MGR DRAWN BY
SDH JJ
4TH FLOOR
DEMOLITION PLAN
DIII